Home / Browse projects / Thane, Maharashtra / SHREE VATIKA

Registered No litigation declared Residential / Group Housing project

SHREE VATIKA

By Shree Raj Enterprises

RG-MH-17870 · RERA P51700077229 · Last updated on MahaRERA portal: 16 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 22%
58 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

SHREE VATIKA is a Residential / Group Housing project by Shree Raj Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700077229 on 31 Jul 2024. Possession is promised by 31 Dec 2026. 0 of the 58 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE VATIKA
  • TypeResidential / Group Housing
  • Location
    • KAPTRAP
    • SHIRGOAN
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700077229
  • ReraGenie IDRG-MH-17870

Builder

  • NameShree Raj Enterprises
  • Entity typePartnership
  • PartnersNIRMALA RAVINDRA KARALE, RAMJAN AMIR TADAVI, ANJUM RAMJAN TADAVI

Key dates

this monthRegisteredJul 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed50 files

Current status

0%0 of 58 units booked

Figures as on 16 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE VATIKANA9858058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 22%.

SHREE VATIKA: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure22%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered1
Open Space55

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,335 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
Raju TadaviGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
LUKMAN TADAVIBadlapur (M Cl)Thane
RASHIDABAI TADAVIBadlapur (M Cl)Thane
HASINA TADAVIKhirdiJalgaon
HURMATBAI TADAVIBadlapur (M Cl)Thane
SAYARA TADAVIGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
RAMJAN TADAVIBadlapur (M Cl)Thane
SAEEDA TADAVIBadlapur (M Cl)Thane
RABIYA TADAVIBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Municipal Council
Permissible FSI2847.89
Proposed, not sanctioned2,848 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1 VED BUILDING KULGOAN BADLAPUR EAST 421503

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYASHWANT G SATHE
EngineerASCON ENGINEERS
Chartered AccountantS D Satam & Co
Chartered AccountantASHWINI K PRABHU & ASSOCOATES
PartnerRole in project
Shree Raj Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Letter 30% Shree Vatika by Shree RAj Enterprises) (1).pdf16 Aug 2025
Form 2File: Ref_77_136_717_ R-4_2025_TADVI REF RIJVAN NF_(20-01-2025) 2 (3).pdf16 Aug 2025
Form 3File: Shree raj form 3 Q4.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: 13-08-25, 921 PM Microsoft Lens.pdf16 Aug 2025
Form 1File: Architect Letter 20% Shree Vatika ( Shree RAj Enterprises).pdf16 Aug 2025
Form 2File: Engineer Certificate Q3.pdf16 Aug 2025
Form 3File: ca Form 3 q3.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: 13-08-25, 921 PM Microsoft Lens.pdf16 Aug 2025
Form 1File: Architect Letter 20% Shree Vatika ( Shree RAj Enterprises).pdf16 Aug 2025
Form 2File: Engineer Certificate Q2.pdf16 Aug 2025
Form 3File: ca Form 3 Q2.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: 13-08-25, 921 PM Microsoft Lens.pdf16 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter 20.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter 22.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca Form 3 Q2.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca Form 3 q3.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q2.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q3.pdf3 Mar 2025
CERSAI detailsFile: 28-07-24, 951 PM Microsoft Lens.pdf29 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: cc relalidated.pdf22 Jul 2024
Declaration about Commencement CertificateFile: dECLARATION ABOUT cc.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Corrected (1).pdf8 Jul 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBERANCE FINANCE.pdf7 Jul 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBERANCE LEAGAL.pdf7 Jul 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBERANCE FINANCE.pdf7 Jul 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBERANCE LEAGAL.pdf7 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf7 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf7 Jul 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Inventory.pdf7 Jul 2024
Copy of the legal title reportFile: Titake Certificate New Feb 24.pdf24 Mar 2024
Other - TechnicalFile: Declaration cum undertaking.pdf24 Mar 2024
Other - LegalFile: AGREEMENT FOR SALE.pdf4 Mar 2024
Other - FinanceFile: Declaration cum undertaking (1).pdf4 Mar 2024
Layout approvalFile: BLUE PRINT - KEY PALN 1 (1).pdf2 Mar 2024
Building plan approvalFile: BLUE PRINT - KEY PALN 2.pdf2 Mar 2024
PAN CardFile: SHREE RAJ ENT PANCARD.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: non encumbrances finance.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: non encumburence legal.pdf2 Mar 2024
Details of encumbrances concerned to LegalFile: non encumbrances finance.pdf2 Mar 2024
Details of encumbrances concerned to LegalFile: non encumburence legal.pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: BLUE PRINT - KEY PALN 1 (1).pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT - KEY PALN 2.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Mar 2024
Declaration in FORM BFile: FORM B COMPANY.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: interest in other organisations.pdf2 Mar 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE .pdf2 Mar 2024
Proforma of Allotment letterFile: proforma of allotment letter.pdf2 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account details.pdf2 Mar 2024
Deviation Report with respect to Allotment letterFile: deviation for allotment.pdf2 Mar 2024
Deviation Report with respect to model copy of AgreementFile: deviation for agreement of sale.pdf2 Mar 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE VATIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRGOAN7,600+ in Thane

Builder: Shree Raj Enterprises

Shree Raj Enterprises has 1 registration on MahaRERA, including SHREE VATIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE VATIKA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE VATIKA?

The registered promoter entity is Shree Raj Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE VATIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE VATIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE VATIKA?

The professionals named in the filing: Architect: YASHWANT G SATHE; Engineer: ASCON ENGINEERS; Chartered Accountant: S D Satam & Co; Chartered Accountant: ASHWINI K PRABHU & ASSOCOATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE VATIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE VATIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE VATIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.