Home / Browse projects / Thane, Maharashtra / SHREESHA HEIGHTS

Registered No litigation declared Residential / Group Housing project

SHREESHA HEIGHTS

By VASTUNIRMAN DEVELOPERS

RG-MH-06510 · RERA P51700053108 · Last updated on MahaRERA portal: 28 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
91 of 93Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

SHREESHA HEIGHTS is a Residential / Group Housing project by VASTUNIRMAN DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700053108 on 16 Oct 2023. Possession is promised by 15 Aug 2028. 2 of the 93 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHREESHA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • SUVEY NO 111/A AND 112/1
    • VILLEGE CHIKANGHAR
    • Chikanghar
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053108
  • ReraGenie IDRG-MH-06510

Builder

  • NameVASTUNIRMAN DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFV5797P1ZU
  • PartnersALIM ABDUL KAFIR FOUZI, SHARAD SHANKAR KANSE, VAISHALI VISHNU CHANDE, MRUNAL RAM REPALE

Key dates

this monthRegisteredOct 2023PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion15 Aug 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed62 files

Current status

2%2 of 93 units booked

Figures as on 28 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING TYPE 1 COMMERCAILNA4301818
TYPE 2 BUILDING WING ANA2011375075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

BUILDING TYPE 1 COMMERCAIL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE 2 BUILDING WING A21%
ActivityProgress
Excavation90%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed627

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots627
Closed/Covered184
Open Space443
BuildingClosed/CoveredOpen SpaceTotal
BUILDING TYPE 1 COMMERCAIL11920
TYPE 2 BUILDING WING A183424607

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,813 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2026
LandownerVillageDistrict
SHREE SWAMI SMARTH CHS LTDChikangharThane
PUSHPAKDHARA CO OP HSG SOC LTDChikangharThane

Approvals and building plan

Sanctioning authoritykalyan dombivali municipal corporation
Permissible FSI27463.86
Proposed, not sanctioned13,732 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHotel Ashok, Bhiwandi, Bhiwandi Kalyan Road, Thane, Maharashtra 421302

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFOUZI & ASSOCAITES
Engineeraamir a momin
Chartered AccountantPrakash Anil Thakkar
Chartered AccountantGaurav Dalwani Dalwani
PartnerRole in project
VASTUNIRMAN DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Aug 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Architect certificate --- (30-06-2024)-signed.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Architect certificate --- (30-09-2024)-signed.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Architect certificate --- (31-12-2024)-signed.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 jun 24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sep 24 (2).pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 DEC 24.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Engineer's certificate --- (30-06-2024)-signed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Engineer's certificate --- (30-09-2024)-signed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Engineer's certificate --- (30-09-2024)-signed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Engineer's certificate --- (31-12-2024)-signed.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Architect certificate --- (31-03-2024).pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Engineer's certificate --- (31-03-2024).pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Word.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Date 31-12-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Date 31-12-23.pdf1 Mar 2024
Copy of the legal title reportFile: finaltital.pdf18 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUBERSMNET FINANCE.pdf14 Sep 2023
Details of encumbrances concerned to LegalFile: ENCUBERSMNET FINANCE.pdf14 Sep 2023
CERSAI detailsFile: cersai certificate.pdf9 Sep 2023
Proforma of Agreement for saleFile: vastu afs.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Aug 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMSEMENT LEGAL.pdf27 Aug 2023
Details of encumbrances concerned to LegalFile: NO ENCUMSEMENT LEGAL.pdf27 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf27 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Aug 2023
CERSAI detailsFile: cersai certificate 112.pdf27 Aug 2023
Proforma of Allotment letterFile: AGREEMENT FOR SALES.pdf27 Aug 2023
Deviation Report with respect to Allotment letterFile: dEVIATION - Allotment Letter Format.pdf27 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation model draft agreement.pdf27 Aug 2023
Layout approvalFile: 6.pdf22 Aug 2023
Layout approvalFile: 7.pdf22 Aug 2023
Layout approvalFile: 8.pdf22 Aug 2023
Layout approvalFile: 9.pdf22 Aug 2023
Layout approvalFile: 10.pdf22 Aug 2023
Layout approvalFile: 11.pdf22 Aug 2023
Layout approvalFile: 12.pdf22 Aug 2023
Building plan approvalFile: 12.pdf22 Aug 2023
Layout approvalFile: 5.pdf22 Aug 2023
Layout approvalFile: 4.pdf22 Aug 2023
Layout approvalFile: 3.pdf22 Aug 2023
Layout approvalFile: 1.pdf22 Aug 2023
Layout approvalFile: 2.pdf22 Aug 2023
PAN CardFile: pan vASTU.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 1.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 2.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 3.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 4.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 5.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 6.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 7.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 8.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 9.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 10.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 11.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: 12.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 Aug 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf22 Aug 2023
Declaration in FORM BFile: AFFIDEVIT.pdf22 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report_200276828394_For_Asset_Based_Search_08_08_2023_13_30_26_666.pdf22 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousre of Int.pdf22 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC.pdf22 Aug 2023

How this compares with Thane

2%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREESHA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLEGE CHIKANGHAR7,600+ in Thane

2 kmSHREESHA HEIGHTSCompleted 97Lapsed / revoked 58Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 311 registered projects within 2 km.

Builder: VASTUNIRMAN DEVELOPERS

VASTUNIRMAN DEVELOPERS has 1 registration on MahaRERA, including SHREESHA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREESHA HEIGHTS is delayed beyond 15 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREESHA HEIGHTS?

The registered promoter entity is VASTUNIRMAN DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFV5797P1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREESHA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREESHA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREESHA HEIGHTS?

The professionals named in the filing: Architect: FOUZI & ASSOCAITES; Engineer: aamir a momin; Chartered Accountant: Prakash Anil Thakkar; Chartered Accountant: Gaurav Dalwani Dalwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREESHA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREESHA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREESHA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.