SHREEJI DESTINY
By SHREEJI VENTURES REALTY PRIVATE LIMITED
RG-MH-04180 · RERA P51700021305 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEJI DESTINY is a Commercial project by SHREEJI VENTURES REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700021305 on 21 Jun 2019. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 15 months from the original filing. 201 of the 288 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREEJI DESTINY
- TypeCommercial
- Location
- THANE BELAPUR ROAD
- NERUL NAVI MUMBAI
- Navi Mumbai (M Corp.)
- Thane
- 400706
- Pincode400706
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700021305
- ReraGenie IDRG-MH-04180
Builder
- NameSHREEJI VENTURES REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU72100MH2014PTC260261
- GSTIN27AAFCT1967K1ZV
- DirectorDEVJI VAGHJI PATEL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Jun 2019
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed74 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHEEJI DESTINY | NA | 30 | 19 | 0 | 288 | 288 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.
SHEEJI DESTINY: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHEEJI DESTINY | NA | Rs 225.00 cr | Rs 175.00 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACUBE ARCHITECT |
| Engineer | SK Consultants & Engineers |
| Engineer | Jagrutkumar Devjibhai Vavia |
| Chartered Accountant | M G Barvadiya & Associates |
| Chartered Accountant | D.G. Patel & Associates |
| Partner | Role in project |
|---|---|
| SHREEJI VENTURES REALTY PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe sincerely apologize for the delay in the completion of the project and the subsequent submission of this request. The delay was caused by unforeseen circumstances, including procurement challenges, financial constraints, and on-site execution issues. Despite these setbacks, we have worked diligently to resolve all concerns, and we are pleased to inform you that the construction work of the project has been 100% completed. We are presently in the process of obtaining the Occupancy Certificate (OC) from the competent authority. In order to complete the remaining statutory formalities and to e
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 May 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: 11_14 Plans.pdf | 27 May 2026 |
| Commencement certificateFile: Plan Approval.pdf | 27 May 2026 |
| Building plan approvalFile: Provisional Fire Safety approval.pdf | 27 May 2026 |
| Building plan approvalFile: 1_5 Plans.pdf | 26 May 2026 |
| Building plan approvalFile: 6_10 Plans.pdf | 26 May 2026 |
| Withdrawal Update Form 1File: Form 1 Shreeji Destiny March 26.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: Form 2 Shreeji Ventures Realty Pvt Ltd March 26.pdf | 26 May 2026 |
| Withdrawal Update Form 3File: FORM 3 as on 31Mar26 Realty.pdf | 26 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Shreeji Ventures Realty Pvt Ltd.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 as on 31Dec25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: ARCHITECTS CERTIFICATe.pdf | 16 Dec 2025 |
| Withdrawal Update Form 1File: ARCHITECTS CERTIFICATe.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Structural - converted.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Structural - converted.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 16 Dec 2025 |
| Form 1File: Form 1 September 2025.pdf | 1 Nov 2025 |
| Form 2File: Form 2 September 2025.pdf | 1 Nov 2025 |
| Form 3File: Form 3 September 2025.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 September 2025.pdf | 1 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-2025.pdf | 1 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 28 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Destiny .pdf | 28 Jul 2025 |
| Certificates of CA (Form 3)File: FORM 3 300625 Realty Pvt Ltd.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07-SHREEJI DESTINY-ARCHITECT CERTIFICATE- WORK STATUS TILL 21-04-25.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 May 2025 |
