Home / Browse projects / Thane, Maharashtra / SHREE SHASHWAT BUILDING NO. 22

Registered No litigation declared Residential / Group Housing project

SHREE SHASHWAT BUILDING NO. 22

By Raj InfraEmpire Private Limited

RG-MH-07322 · RERA P51700055427 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
21 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SHREE SHASHWAT BUILDING NO. 22 is a Residential / Group Housing project by Raj InfraEmpire Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700055427 on 22 Mar 2024. Possession is promised by 14 Jan 2027. 64 of the 85 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE SHASHWAT BUILDING NO. 22
  • TypeResidential / Group Housing
  • Location
    • MIRA BHAYANDER ROAD
    • SHREE SHASHWAT COMPLEX
    • PLEASANT PARK
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055427
  • ReraGenie IDRG-MH-07322

Builder

  • NameRaj InfraEmpire Private Limited
  • Entity typeCompany
  • DirectorPIYUSHKUMAR BABULAL JAIN
  • Managing DirectorsRAJESH KUMAR PHOOLRAJ SINGH, MUKESH JUHARMAL PARMAR

Key dates

this monthRegisteredMar 2024PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion14 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

75%64 of 85 units booked
79.8%Work done, per cost certificate

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO DNA232285085

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

BLDG NO D: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,878 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
UDAY GHANSHYAM NAIKMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI5836.92
Proposed, not sanctioned5,837 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMTNL ROAD, SHEETAL NAGAR, MIRA ROAD EAST
Estimated costRs 23.50 cr
Cost incurredRs 18.75 cr
Work done79.79%
BuildingWingEstimatedIncurred
BLDG NO DNARs 21.00 crRs 17.00 cr
-NARs 2.50 crRs 1.75 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH & ASSOCIATES
EngineerJITEN PATEL
Chartered AccountantMBR & ASSOCIATES
Chartered AccountantP M Kunder and Co
PartnerRole in project
Raj InfraEmpire Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 14 Jan 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RIEPL Withdrawal Application Form1.pdf9 Apr 2026
Withdrawal Update Form 2File: RIEPL Withdrawal Application Form2.pdf9 Apr 2026
Withdrawal Update Form 3File: RIEPL Withdrawal Application Form3.pdf9 Apr 2026
Layout approvalFile: Layout Plan highlighted.pdf3 Apr 2026
Layout approvalFile: D-Wing highlight.pdf3 Apr 2026
Withdrawal Update Form 1File: Raj Infra From 1 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Raj Infra From 1 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Raj Infra From 1 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Raj Infra From 1 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj Infra From 2 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj Infra From 2 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj Infra From 2 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Raj Infra From 2 Dec 25.pdf13 Jan 2026
Withdrawal Update Form 3File: Raj Infra Form3 (1).pdf13 Jan 2026
Withdrawal Update Form 3File: Raj Infra Form3 (1).pdf13 Jan 2026
Withdrawal Update Form 3File: Raj Infra Form3 (1).pdf13 Jan 2026
Withdrawal Update Form 3File: Raj Infra From 3 Dec 25.pdf13 Jan 2026
Layout approvalFile: Layout Plan highlighted.pdf5 Nov 2025
Layout approvalFile: D-Wing highlighted.pdf5 Nov 2025
Withdrawal Update Form 1File: RIPL.pdf20 Oct 2025
Withdrawal Update Form 2File: RIE Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Raj Infra Form3 (1).pdf20 Oct 2025
Withdrawal Update Form 1File: Arc RIPL.pdf4 Aug 2025
Withdrawal Update Form 2File: Raj Infra form 2.pdf4 Aug 2025
Withdrawal Update Form 3File: Raj Infra Form 3 30062025.pdf4 Aug 2025
Form 1File: Arc RIPL.pdf26 Jul 2025
Form 2File: Eng RIPL.pdf26 Jul 2025
Form 3File: Raj Infra Form 3 Mar- 25.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Raj Infra disclosure of Sold.pdf26 Jul 2025
Form 2A (FY 2024-2025)File: 24062025.pdf24 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 Shree Shashwat Bldg No 22.pdf18 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Revised_11zon.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc RIPL.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc RIPL.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj InfraEmpire 31122024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng RIPL.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality RIPL.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Raj Infra.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Infra.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj infaempire.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Infra CA 30Sept2024.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj infaempire.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Infra CA 30Sept2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Infra.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Raj Infra.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc RAj Infraempire.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Infraempire.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj Infraempire.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj InfraEmpire CA Certificate 30JUNE2024.pdf6 Jul 2024
Layout approvalFile: LAYOUT NEW 14032024.pdf14 Mar 2024
Copy of Layout Approval (in case of layout)File: LAYOUT NEW 14032024.pdf14 Mar 2024
Other - TechnicalFile: ANNEX A - INFRAEMPIRE.pdf14 Mar 2024
Other - TechnicalFile: Declaration.pdf14 Mar 2024
Other - LegalFile: 7_12_merged.pdf2 Mar 2024
Copy of the legal title reportFile: Title Certificate dated 29022024.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE (3 files merged).pdf1 Mar 2024
Other - TechnicalFile: Declartion Plinth Area.pdf1 Mar 2024
Other - TechnicalFile: Declaration of Agreement.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - converted (1).pdf1 Feb 2024
Building plan approvalFile: D Wing.pdf9 Jan 2024
PAN CardFile: PAN CARD.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: D Wing.pdf9 Jan 2024
Declaration about Commencement CertificateFile: Declaration CC.pdf9 Jan 2024
Declaration in FORM BFile: FORM B.pdf9 Jan 2024
CERSAI detailsFile: Undertaking.pdf9 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER (1).pdf9 Jan 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf9 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abount Seprate bank Account.pdf9 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation.pdf9 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation with Respect to AFS.pdf9 Jan 2024

How this compares with Thane

75%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SHASHWAT BUILDING NO. 22 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHREE SHASHWAT COMPLEX, PLEASANT PARK, MIRA ROAD EAST7,600+ in Thane

2 kmSHREE SHASHWAT BUILDING Completed 88Lapsed / revoked 69Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 241 registered projects within 2 km.

Builder: Raj InfraEmpire Private Limited

Raj InfraEmpire Private Limited has 1 registration on MahaRERA, including SHREE SHASHWAT BUILDING NO. 22. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE SHASHWAT BUILDING NO. 22 is delayed beyond 14 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SHASHWAT BUILDING NO. 22?

The registered promoter entity is Raj InfraEmpire Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SHASHWAT BUILDING NO. 22?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SHASHWAT BUILDING NO. 22?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SHASHWAT BUILDING NO. 22?

The professionals named in the filing: Architect: ANISH & ASSOCIATES; Engineer: JITEN PATEL; Chartered Accountant: MBR & ASSOCIATES; Chartered Accountant: P M Kunder and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SHASHWAT BUILDING NO. 22?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SHASHWAT BUILDING NO. 22. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SHASHWAT BUILDING NO. 22 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.