Home / Browse projects / Nashik, Maharashtra / SHREE TIRUMALA MAGNIZENT APARTMENT
SHREE TIRUMALA MAGNIZENT APARTMENT
RG-MH-89628 · RERA P51600048872 · Last updated on MahaRERA portal: 24 Mar 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 9 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE TIRUMALA MAGNIZENT APARTMENT is a Commercial project by ROONGTA HOMES LLP in Nashik, Maharashtra, registered with MahaRERA as P51600048872 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 27 months from the original filing. 2 of the 54 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE TIRUMALA MAGNIZENT APARTMENT
- TypeCommercial
- Location
- NASHIK SHIWAR
- NASHIK SHIWAR NASHIK
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048872
- ReraGenie IDRG-MH-89628
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Jan 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2024)
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 24 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE TIRUMALA MAGNIZENT APARTMENT | NA | 8 | 7 | 0 | 54 | 54 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHREE TIRUMALA MAGNIZENT APARTMENT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| JIGNESH RATILAL KARIA | Nashik | Nashik |
| MRS. NAMITA JIGNESH KARIA | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE TIRUMALA MAGNIZENT APARTMENT | NA | Rs 62.50 lakh | Rs 55.10 lakh |
| - | NA | Rs 35.00 lakh | Rs 15.00 lakh |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pankaj Jadav |
| Architect | PANKAJ JADHAV |
| Engineer | AMOL YADAVRAO BHALERAO |
| Engineer | MR SANJEEV MADHUSUDAN PATEL |
| Engineer | SANJEEV PATEL |
| Engineer | AMOL BHALERAO |
| Chartered Accountant | Pranav S Lahoti & Co Chartered Accountants |
| Chartered Accountant | M/s. Pravin R.Rathi & Associates, Chartered Accountants |
| Chartered Accountant | PRANAV SUSHIL LAHOTI |
| Chartered Accountant | PRAVIN R RATHI & ASSOCIATES FRN 131494W |
| Partner | Role in project |
|---|---|
| ROONGTA HOMES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe propose to extend the completion date to 31.12.2026. We have already obtained part completion for the project on 27.09.2023, the same is attached herewith for your reference. However we need some more time to fully complete the project. This extension will allow us to ensure that the project meets the required standards of quality and safety. Please note that no consent of allottees is needed as all the units of the project are unsold as on date. We appreciate your understanding and support in this matter.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: NMC MAIL.pdf | 24 Mar 2026 |
| Occupational CertificateFile: MAGNIZENT FULL COMPLETION.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: Form 4-Magnizent.pdf | 9 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 MAGNIZENT Q2 01102025.pdf | 9 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 Q2 MAGNIZENT.pdf | 9 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 MAGNIZENT.pdf | 22 Nov 2025 |
| Occupational CertificateFile: MAGNIZENT FULL COMPLETION.pdf | 18 Aug 2025 |
| Occupational CertificateFile: NMC MAIL.pdf | 18 Aug 2025 |
| Form 3File: Magnizent form 3 q4.pdf | 26 May 2025 |
| Form 3File: FORM 3-MAGNIZENT-01012025.pdf | 26 May 2025 |
| Form 3File: FORM 3-MAGNIZENT Q2.pdf | 26 May 2025 |
| Form 3File: Form 3_Magnizant_Q1 24-25.pdf | 26 May 2025 |
| Form 3File: FORM 3 MAGNIZENT Q4.pdf | 26 May 2025 |
| Form 3File: Form 3_Magnizent Q3.pdf | 26 May 2025 |
| Form 3File: MAGNIZENT Q2.pdf | 26 May 2025 |
| Form 3File: MAGNIZENT Q1.pdf | 26 May 2025 |
| Form 3File: FORM 3 Q4.pdf | 26 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-MAGNIZENT-01042025.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-MAGNIZENT-FY24-25.pdf | 24 Apr 2025 |
| Other - TechnicalFile: MAGNIZENT-FORM2A-24-25.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_MAGNIZENT_01012025.pdf | 4 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-MAGNIZENT-01012025.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-MAGNIZENT-QTR3 24-25.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold-Magnizent-Q3.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer Certificate_Magnizant_Q1.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2-Magnizent_Q2.pdf | 3 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-MAGNIZENT Q2.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MAGNIZANT-Q2.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MAGNIZANT-Q2.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Magnizant_FY 23-24.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Magnizant_Q1 24-25.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Magnizant_Form 1_Q1(24-25).pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: MAGNIZANT_SOLD UNSOLD INVENTORY_Q1.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 MAGNIZENT FORM 2 Q4.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A - MAR-24.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAGNIZENT Q4.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAGNIZANT_FORM-1_Q4.pdf | 29 Apr 2024 |
| CERSAI detailsFile: CERSAI_MAGNIZENT.pdf | 27 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MAGNIZENT.pdf | 22 Apr 2024 |
