Home / Browse projects / Nashik, Maharashtra / SHREE VAIBHAV CLASSIC
SHREE VAIBHAV CLASSIC
By DSJ GROUP
RG-MH-65326 · RERA P51600049625 · Last updated on MahaRERA portal: 23 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 11 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE VAIBHAV CLASSIC is a Residential / Group Housing project by DSJ GROUP in Nashik, Maharashtra, registered with MahaRERA as P51600049625 on 22 Feb 2023. Possession was promised by 15 Nov 2025 and is now 11 months past that date. 13 of the 18 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE VAIBHAV CLASSIC
- TypeResidential / Group Housing
- Location
- POLICE COLONY CHETNA NAGAR
- RANE NAGAR
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600049625
- ReraGenie IDRG-MH-65326
Builder
- NameDSJ GROUP
- Entity typePartnership
- GSTIN27AATFD5065F1Z5
- PartnersASHWINI SHRIDHAR DASHPUTE, TANMAY SATISH JOSHI, HARSHAD DATTATRAY SONJE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Feb 2023
- Promised completion15 Nov 2025
- Revised completionNone
- Buildings1 building record
- Documents filed66 files
Current status
Figures as on 23 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE VAIBHAV CLASSIC | NA | 6 | 6 | 18 | 0 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHREE VAIBHAV CLASSIC: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE VAIBHAV CLASSIC | NA | Rs 3.50 cr | Rs 3.65 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KSHITIJ DHANDE |
| Engineer | UJVAL RAVINDRA CHAUDHARI |
| Chartered Accountant | SANDEEP PAHADE |
| Partner | Role in project |
|---|---|
| DSJ GROUP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: DSJ Rera certificate 3-9-23.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (4).pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 15 nov 2025.pdf | 23 Mar 2026 |
| Form 1File: Form 1 31-03-25.pdf | 17 Jan 2026 |
| Form 2File: NEW FORM-2 ENGINEER CERTIFICATE- DSJ GRP Mar-25.pdf | 17 Jan 2026 |
| Form 3File: form no 3 March 25.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Book Inventory March 2025.pdf | 17 Jan 2026 |
| Form 1File: Form 1 30-06-25.pdf | 17 Jan 2026 |
| Form 2File: NEW FORM-2 ENGINEER CERTIFICATE- DSJ GRP June-25.pdf | 17 Jan 2026 |
| Form 3File: Form No 3 June 25.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Book Inventory June 2025.pdf | 17 Jan 2026 |
| Form 1File: From 1 30-09-25.pdf | 17 Jan 2026 |
| Form 2File: NEW FORM-2 ENGINEER CERTIFICATE- DSJ GRP Sept-25.pdf | 17 Jan 2026 |
| Form 3File: Form No 3 Sept 25.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Book Inventory Sep 2025.pdf | 17 Jan 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Sept 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Dec 2023.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 Tanmay 30 sep23.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 Tanmay 31Dec 23.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 Tanmay 31Mar 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 FORM 1 Tanmay 30 Jun 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 FORM 1 Tanmay 30-9-24 sep.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 FORM 1 Tanmay 31-12-24.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 Upto Mar 2024.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 Upto June 2024.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 Upto Sept 2024.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 Upto Dec 2024.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 upto Sept 2023.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Upto Dec 2023.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DSJ Rera certificate 3-6-23.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DSJ Rera certificate 3-9-23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM-2 ENGINEER CERTIFICATE- DSJ GRP March-23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM-2 ENGINEER CERTIFICATE- DSJ GRP June-23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023.pdf | 19 Oct 2023 |
| Building plan approvalFile: NA Order-COMP.pdf | 14 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order-COMP.pdf | 14 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account 020223.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf | 31 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: EC FINANCE 141222.pdf | 21 Dec 2022 |
| Details of encumbrances concerned to LegalFile: EC FINANCE 141222.pdf | 21 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_141222.pdf | 21 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 141222.pdf | 21 Dec 2022 |
| Layout approvalFile: layout.pdf | 7 Dec 2022 |
| Building plan approvalFile: BUILDING PLAN SCAN.pdf | 7 Dec 2022 |
| PAN CardFile: PAN FIRM.pdf | 7 Dec 2022 |
| Copy of the legal title reportFile: TITLE SEARCH REPORT-COMP.pdf | 7 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: EC-LEGAL.pdf | 7 Dec 2022 |
| Details of encumbrances concerned to LegalFile: EC-LEGAL.pdf | 7 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 7 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN SCAN.pdf | 7 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 7 Dec 2022 |
| Declaration about Commencement CertificateFile: DECLARATION FOR COMMENCEMENT.pdf | 7 Dec 2022 |
| Declaration in FORM BFile: FORM B.pdf | 7 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 7 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 7 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-comp.pdf | 7 Dec 2022 |
| Proforma of Allotment letterFile: PROFORMA FOR ALLOTEMENT LETTER-comp.pdf | 7 Dec 2022 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT TO SALE-comp.pdf | 7 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION FOR SEPERATE BANK ACC.pdf | 7 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION- PROFORMA FOR ALLOTEMENT TO SALE.pdf | 7 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION- ATS.pdf | 7 Dec 2022 |
| Other - LegalFile: PARTNERSHIP DEED-comp.pdf | 7 Dec 2022 |
| Other - LegalFile: TDR-comp.pdf | 7 Dec 2022 |
| Other - LegalFile: PURCHASE DEED-comp.pdf | 7 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE VAIBHAV CLASSIC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RANE NAGAR4,100+ in Nashik
Filed coordinates, straight-line distance. 194 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: DSJ GROUP
DSJ GROUP has 1 registration on MahaRERA, including SHREE VAIBHAV CLASSIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that SHREE VAIBHAV CLASSIC shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREE VAIBHAV CLASSIC is delayed beyond 15 Nov 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE VAIBHAV CLASSIC?
The registered promoter entity is DSJ GROUP, a partnership as per the filing. Its GSTIN 27AATFD5065F1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE VAIBHAV CLASSIC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE VAIBHAV CLASSIC?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE VAIBHAV CLASSIC?
The professionals named in the filing: Architect: KSHITIJ DHANDE; Engineer: UJVAL RAVINDRA CHAUDHARI; Chartered Accountant: SANDEEP PAHADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE VAIBHAV CLASSIC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback