Home / Browse projects / Aurangabad, Maharashtra / SHREEHARI VIJAY RESIDENCY
SHREEHARI VIJAY RESIDENCY
RG-MH-34799 · RERA P51500032113 · Last updated on MahaRERA portal: 25 Feb 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEHARI VIJAY RESIDENCY is a Residential / Group Housing project by Hari Chandra Construction in Aurangabad, Maharashtra, registered with MahaRERA as P51500032113 on 14 Dec 2021. The registration is recorded completed; possession was promised by 31 Oct 2026.
At a glance
Project
- NameSHREEHARI VIJAY RESIDENCY
- TypeResidential / Group Housing
- Location
- PLOT NO 1 AND 2 GUT NO 175 PART
- TISGAON
- Aurangabad
- 431102
- Pincode431102
- RERA no.P51500032113
- ReraGenie IDRG-MH-34799
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Dec 2021
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings4 building records
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 2 | 0 | 0 | 0 | 0 |
| B | NA | 2 | 0 | 0 | 0 | 0 |
| C | NA | 2 | 0 | 0 | 0 | 0 |
| D | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JB ASSOCIATES |
| Engineer | ABHIRANJAN CONSULTANT |
| Chartered Accountant | YASH NAGAR |
| Partner | Role in project |
|---|---|
| Hari Chandra Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Jan 2025
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1 (2).pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1 (2).pdf | 25 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 28 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q2.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q2.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 24-25 Q2.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 23-24 Q4.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 23-24 Q4.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 23-24 Q4.pdf | 18 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 15 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 15 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 27 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 27 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Hari Chandra Construction.pdf | 20 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 15 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 15 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - all partners.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 30-06-2023.pdf | 28 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert 30-06-2023.pdf | 28 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30-06-2023.pdf | 28 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2023.pdf | 28 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2023.pdf | 6 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2023.pdf | 6 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-03-2023_page-0001.pdf | 6 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2023.pdf | 6 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 31 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 3 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31122022.pdf | 3 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 3112022.pdf | 3 Feb 2023 |
| Building plan approvalFile: IMG_2901.pdf | 14 Sep 2022 |
| Building plan approvalFile: IMG_2902.pdf | 14 Sep 2022 |
| Building plan approvalFile: IMG_2903.pdf | 14 Sep 2022 |
| Building plan approvalFile: IMG_2904.pdf | 14 Sep 2022 |
| Details of encumbrances concerned to LegalFile: Encumbarences to legal.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_2901.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_2902.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_2903.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_2904.pdf | 14 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Acc declaration.pdf | 14 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation with respect to allotment.pdf | 14 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation with respect to Model copy of agreement.pdf | 14 Sep 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200225538237_For_Asset_Based_Search_08_12_2021_16_57_23_767.pdf | 8 Dec 2021 |
| Proforma of Allotment letterFile: RERA_Agreement_for_Sale_Format.pdf | 29 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 21 Nov 2021 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf | 17 Nov 2021 |
| Proforma of Allotment letterFile: proforma_allotment_letter.pdf | 17 Nov 2021 |
| Layout approvalFile: LAYOUT_compressed.pdf | 16 Nov 2021 |
| Building plan approvalFile: scan0271_compressed.pdf | 16 Nov 2021 |
| Building plan approvalFile: scan0272_compressed.pdf | 16 Nov 2021 |
| Building plan approvalFile: scan0273_compressed.pdf | 16 Nov 2021 |
| Building plan approvalFile: scan0274_compressed.pdf | 16 Nov 2021 |
| PAN CardFile: 1 PAN Card.pdf | 16 Nov 2021 |
| Details of encumbrancesFile: Encumbrance.pdf | 16 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf | 16 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0271_compressed.pdf | 16 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0272_compressed.pdf | 16 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0273_compressed.pdf | 16 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0274_compressed.pdf | 16 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED COMM CERTI_compressed.pdf | 16 Nov 2021 |
| Declaration about Commencement CertificateFile: decleration of commencement.pdf | 16 Nov 2021 |
| Declaration in FORM BFile: form B.pdf | 16 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf | 16 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf | 16 Nov 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Harichandra Residancy | Plot No 1516 Gut NO 140 Cidco Mahanagar 1 Aurangabad | 1 | Completed | Jun 2015 | Late, May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
Keep SHREEHARI VIJAY RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TISGAON1,400+ in Aurangabad
PMAY U Tisgaon 227 B
Unity Developers
PMAY U Tisgaon 225 B
Sahakar JV
PMAY U Tisgaon 227 C
Unity Developers
PMAY U Tisgaon 225 A
Sahakar JV
PMAY U Tisgaon 227 A
Unity Developers
Trillium Tower
Ramesh Sohanlal Sarda
See every Aurangabad project, with the district possession charts
Builder: Hari Chandra Construction
Hari Chandra Construction has 4 registrations on MahaRERA, including Shree Hari Park and Shree Hari complex. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if SHREEHARI VIJAY RESIDENCY is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEHARI VIJAY RESIDENCY?
The registered promoter entity is Hari Chandra Construction, a partnership as per the filing. Its GSTIN 27AAGFH8685N1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEHARI VIJAY RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEHARI VIJAY RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEHARI VIJAY RESIDENCY?
The professionals named in the filing: Architect: JB ASSOCIATES; Engineer: ABHIRANJAN CONSULTANT; Chartered Accountant: YASH NAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEHARI VIJAY RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback