SHREE SHANKHESHWAR ASHISH

By RAJARAM CONSTRUCTION

RG-MH-47647 · RERA P51700045694 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Rs 20.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
99 of 138Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

SHREE SHANKHESHWAR ASHISH is a Residential / Group Housing project by RAJARAM CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700045694 on 6 Jun 2022. Possession is promised by 31 Dec 2026. 39 of the 138 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHREE SHANKHESHWAR ASHISH
  • TypeResidential / Group Housing
  • Location
    • WAKARWADI
    • UTHALSAR
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045694
  • ReraGenie IDRG-MH-47647

Builder

  • NameRAJARAM CONSTRUCTION
  • Entity typePartnership
  • PartnersVILAS RAJARAM GAIKAR, SUBHASH GANU BHOIR, RAMESH MARUTI BHEKARE
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed137 files

Current status

28%39 of 138 units booked
100.0%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SHANKHESHWAR ASHISHNA252288088
VIGHNAHARTA SRA CHS LTDNA232344650

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SHREE SHANKHESHWAR ASHISH91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VIGHNAHARTA SRA CHS LTD91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,532 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on26 Sep 2024
LandownerVillageDistrict
PADMAVATI BUILDERS & DEVELOPERSThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region, Slum Rehabilitation Authority, Thane
Permissible FSI14936.37
Proposed, not sanctioned11,255 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAURABH CHS, OFF SERVICE ROAD, EASTERN EXPRESS HIGHWAY, NEAR MODI HYUNDAI SHOWROOM, PANCHPAKHADI, THANE
Estimated costRs 70.37 cr
Cost incurredRs 70.37 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHREE SHANKHESHWAR ASHISHNARs 41.27 crRs 41.27 cr
VIGHNAHARTA SRA CHS LTDNARs 29.10 crRs 29.10 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNEXSTEP CONSULTANT
ArchitectJoshi Deshaware & Associates
EngineerAJAY MAHALE
EngineerAssociated Structural Engineers LLP
EngineerSANJAY VASANT PATIL
EngineerAJAY DADARAO PAWAR
Chartered AccountantROSHAN GAWDE & CO
Chartered AccountantA K O R D & CO
PartnerRole in project
RAJARAM CONSTRUCTION-