| Other - TechnicalFile: Form - 2A - MAR-24.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: MAGNIZENT 310324.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Magnizant_Form-2 Q3.pdf | 3 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Magnizant Q3 01012024.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Magnizent.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAGNIZENT FORM 2 Q1.pdf | 13 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAGNIZENT FORM 2 Q2.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAGNIZENT Q2 01102023.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAGNIZENT Q1 01072023.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: MAGNIZENT Q3.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAGNIZENT Q1.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAGNIZENT Q2.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 30 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: MAGNIZENT.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: MAGNIZENT 30062023.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4.pdf | 23 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230516014116.pdf | 17 May 2023 |
| CERSAI detailsFile: CERSAI_MAGNIZENT.pdf | 26 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: MAGNIZENT SOLD 31032023.pdf | 21 Apr 2023 |
| Other - TechnicalFile: MAGNIZENT.pdf | 21 Apr 2023 |
| Declaration about Commencement CertificateFile: FORMAT D REVISED.pdf | 15 Feb 2023 |
| Other - LegalFile: LETTER.pdf | 15 Feb 2023 |
| Other - LegalFile: 7 12 magnizent new.pdf | 15 Feb 2023 |
| Other - LegalFile: 7 12 magnizent old.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 5_merged.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST IN OTHER ENTITIES.pdf | 14 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: DECLARTION MODEL COPY OF AGREEMENT.pdf | 3 Dec 2022 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT FINAL.pdf | 23 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200250121236_For_Asset_Based_Search_19_10_2022_11_01_35_855.pdf | 19 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200250122526_For_Debtor_Based_Search_19_10_2022_11_09_47_474.pdf | 19 Oct 2022 |
| Layout approvalFile: LAY OUT PLAN.pdf | 18 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: LAY OUT PLAN.pdf | 18 Oct 2022 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 4 Oct 2022 |
| Building plan approvalFile: BUILDING PLAN.pdf | 21 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION NON ENCUMBRANCE FINANCE.pdf | 21 Sep 2022 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION NON ENCUMBRANCE LEGAL.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 21 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 28012021.pdf | 21 Sep 2022 |
| Declaration about Commencement CertificateFile: FORM - D.pdf | 21 Sep 2022 |
| Declaration in FORM BFile: FORM -B.pdf | 21 Sep 2022 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE TIRUMALA GULMOHAR APARTMENT | Division Makhmalabad Shiwar NASHIK Taluka NASHIK Dist NASHIK | 156 | Completed | Apr 2022 | Aug 2020 |
| SHREE TIRUMALA PARAMOUNT APARTMENT | Taluka NASHIK Dist NASHIK-422009 | 173 | Completed | Jun 2021 | Feb 2020 |
| SHREE TIRUMALA REGENCY APARTMENT | Deepali Nagar NASHIK Taluka NASHIK Dist NASHIK 422009 | 50 | Completed | Dec 2020 | May 2020 |
| ROONGTA IMPERIA APARTMENT | NASHIK 422001 | 112 | Completed | Jul 2020 | Mar 2019 |
| ROONGTA HORIZON APARTMENT | NASHIK 422001 | 112 | Completed | Jul 2020 | Mar 2019 |
| SHREE TIRUMALA PLATINUM APARTMENT | COLLEGE ROAD NASHIK 422005 | 10 | Completed | May 2020 | Dec 2018 |
| SHREE TIRUMALA PARADISE APARTMENT | CHETANA NAGAR NASHIK 422009 | 28 | Completed | Sep 2019 | Nov 2018 |
| SHREE TIRUMALA HARINIWAS APARTMENT | SR.NO.78 PLOT NO.83 SATPUR NASHIK | 42 | Completed | Mar 2019 | May 2018 |
| SHREE TIRUMALA SWASTIK APARTMENT | INDIRA NAGAR NASHIK | 28 | Completed | Dec 2018 | Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
Keep SHREE TIRUMALA MAGNIZENT APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK SHIWAR NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 286 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: ROONGTA HOMES LLP
ROONGTA HOMES LLP has 26 registrations on MahaRERA, including SHREE TIRUMALA SWASTIK APARTMENT and SHREE TIRUMALA PARADISE APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE TIRUMALA MAGNIZENT APARTMENT is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE TIRUMALA MAGNIZENT APARTMENT?
The registered promoter entity is ROONGTA HOMES LLP, a partnership as per the filing. Its GSTIN 27AAUFR4502Q2ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE TIRUMALA MAGNIZENT APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE TIRUMALA MAGNIZENT APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE TIRUMALA MAGNIZENT APARTMENT?
The professionals named in the filing: Architect: Pankaj Jadav; Architect: PANKAJ JADHAV; Engineer: AMOL YADAVRAO BHALERAO; Engineer: MR SANJEEV MADHUSUDAN PATEL; Engineer: SANJEEV PATEL; Engineer: AMOL BHALERAO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE TIRUMALA MAGNIZENT APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback