SHREE SHASHWAT BUILDING NO. 21

By G N DEVELOPERS

RG-MH-07309 · RERA P51700055631 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 82%
15 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SHREE SHASHWAT BUILDING NO. 21 is a Residential / Group Housing project by G N DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055631 on 5 Apr 2024. Possession is promised by 14 Jan 2027. 70 of the 85 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE SHASHWAT BUILDING NO. 21
  • TypeResidential / Group Housing
  • Location
    • PLEASANT PARK MIRA BHAYANDER ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055631
  • ReraGenie IDRG-MH-07309

Builder

  • NameG N DEVELOPERS
  • Entity typePartnership
  • PartnersMUKESH JUHARMAL PARMAR, RAJENDRA KUMAR BHAGAWATIPRASAD SHARMA, SANTOSH MANSARAM PATIL, PIYUSHKUMAR BABULAL JAIN
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredApr 2024PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion14 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Current status

82%70 of 85 units booked
86.8%Work done, per cost certificate

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO CNA232285085

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 82%.

BLDG NO C: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.42%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes20%
Open ParkingYes80%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered51
Open Space9

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area293 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
UDAY GHANSHYAM NAIKMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI5783.33
Proposed, not sanctioned5,783 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA ROAD EAST
Estimated costRs 26.50 cr
Cost incurredRs 23.00 cr
Work done86.79%
BuildingWingEstimatedIncurred
BLDG NO CNARs 23.50 crRs 20.00 cr
-NARs 3.00 crRs 3.00 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish and Associates
EngineerJITEN PATEL
Chartered AccountantM B R & ASSOCIATES
PartnerRole in project
G N DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 14 Jan 2027

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: GND Withdrawal Application Form1.pdf9 Apr 2026
Withdrawal Update Form 2File: GND Withdrawal Application Form2.pdf9 Apr 2026
Withdrawal Update Form 3File: GND Withdrawal Application Form3.pdf9 Apr 2026
Withdrawal Update Form 1File: GND Form 1 Dec 25.pdf12 Jan 2026
Withdrawal Update Form 2File: GND Form 2 Dec 25.pdf12 Jan 2026
Withdrawal Update Form 3File: GND Form 3 Dec 25.pdf12 Jan 2026
Withdrawal Update Form 1File: GND.pdf15 Oct 2025
Withdrawal Update Form 2File: GND Form 2.pdf15 Oct 2025
Withdrawal Update Form 3File: GND Form 3.pdf15 Oct 2025
Withdrawal Update Form 1File: ArcGND.pdf30 Jul 2025
Withdrawal Update Form 2File: Form 2 GND 30062025.pdf30 Jul 2025
Withdrawal Update Form 3File: GN DEVELOPERS form-3.pdf30 Jul 2025
Form 1File: Arc GND.pdf25 Jul 2025
Form 2File: Eng GND.pdf25 Jul 2025
Form 3File: Form 3 GN Developers 31032025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: GND disclosure of Sold.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc GND.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc GND.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GN Form 3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng GND.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality GND.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA GND.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA GND.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng GND.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc GND.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality GND.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc GND.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng GND.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality GND.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GND Bldg 21 Architect Certificate.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GND Bldg 21 Engineer Certificate.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GND Bldg 21 quality Certificate.pdf6 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration on Encumbrances.pdf4 Apr 2024
Details of encumbrances concerned to LegalFile: Declaration on Encumbrances.pdf4 Apr 2024
Layout approvalFile: Layout.pdf19 Mar 2024
Copy of the legal title reportFile: Title Rera.pdf19 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf19 Mar 2024
CERSAI detailsFile: Undertaking.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New CA Certificate GN Developers.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other.pdf19 Mar 2024
Proforma of Agreement for saleFile: RERA AGR SS22.pdf19 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER (2).pdf19 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account.pdf19 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf19 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS.pdf19 Mar 2024
Other - LegalFile: 712 Pherphar.pdf19 Mar 2024
Other - TechnicalFile: Declaration Rera Registration.pdf19 Mar 2024
Other - TechnicalFile: Annexure A.pdf19 Mar 2024
Other - TechnicalFile: Declaration Plinth.pdf19 Mar 2024
Other - TechnicalFile: Declaration GN Construction.pdf19 Mar 2024
Building plan approvalFile: C Wing.pdf9 Jan 2024
PAN CardFile: Pan.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: C Wing.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf9 Jan 2024
Declaration about Commencement CertificateFile: Declaration CC.pdf9 Jan 2024
Declaration in FORM BFile: FORM B.pdf9 Jan 2024

How this compares with Thane

82%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SHASHWAT BUILDING NO. 21 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmSHREE SHASHWAT BUILDING Completed 2Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: G N DEVELOPERS

G N DEVELOPERS has 2 registrations on MahaRERA, including G N HEIGHTS and SHREE SHASHWAT BUILDING NO. 21. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE SHASHWAT BUILDING NO. 21 is delayed beyond 14 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SHASHWAT BUILDING NO. 21?

The registered promoter entity is G N DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SHASHWAT BUILDING NO. 21?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SHASHWAT BUILDING NO. 21?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SHASHWAT BUILDING NO. 21?

The professionals named in the filing: Architect: Anish and Associates; Engineer: JITEN PATEL; Chartered Accountant: M B R & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SHASHWAT BUILDING NO. 21?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SHASHWAT BUILDING NO. 21. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SHASHWAT BUILDING NO. 21 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.