| Certificates of CA (Form 3)File: FORM 3 310325 Realty Pvt Ltd.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREEJI DESTINY ARCHITECTS CERTIFICATE 20-01-2025.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Destiny Dec 24.pdf | 22 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 311224 Realty Pvt Ltd.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Destiny.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Destiny.pdf | 2 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 300924 Realty Pvt Ltd.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREEJI DESTINY-ARCHITETS CERTIFICATE 26-08-2024.pdf | 23 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 as on 30Jun24.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of shreeji ventures realty.pdf | 23 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-FY 23-24-Techno.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATe.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Structural - converted.pdf | 18 May 2024 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATe.pdf | 30 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Approval D_227.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-FY 22-23-Techno.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-FY 21-22-Techno.pdf | 31 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter-bank.pdf | 29 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter-bank.pdf | 29 Mar 2023 |
| PAN CardFile: PAN - Techno Pack Sotware.pdf | 4 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: TECHNO PACK 19-20.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: TECHNO PACK 20-21.pdf | 24 Jun 2021 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 14 Jun 2019 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 14 Jun 2019 |
| Proforma of Allotment letterFile: RERA Agreement IT PARK - LESSEE.pdf | 14 Jun 2019 |
| Building plan approvalFile: D-227-Sanction Plan 1_1.pdf | 10 Jun 2019 |
| Building plan approvalFile: D-227-Sanction Plan 1_2.pdf | 10 Jun 2019 |
| Building plan approvalFile: D-227-Sanction Plan 1_3.pdf | 10 Jun 2019 |
| Building plan approvalFile: D-227-Sanction Plan 1_4.pdf | 10 Jun 2019 |
| Layout approvalFile: D-227-Sanction Plan 1_1.pdf | 10 Jun 2019 |
| Layout approvalFile: D-227-Sanction Plan 1_2.pdf | 10 Jun 2019 |
| Layout approvalFile: D-227-Sanction Plan 1_3.pdf | 10 Jun 2019 |
| Layout approvalFile: D-227-Sanction Plan 1_4.pdf | 10 Jun 2019 |
| Copy of the legal title reportFile: Title Report.pdf | 10 Jun 2019 |
| Details of encumbrancesFile: Encumbrance.pdf | 10 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: D-227-Sanction Plan 1_1.pdf | 10 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: D-227-Sanction Plan 1_2.pdf | 10 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: D-227-Sanction Plan 1_3.pdf | 10 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: D-227-Sanction Plan 1_4.pdf | 10 Jun 2019 |
| Building Plan Approval (IOD)File: D-227-Sanction Plan 1_1.pdf | 10 Jun 2019 |
| Building Plan Approval (IOD)File: D-227-Sanction Plan 1_2.pdf | 10 Jun 2019 |
| Building Plan Approval (IOD)File: D-227-Sanction Plan 1_3.pdf | 10 Jun 2019 |
| Building Plan Approval (IOD)File: D-227-Sanction Plan 1_4.pdf | 10 Jun 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 10 Jun 2019 |
| Declaration in FORM BFile: Form B.pdf | 10 Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREEJI DESTINY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NERUL NAVI MUMBAI7,600+ in Thane
Filed coordinates, straight-line distance. 64 registered projects within 2 km.
NMS Gami Palm Amore
VISION INFRA LLP
DELTA PALMBEACH
BALAJI CORPORATION
Cyber Square - 1
GREENSCAPE IT PARK LLP
Shreeji Destiny NX
Kasturi Hotels Private Limited
24 HIGH
DREAM APEX REALTIES LIMITED
DELTA STELLAR
NOBLE ORGANICS PVT. LTD.
See every Thane project, with the district possession charts
Builder: SHREEJI VENTURES REALTY PRIVATE LIMITED
SHREEJI VENTURES REALTY PRIVATE LIMITED has 1 registration on MahaRERA, including SHREEJI DESTINY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SHREEJI DESTINY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREEJI DESTINY is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEJI DESTINY?
The registered promoter entity is SHREEJI VENTURES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U72100MH2014PTC260261 and GSTIN 27AAFCT1967K1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEJI DESTINY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEJI DESTINY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEJI DESTINY?
The professionals named in the filing: Architect: ACUBE ARCHITECT; Engineer: SK Consultants & Engineers; Engineer: Jagrutkumar Devjibhai Vavia; Chartered Accountant: M G Barvadiya & Associates; Chartered Accountant: D.G. Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEJI DESTINY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback