Registered No litigation declared Residential / Group Housing project

SHREEJI MEADOWS

By DEEPLAXMI DEVELOPERS

RG-MH-68537 · RERA P51700031453 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
22 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
153 of 400Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

SHREEJI MEADOWS is a Residential / Group Housing project by DEEPLAXMI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700031453 on 23 Oct 2021. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 247 of the 400 units on this registration are recorded sold or booked, and 22 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREEJI MEADOWS
  • TypeResidential / Group Housing
  • Location
    • BELAVLI
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031453
  • ReraGenie IDRG-MH-68537

Builder

  • NameDEEPLAXMI DEVELOPERS
  • Entity typePartnership
  • PartnersKANTILAL MAVJI PATEL, KIRIT MAVJI PATEL, MOHANLAL HANSRAJ PATEL, MUKESH PUNJA PATEL, MANOHAR KANU MASHKAR, VIKAS RAGHUNATH GUPTE, SHAILESH MANOHAR MHASKAR, VEENA CHANDRASHEKAR MASHKAR, VIKRANT VIKAS GUPTE
  • Other registrations4 more →
  • Completed3 of 5
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

3 months past promisethis monthRegisteredOct 2021PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed56 files

Current status

62%247 of 400 units booked
100.0%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA13131324136
BUILDING 2NA13131320132
BUILDING 3NA13131320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING 182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 374%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,610 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR NAGARPARISHAD
Permissible FSI19897.31
Proposed, not sanctioned19,897 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR
Estimated costRs 52.50 cr
Cost incurredRs 52.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING 1NARs 16.50 crRs 16.50 cr
BUILDING 2NARs 16.00 crRs 16.00 cr
BUILDING 3NARs 16.00 crRs 16.00 cr
-NARs 4.00 crRs 4.00 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectURBAN VASTU DESIGNER
EngineerAADHAR ENGINEERS
Chartered AccountantL K DEDHIA & CO
PartnerRole in project
DEEPLAXMI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 26.pdf6 Jun 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM 3 MAR 26.pdf6 Jun 2026
Withdrawal Update Form 1File: FORM 1 DEC 25.pdf19 Feb 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf19 Feb 2026
Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 1File: FORM 1 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 3File: FORM 3 JUN 25.pdf31 Oct 2025
Form 1File: FORM 1 MAR 25.pdf27 Jun 2025
Form 2File: FORM 2 MAR 25.pdf27 Jun 2025
Form 3File: FORM 3 MAR 25.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 25.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS SEP24.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS DEC24.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS JUN24.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS MAR 24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Medows march24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 24.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 23.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR 2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUN 24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 23.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS MAR23.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEADOWS MAR22.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 22.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 23.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 23.pdf7 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MAR 24.pdf7 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 24 SM.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - MAR22.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - MAR23.pdf16 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SM.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SHREEJI MEADOWS.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: SHREEJI MEADOWS RERA UPDATE FLAT LIST-MARCH 22.pdf28 Apr 2022
Building plan approvalFile: PLAN SHEET 2.pdf12 Oct 2021
Layout approvalFile: PLAN.pdf12 Oct 2021
PAN CardFile: PAN CARD.pdf12 Oct 2021
Copy of the legal title reportFile: FORM A TITLE_compressed.pdf12 Oct 2021
Details of encumbrancesFile: NON ECUMBRANCES CERTIFICATE.pdf12 Oct 2021
Copy of Layout Approval (in case of layout)File: PLAN.pdf12 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHEET 2.pdf12 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: C C COPY.pdf12 Oct 2021
Declaration about Commencement CertificateFile: CC DECLARATION.pdf12 Oct 2021
Declaration in FORM BFile: FORMB.PDF12 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RERA SHREEJI MEADOWS.pdf12 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER_compressed.pdf12 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf12 Oct 2021
Proforma of Allotment letterFile: AGREEMENT.pdf12 Oct 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MANOHAR SHREEJI NIRVANANEAR KATRAP SCHOOL KATRAP BADLAPUR EAST 4215031CompletedApr 2017Mar 2017
VIKAS GALAXYS NO 90 KULGOAN BADLAPUR ROAD KULGOAN BADLAPUR 4215031CompletedDec 2014Nov 2014

How this compares with Thane

62%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJI MEADOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BELAVLI7,600+ in Thane

2 kmSHREEJI MEADOWSCompleted 88Lapsed / revoked 42Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: DEEPLAXMI DEVELOPERS

DEEPLAXMI DEVELOPERS has 5 registrations on MahaRERA, including MANOHAR VIKAS SHREEJI PARAISO PHASE 1 and MANOHAR SHREEJI NIRVANA PHASE 4. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREEJI MEADOWS is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJI MEADOWS?

The registered promoter entity is DEEPLAXMI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJI MEADOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJI MEADOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJI MEADOWS?

The professionals named in the filing: Architect: URBAN VASTU DESIGNER; Engineer: AADHAR ENGINEERS; Chartered Accountant: L K DEDHIA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJI MEADOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJI MEADOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJI MEADOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.