SHREEPATI JEWELS
RG-MH-11781 · RERA P51900001201 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 96 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEPATI JEWELS is a Residential / Group Housing project by SHREEPATI JEWELS in GIRGAUM DIVISION, 400004, registered with MahaRERA as P51900001201 on 27 Jul 2017. Possession is promised by 31 Dec 2032. The completion date has moved by 96 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameSHREEPATI JEWELS
- TypeResidential / Group Housing
- Location
- TATYA GHARPURE MARG & KHARATAR ALI MARG
- GIRGAUM DIVISION
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900001201
- ReraGenie IDRG-MH-11781
Builder
- NameSHREEPATI JEWELS
- Entity typeOthers
- GSTIN27AAPFS8232F1ZV
- Named personsRAJENDRA CHATURVEDI, TAPAS CHATURVEDI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2017
- Promised completion31 Dec 2032
- Revised completionRevised to 31 Dec 2032 (originally 30 Dec 2024)
- Buildings7 building records
- Documents filed178 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING D | NA | 68 | 0 | 0 | 0 | 0 |
| WING E | NA | 67 | 0 | 0 | 0 | 0 |
| WING F | NA | 35 | 0 | 0 | 0 | 0 |
| WING G | NA | 35 | 0 | 0 | 0 | 0 |
| WING H | NA | 39 | 0 | 0 | 0 | 0 |
| WING I | NA | 23 | 0 | 0 | 0 | 0 |
| WING A | NA | 39 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 94%.
WING D48%
| Activity | Progress |
|---|---|
| Excavation | 30% |
| Basement (if any) | 30% |
| Podiums (if any) | 40% |
| Plinth | 30% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 66% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 53% |
| Sanitary Fittings within the flats / premises | 48% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 46% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
WING E48%
| Activity | Progress |
|---|---|
| Excavation | 30% |
| Basement (if any) | 30% |
| Podiums (if any) | 40% |
| Plinth | 30% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 66% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 53% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 48% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 46% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
WING F69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 94% |
| Sanitary Fittings within the flats / premises | 63% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
WING G69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 94% |
| Sanitary Fittings within the flats / premises | 62% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
WING H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING I0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 12% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed763
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING D | 0 | 276 | 276 |
| WING E | 0 | 275 | 275 |
| WING F | 35 | 1 | 36 |
| WING G | 0 | 110 | 110 |
| WING H | 0 | 60 | 60 |
| WING I | 0 | 6 | 6 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LD SHAH |
| Architect | KALPESH SHAH |
| Engineer | JAGDISH MR PATIL CONSULTING ENGG PVT LTD |
| Engineer | SUNIL M SOHANI |
| Chartered Accountant | S M GUPTA AND CO |
| Chartered Accountant | HARSHAL CHHADVA |
| Partner | Role in project |
|---|---|
| SHREEPATI JEWELS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to FSI change and amalgamation of plots and extended cluster boundary.
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 596/2010 | CITY CIVIL COURT | FOR REPLY |
| 906/2010 | CITY CIVIL COURT | FOR ARGUMENT |
| 971/2013 | CITY CIVIL COURT | DISPOSED |
| 1456/2014 | CITY CIVIL COURT | FOR REPLAY |
| RAE/201661/2013 | SMALL CAUSES COURT | PART HEARD |
| RAER/200834/2009 | SMALL CAUSES COURT | DISPOSED |
| 978/2018 | High Court | DISPOSED |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056772 | Prozone Developers and Realtors Pvt Ltd | M/s Shreepati Jewels | 30/10/2018 |
| CC006000000161392 | Mr. MOHAMMAD REZA KABUL | SHREEPATI JEWELS | 02/11/2019 |
| CC006000000193987 | Neelamraj Ratanlalji Soni | Shreepati Jewels | 29/09/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2032
Documents filed178
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 Jewels 2024-25.pdf | 28 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Jewels 2023-24.pdf | 28 Apr 2026 |
| Form 5 (FY 2020-2021)File: Form 5 2020-2021.pdf | 28 Apr 2026 |
| Form 1File: Form 1.pdf | 27 Apr 2026 |
| Form 2File: Form 2.pdf | 27 Apr 2026 |
| Form 3File: Form 3.pdf | 27 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf | 27 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 27 Apr 2026 |
| Form 1File: Form 1.pdf | 31 Jan 2026 |
| Form 2File: Form 2.pdf | 31 Jan 2026 |
| Form 3File: Form 3.pdf | 31 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf | 31 Jan 2026 |
| Form 1File: Form 1.pdf | 4 Nov 2025 |
| Form 2File: Form 2.pdf | 4 Nov 2025 |
| Form 3File: Form 3.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold &unsold Inventory.pdf | 4 Nov 2025 |
| Form 1File: Architects Certificate.pdf | 31 Jul 2025 |
| Form 2File: Engineers Certificate.pdf | 31 Jul 2025 |
| Form 3File: CA Certificate.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf | 31 Jul 2025 |
| Declaration in FORM BFile: FORM- B.pdf | 3 Mar 2025 |
| Certificates of CA (Form 3)File: CA FORM -3.pdf | 3 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD (1).pdf | 3 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Completion letter (Kalpesh Shah) 02-01-2025.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Completion letter (Sunil Sohani) 02-01-2025.pdf | 24 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sunil Sohani (Civil Engineer).pdf | 20 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A.PDF | 6 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.PDF | 6 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Jewels.pdf | 24 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 (1)_11zon.pdf | 28 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 16 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 (2).pdf | 16 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD -BOOKED INVENTORY.pdf | 16 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC ARCHITECTURE CERTIFICATE.pdf | 28 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC ENGINEER.pdf | 28 Feb 2024 |
| Building plan approvalFile: download (3).pdf | 9 Feb 2024 |
| Building plan approvalFile: 16 (1).pdf | 9 Feb 2024 |
| Building Plan Approval (IOD)File: download (3).pdf | 9 Feb 2024 |
| Building Plan Approval (IOD)File: 16 (1).pdf | 9 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 30-09-2023.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventry DEC 2023.pdf | 23 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 Jewels 2023_compressed.pdf | 18 Jan 2024 |
| Layout approvalFile: HIGH LIGHT PLAN.pdf | 6 Jan 2024 |
| Building plan approvalFile: 1.pdf | 6 Jan 2024 |
| Building plan approvalFile: 2.pdf | 6 Jan 2024 |
| Building plan approvalFile: 3.pdf | 6 Jan 2024 |
| Building plan approvalFile: 4.pdf | 6 Jan 2024 |
| Building plan approvalFile: 5.pdf | 6 Jan 2024 |
| Building plan approvalFile: 7.pdf | 6 Jan 2024 |
| Building plan approvalFile: 8.pdf | 6 Jan 2024 |
| Building plan approvalFile: 9.pdf | 6 Jan 2024 |
| Building plan approvalFile: 10.pdf | 6 Jan 2024 |
| Building plan approvalFile: 11.pdf | 6 Jan 2024 |
| Building plan approvalFile: 12.pdf | 6 Jan 2024 |
| Building plan approvalFile: 13.pdf | 6 Jan 2024 |
| Building plan approvalFile: 14.pdf | 6 Jan 2024 |
| Building plan approvalFile: 17.pdf | 6 Jan 2024 |
| Layout approvalFile: FINAL PLAN HIGHLIGHTED.pdf | 6 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: HIGH LIGHT PLAN.pdf | 6 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: FINAL PLAN HIGHLIGHTED.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 1.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 2.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 3.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 4.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 5.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 7.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 8.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 9.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 10.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 11.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 12.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 13.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 14.pdf | 6 Jan 2024 |
| Building Plan Approval (IOD)File: 17.pdf | 6 Jan 2024 |
| Certificates of CA (Form 3)File: JUNE CA CERTIFICATE COMPRESS.pdf | 6 Jan 2024 |
| Certificates of CA (Form 3)File: SEPTEMBER CA CERTIFICATE COMPRESS.pdf | 6 Jan 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 29 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 178 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREEPATI JEWELS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GIRGAUM DIVISION
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Earth Enclave
Earth Graphics
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Builder: SHREEPATI JEWELS
SHREEPATI JEWELS has 1 registration on MahaRERA, including SHREEPATI JEWELS. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if SHREEPATI JEWELS is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEPATI JEWELS?
The registered promoter entity is SHREEPATI JEWELS, an others as per the filing. Its GSTIN 27AAPFS8232F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEPATI JEWELS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHREEPATI JEWELS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SHREEPATI JEWELS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEPATI JEWELS?
The professionals named in the filing: Architect: LD SHAH; Architect: KALPESH SHAH; Engineer: JAGDISH MR PATIL CONSULTING ENGG PVT LTD; Engineer: SUNIL M SOHANI; Chartered Accountant: S M GUPTA AND CO; Chartered Accountant: HARSHAL CHHADVA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEPATI JEWELS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback