ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHREE SIDDHIVINAYAK PARK B TYPE BUILDING

Registered No litigation declared Residential / Group Housing project

SHREE SIDDHIVINAYAK PARK B TYPE BUILDING

By SATYASHIV BUILDERS AND DEVELOPERS NX

RG-MH-18131 · RERA P51700076614 · Last updated on MahaRERA portal: 10 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
61 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SHREE SIDDHIVINAYAK PARK B TYPE BUILDING is a Residential / Group Housing project by SATYASHIV BUILDERS AND DEVELOPERS NX in Thane, Maharashtra, registered with MahaRERA as P51700076614 on 18 Jun 2024. Possession is promised by 31 Dec 2028. 0 of the 61 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE SIDDHIVINAYAK PARK B TYPE BUILDING
  • TypeResidential / Group Housing
  • Location
    • VANGANI
    • Vangani (CT)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700076614
  • ReraGenie IDRG-MH-18131

Builder

  • NameSATYASHIV BUILDERS AND DEVELOPERS NX
  • Entity typePartnership
  • PartnersUMESH ASHOK JADHAV, DARSHANA UMESH JADHAV, JANHAVI UMESH JADHAV, YOGITA MUKESH JADHAV, SATYAM MUKESH JADHAV, SHIVAM MUKESH JADHAV, YADNIKA MUKESH JADHAV, SWATI HEMANT SANGLE, SACHIN ARUN SANGLE, YOGESH MADHAV KATKADE, RUPALI YOGESH KATKADE, SANDIP MADHAV KATKADE and 2 more
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Current status

0%0 of 61 units booked
16.4%Work done, per cost certificate

Figures as on 10 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SIDDHIVINAYAK PARK B TYPE BUILDINGNA80491261

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

SHREE SIDDHIVINAYAK PARK B TYPE BUILDING: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,248 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 May 2025
LandownerVillageDistrict
ROHAN RAMESH SHELARVangani (CT)Thane
RAHUL RAMESH SHELARVangani (CT)Thane
RASHMI RAMESH SHELARVangani (CT)Thane
KAMINEE MANOJ PATILThane (M Corp.)Thane
KAVITA SANDEEP PAWARVangani (CT)Thane