Litigation declared3

CaseCourtStatus
486/2016JOINT CIVIL JUDGE SENIOR DIVISIONClosed
672/2019JOINT CIVIL JUDGE SENIOR DIVISIONClosed
165/2016ADDITIONAL DISTRICT JUDGEClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2 A_Shree Shankeshwar Ashish FY 25-26.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1- SSA Q4 FY 25-26 Signed.pdf22 Jun 2026
Withdrawal Update Form 2File: FORM 2 -SSA Q4 FY 25-26 signed.pdf22 Jun 2026
Withdrawal Update Form 3File: FORM 3 Shree Sankeshwar Ashish Q4 FY 25-26 Signed.pdf22 Jun 2026
Withdrawal Update Form 1File: Shree Shankheswar Ashish Form-1 Architect CERTIFICATE.pdf14 Feb 2026
Withdrawal Update Form 2File: Shree Shankheswar Ashish Form-2 ENGINEER CERTIFICATE.pdf14 Feb 2026
Withdrawal Update Form 3File: Scanned form 3 Shree Shankeshwar Ashish_Sign.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Shree Shankheshwar Ashish Final.pdf9 Dec 2025
Withdrawal Update Form 2File: Shree Shankheshwar Ashish-Form-2-Engineer Certificate Final.pdf9 Dec 2025
Withdrawal Update Form 3File: scanned form 3 shree shank_SIGNED u0026 STAMPED_compressed Final.pdf9 Dec 2025
Form 5 (FY 2024-2025)File: From-5 Shree Shankheswar Ashish Final Signed.pdf1 Dec 2025
Withdrawal Update Form 1File: Form-1 ARCHITECT CERTIFICATE Q1 FY 25-26.pdf24 Aug 2025
Withdrawal Update Form 2File: Form-2 ENGINEER CERTIFICATE Q1 FY 25-26.pdf24 Aug 2025
Withdrawal Update Form 3File: Form-3 CA CERTIFICATE Q1 FY 25-26.pdf24 Aug 2025
Withdrawal Update Form 1File: Form-1 ARCHITECT CERTIFICATE Q1 FY 25-26.pdf22 Aug 2025
Withdrawal Update Form 2File: Form-2 ENGINEER CERTIFICATE Q1 FY 25-26.pdf22 Aug 2025
Withdrawal Update Form 3File: Form-3 CA CERTIFICATE Q1 FY 25-26.pdf22 Aug 2025
Form 2A (FY 2024-2025)File: Final Form 2A_FY 2024-25_Shree Shankheshwar Ashish.pdf2 Jul 2025
Form 1File: FORM 1.pdf10 Jun 2025
Form 2File: SHRI SANKESHWAR ASHISH FORM 2 Q3 FY 24-25.pdf10 Jun 2025
Form 3File: Shree Shankheshwar Ashish Form 3 Q3 FY 24-25.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory (Revised).pdf10 Jun 2025
OthersFile: Declarations.pdf10 Jun 2025
Form 1File: Form 1_Q4_FY 2024-25_SSA.pdf10 Jun 2025
Form 2File: SHREE SHANKHESHWAR FORM 2 RERA Q4 FY 24-25.pdf10 Jun 2025
Form 3File: FINAL FORM 3_Q4_FY 2024-25.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf10 Jun 2025
OthersFile: Declarations.pdf10 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3_Q4_FY 2024-25_compressed (1).pdf7 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance and Legal.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4_FY 2024-25_SSA.pdf28 Apr 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf28 Apr 2025
CERSAI detailsFile: Annexure G-Debtor Based Declaration.pdf28 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance and Legal.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Shankheshwar Ashish Form 3 Q3 FY 24-25.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHRI SANKESHWAR ASHISH FORM 2 Q3 FY 24-25.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory (Revised).pdf1 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance and Legal.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Jan 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf23 Jan 2025
CERSAI detailsFile: Annexure G-Debtor Based Declaration.pdf23 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance and Legal.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24 shri signed final.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM NO2 Q2 FY 2024-25.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed form 3 Q2.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_Revised_with 3page.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Rajaram Con.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Rajaram Con.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1_FY 2024-25.pdf14 Nov 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf23 Oct 2024
CERSAI detailsFile: ASSETS BASED.pdf23 Oct 2024
CERSAI detailsFile: DEBTOR BASED.pdf23 Oct 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES.pdf23 Oct 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance con to Legal.pdf25 Jul 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance con to Legal.pdf25 Jul 2024
CERSAI detailsFile: Annexure L- Asset Based Declaration.pdf25 Jul 2024
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf25 Jul 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Concerened to legal.pdf28 May 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Concerened to legal.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q3.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 May 2024
CERSAI detailsFile: Asset Based Declaration.pdf28 May 2024
CERSAI detailsFile: Debtor based declaration.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3_Shree Shankeshwar Ashish_Q3.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_Q4_FY 2023-24_Shree Shankeshwar Ashish signed.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 22-23.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Period Apr 23 To Sep 23.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: Shree Shankheshwar Ashish - Annexure K-Non-Encumbrance Concerned to Finance.pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: Shree Shankheshwar Ashish - Annexure K-Non-Encumbrance Concerned to Legal.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: Shree Shankheshwar Ashish - Annexure K-Non-Encumbrance Concerned to Finance.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: Shree Shankheshwar Ashish - Annexure K-Non-Encumbrance Concerned to Legal.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Shree Shankheshwar Ashish Annexure B-Disclosure of Sold or Unsold Inventory_Shree Shankesh31 Jan 2024
CERSAI detailsFile: Shree Shankheshwar Ashish RERA - Annexure G-Asset Based Declaration.pdf31 Jan 2024
CERSAI detailsFile: Shree Shankheshwar Ashish RERA - Annexure L-Debtor Based Declaration.pdf31 Jan 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUKUR SAPPHIRE PHASE IOFF GHODBUNDER ROAD ANAND NAGAR155CompletedDec 2022Jul 2021
SUKUR ENCLAVE DVILLAGE VADVALI OFF GHODBUNDER ROAD THANE72CompletedDec 2018Feb 2018
SUKUR ENCLAVE B AND CVILLAGE VADAVALI ANAND NAGAR GB ROAD THANE193CompletedJun 2017Jun 2017

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SHANKHESHWAR ASHISH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UTHALSAR7,600+ in Thane

2 kmSHREE SHANKHESHWAR ASHISCompleted 175Lapsed / revoked 97Other 208Dot size: filed unitsN

Filed coordinates, straight-line distance. 480 registered projects within 2 km.

Builder: RAJARAM CONSTRUCTION

RAJARAM CONSTRUCTION has 5 registrations on MahaRERA, including SUKUR ENCLAVE PHASE 1 and SUKUR SAPPHIRE PHASE I. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE SHANKHESHWAR ASHISH is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SHANKHESHWAR ASHISH?

The registered promoter entity is RAJARAM CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SHANKHESHWAR ASHISH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SHANKHESHWAR ASHISH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SHANKHESHWAR ASHISH?

The professionals named in the filing: Architect: NEXSTEP CONSULTANT; Architect: Joshi Deshaware & Associates; Engineer: AJAY MAHALE; Engineer: Associated Structural Engineers LLP; Engineer: SANJAY VASANT PATIL; Engineer: AJAY DADARAO PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SHANKHESHWAR ASHISH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SHANKHESHWAR ASHISH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SHANKHESHWAR ASHISH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.