Shreeji Landmark NX
By SHUBH INFRA
RG-MH-23768 · RERA P51700079080 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shreeji Landmark NX is a Residential / Group Housing project by SHUBH INFRA in Thane, Maharashtra, registered with MahaRERA as P51700079080 on 3 Feb 2025. Possession is promised by 31 Dec 2026. 4 of the 140 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.
At a glance
Project
- NameShreeji Landmark NX
- TypeResidential / Group Housing
- Location
- Survey No 136
- Hissa No 1/B and 2/A
- At Village - Shirgaon
- Badlapur
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700079080
- ReraGenie IDRG-MH-23768
Builder
- NameSHUBH INFRA
- Entity typePartnership
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2025
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed51 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 7 | 7 | 59 | 0 | 59 |
| Wing B | NA | 7 | 7 | 79 | 0 | 79 |
| Wing C | NA | 1 | 1 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 45%.
Wing A20%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed187
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Wing A | 79 | 79 |
| Wing B | 105 | 105 |
| Wing C | 3 | 3 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B | NA | Rs 9.16 cr | Rs 5.00 cr |
| Wing A | NA | Rs 7.16 cr | Rs 1.79 cr |
| - | NA | Rs 1.90 cr | - |
| Wing C | NA | Rs 44.47 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Raj Associates |
| Engineer | Atul Kudtarkar and Associates Pvt Ltd |
| Chartered Accountant | Mukesh Gurnani |
| Chartered Accountant | VRP & Associates |
| Chartered Accountant | Chanchlani & Associates |
| Partner | Role in project |
|---|---|
| SHUBH INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Shubh Infra Form 1 Q4.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Shubh Infra Form 2 Q4.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Shubh Infra 31122025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Shubh infra.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Shubh Infra F.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Shubh Infra 31122025.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Shubh infra.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 shubh infra-1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Shubh Infra 31.03.2025.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Downloaded From Site.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Infra Form 1.pdf | 20 Jul 2025 |
| Withdrawal Update Form 2File: Infra form 2.pdf | 20 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - Shubh Infra 31.03.2025.pdf | 20 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shubh Infra Q4.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shubh Infra Q4.pdf | 19 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation.pdf | 30 Jan 2025 |
| Other - LegalFile: Property Card 7 12.pdf | 16 Jan 2025 |
| Other - LegalFile: Shubh Infra Plot Sale_11zon.pdf | 16 Jan 2025 |
| Proforma of Agreement for saleFile: AFS.pdf | 15 Jan 2025 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 6 Jan 2025 |
| Other - LegalFile: Sale Deed No 16932-2023_11zon.pdf | 6 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shubh Infra.pdf | 19 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Form A Bank Declaration.pdf | 17 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bhumika Kalwani.pdf | 17 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Pooja Kavrani.pdf | 17 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rachna Bijlani.pdf | 17 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sunil Nihalani.pdf | 17 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form B Bank Declaration.pdf | 17 Dec 2024 |
| Building plan approvalFile: scan document 10533 - converted.pdf | 12 Dec 2024 |
| Building plan approvalFile: scan document 10532 - converted.pdf | 12 Dec 2024 |
| Layout approvalFile: scan document 10531 - converted (5).pdf | 12 Dec 2024 |
| PAN CardFile: Shubh Infra PAN.pdf | 12 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf | 12 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: scan document 10531 - converted (5).pdf | 12 Dec 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 12 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shubh Infra.pdf | 12 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 12 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: scan document 10532 - converted.pdf | 12 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: scan document 10533 - converted.pdf | 12 Dec 2024 |
| Declaration about Commencement CertificateFile: Form D.pdf | 12 Dec 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 12 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation Allotment.pdf | 12 Dec 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance.pdf | 12 Dec 2024 |
| Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf | 12 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf | 12 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Jayesh Jain.pdf | 12 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Jignesh Shah.pdf | 12 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Shubh Infra - Vipul Shah.pdf | 12 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Loan Disclosure.pdf | 12 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shreeji Landmark NX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near At Village - Shirgaon, Badlapur7,600+ in Thane
Filed coordinates, straight-line distance. 319 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: SHUBH INFRA
SHUBH INFRA has 2 registrations on MahaRERA, including GLOBAL BUSINESS HUB and Shreeji Landmark NX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Shreeji Landmark NX is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shreeji Landmark NX?
The registered promoter entity is SHUBH INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shreeji Landmark NX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shreeji Landmark NX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shreeji Landmark NX?
The professionals named in the filing: Architect: Raj Associates; Engineer: Atul Kudtarkar and Associates Pvt Ltd; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates; Chartered Accountant: Chanchlani & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shreeji Landmark NX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.