Approvals and building plan

Sanctioning authoritynagar rachna thane
Permissible FSI3248.01
Proposed, not sanctioned3,248 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUSHA SANKUL, OAK BAUG, VALI PEER ROAD, KALYAN WEST - 421301
Estimated costRs 6.25 cr
Cost incurredRs 1.02 cr
Work done16.39%
BuildingWingEstimatedIncurred
SHREE SIDDHIVINAYAK PARK B TYPE BUILDINGNARs 5.63 crRs 1.02 cr
-NARs 62.54 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADAN V SOKANDE AND ASSOCIATES
EngineerTREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS
Chartered AccountantDINESH J POKAR AND CO
PartnerRole in project
SATYASHIV BUILDERS AND DEVELOPERS NX-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: SSD-NX B Form 1 RERA Q1 2024-25.pdf10 Feb 2026
Form 2File: SSD-NX B Form 2 RERA Q1 2024-25.pdf10 Feb 2026
Form 3File: SSD-NX B Form 3 RERA Q1 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: SSD-NX B SOLD-BOOKED INVENTORY Q1 2024-25.pdf10 Feb 2026
Form 1File: SSD-NX B Form 1 RERA Q2 2024-25.pdf10 Feb 2026
Form 2File: SSD-NX B Form 2 RERA Q2 2024-25.pdf10 Feb 2026
Form 3File: SSD-NX B Form 3 RERA Q2 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: SSD-NX B SOLD-BOOKED INVENTORY Q2 2024-25.pdf10 Feb 2026
Form 1File: SSD-NX B Form 1 RERA Q3 2024-25.pdf10 Feb 2026
Form 2File: SSD-NX B Form 2 RERA Q3 2024-25.pdf10 Feb 2026
Form 3File: SSD-NX B Form 3 RERA Q3 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: SSD-NX B SOLD-BOOKED INVENTORY Q3 2024-25.pdf10 Feb 2026
Form 1File: SSD-NX B Form 1 RERA Q4 2024-25.pdf10 Feb 2026
Form 2File: SSD-NX B Form 2 RERA Q4 2024-25.pdf10 Feb 2026
Form 3File: SSD-NX B Form 3 RERA Q4 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: SSD-NX B SOLD-BOOKED INVENTORY Q4 2024-25.pdf10 Feb 2026
Withdrawal Update Form 1File: SSD-NX B Form 1 RERA Q1 2024-25.pdf10 Feb 2026
Withdrawal Update Form 1File: SSD-NX B Form 1 RERA Q2 2024-25.pdf10 Feb 2026
Withdrawal Update Form 1File: SSD-NX B Form 1 RERA Q3 2024-25.pdf10 Feb 2026
Withdrawal Update Form 1File: SSD-NX B Form 1 RERA Q4 2024-25.pdf10 Feb 2026
Withdrawal Update Form 2File: SSD-NX B Form 2 RERA Q1 2024-25.pdf10 Feb 2026
Withdrawal Update Form 2File: SSD-NX B Form 2 RERA Q2 2024-25.pdf10 Feb 2026
Withdrawal Update Form 2File: SSD-NX B Form 2 RERA Q3 2024-25.pdf10 Feb 2026
Withdrawal Update Form 2File: SSD-NX B Form 2 RERA Q4 2024-25.pdf10 Feb 2026
Withdrawal Update Form 3File: SSD-NX B Form 3 RERA Q1 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Withdrawal Update Form 3File: SSD-NX B Form 3 RERA Q2 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Withdrawal Update Form 3File: SSD-NX B Form 3 RERA Q3 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Withdrawal Update Form 3File: SSD-NX B Form 3 RERA Q4 2024-25 110525 Scan_compressed.pdf10 Feb 2026
Proforma of Agreement for saleFile: 0 SSD NX Agreement for Sales Draft 100624 Final.pdf11 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 0 SSD NX Deviation Report with respect to model copy of Agreement - 100624 Scan.pdf11 Jun 2024
Other - TechnicalFile: 0 SSD NX Declaration Undertaking Annexure A - 040424.pdf17 May 2024
Building plan approvalFile: 0 SSD NX Building No B Wing Final.pdf26 Apr 2024
Building plan approvalFile: 0 SSD NX Layout Plan Final.pdf26 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 0 SSD NX Building No B Wing Final.pdf26 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 0 SSD NX Layout Plan Final.pdf26 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: SSD NX CC Order_compressed.pdf23 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 0 SSD NX Format-A for Bank Account 040424.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSD NX Shree Siddhi Vinayak Park Vangani Form 2 080424.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD NX Form 3 RERA 080424.pdf9 Apr 2024
Layout approvalFile: Layout Plan.pdf7 Apr 2024
PAN CardFile: 0 SSD NX PAN CARD.pdf7 Apr 2024
Copy of the legal title reportFile: SSD NX Title and Search Report.pdf7 Apr 2024
Details of encumbrances concerned to FinanceFile: 0 SSD NX Legal Encumbrance 040424.pdf7 Apr 2024
Details of encumbrances concerned to FinanceFile: 0 SSD NX Finance Encumbrance 040424.pdf7 Apr 2024
Details of encumbrances concerned to LegalFile: 0 SSD NX Legal Encumbrance 040424.pdf7 Apr 2024
Details of encumbrances concerned to LegalFile: 0 SSD NX Finance Encumbrance 040424.pdf7 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf7 Apr 2024
Declaration about Commencement CertificateFile: 0 SSD NX Form-D 040424.pdf7 Apr 2024
Declaration in FORM BFile: SSD NX Form B Hemant.pdf7 Apr 2024
Declaration in FORM BFile: SSD NX Form B Rohan.pdf7 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSD NX Shree Siddhi Vinayak Park Vangani Form 1.pdf7 Apr 2024
CERSAI detailsFile: 0 SSD NX Cersai undertaking Letter - 040424.pdf7 Apr 2024
CERSAI detailsFile: 0 SSD NX Cersai Report AB.pdf7 Apr 2024
CERSAI detailsFile: 0 SSD NX Cersai Report DB.pdf7 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 0 SSD NX Disclosure of Interest in Other Real Estate Organizations All Partners.pdf7 Apr 2024
Proforma of Allotment letterFile: 0 SSD NX Proforma of Allotment letter 040424.pdf7 Apr 2024
Deviation Report with respect to Allotment letterFile: 0 SSD NX Deviation Report with respect to Allotment Letter - 040424.pdf7 Apr 2024
Other - LegalFile: 0 SSD NX Partnership Deed.pdf7 Apr 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SIDDHIVINAYAK PARK B TYPE BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VANGANI7,600+ in Thane

2 kmSHREE SIDDHIVINAYAK PARKCompleted 2Lapsed / revoked 8Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: SATYASHIV BUILDERS AND DEVELOPERS NX

SATYASHIV BUILDERS AND DEVELOPERS NX has 1 registration on MahaRERA, including SHREE SIDDHIVINAYAK PARK B TYPE BUILDING. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE SIDDHIVINAYAK PARK B TYPE BUILDING is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SIDDHIVINAYAK PARK B TYPE BUILDING?

The registered promoter entity is SATYASHIV BUILDERS AND DEVELOPERS NX, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SIDDHIVINAYAK PARK B TYPE BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SIDDHIVINAYAK PARK B TYPE BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SIDDHIVINAYAK PARK B TYPE BUILDING?

The professionals named in the filing: Architect: MADAN V SOKANDE AND ASSOCIATES; Engineer: TREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS; Chartered Accountant: DINESH J POKAR AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SIDDHIVINAYAK PARK B TYPE BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SIDDHIVINAYAK PARK B TYPE BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SIDDHIVINAYAK PARK B TYPE BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.