Home / Browse projects / Sindhudurg, Maharashtra / Shree Sadan

Registered No litigation declared Residential / Group Housing project

Shree Sadan

By Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote

RG-MH-02023 · RERA P52900013755 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 87 months
  • 6 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 87 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 85%
17 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 226 documents Report an error

Shree Sadan is a Residential / Group Housing project by Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote in Sindhudurg, Maharashtra, registered with MahaRERA as P52900013755 on 25 Oct 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 87 months from the original filing. 1 of the 18 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Sadan
  • TypeResidential / Group Housing
  • Location
    • Kalmath
    • Kankavli
    • Sindhudurg
    • 416602
  • Pincode416602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900013755
  • ReraGenie IDRG-MH-02023

Builder

  • NameShreeyash Builders and Developers proprietor Shriram Nivruti Thormote
  • Entity typeIndividual
  • GSTIN27AAHPT1921C1ZX
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseDec 2019Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed226 files

Current status

6%1 of 18 units booked
155.9%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree SadanNA5518018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Shree Sadan: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered10
Open Space4

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area625 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 May 2025

Approvals and building plan

Sanctioning authorityTown Planning Sindhudurg
Permissible FSI1106.04
Proposed, not sanctioned1,106 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor, Laxmi complex, BKG road, opp ST bus stand, Kankavli
Estimated costRs 2.50 cr
Cost incurredRs 3.90 cr
Work done155.89%
BuildingWingEstimatedIncurred
Shree SadanNARs 2.50 crRs 3.90 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh Sawant
EngineerYogesh Sawant
Chartered AccountantK P Joshi and Associates
Chartered AccountantJagdish Salunkhe
Chartered AccountantKamlesh Mangal & Co
PartnerRole in project
Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote-

Extensions applied for6

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900003934Dec 2019 → Dec 2020

Reason as filed by the promoterWe would like to request for an extension of project completion to a later time due to the following factors that were out of our control - Availability of Labours for construction work was limited with the appointed contractor. Limited availability of funds reduced the pace of the work due to non booking of units in projects reducing the cash flow predicted from the sales. Above normal Rainfall in the season reduced the number of days available for carrying out construction activity.

EXT52900012065Dec 2019 → Mar 2023

Reason as filed by the promoterRevise project sanction as per new FSI rule. Due to above project 2 floor additional construction permission received from authority. We have required additional time to construct additional area of construction.

EXT52900015154Dec 2019 → Mar 2024

Reason as filed by the promoterDue to the slowdown in the Real Estate market in Kankavli (where the said Project is situated), the expected revenue against the sales proceeds was very low. Hence making alternate arrangements for additional funds requires additional time, in order to complete the Project. Hence this application is to extend the project along with the consent of allottees in the Project. Therefore, we kindly request you permit the extension of the project as per the date above.

EXT52900019530Dec 2019 → Mar 2025

Reason as filed by the promoterDue to the slowdown in the Real Estate market in Kankavli (where the said Project is situated), the expected revenue against the sales proceeds was very low. Hence making alternate arrangements for additional funds requires additional time, in order to complete the Project. Hence this application.

EA06052501017Dec 2019 → Mar 2026

Reason as filed by the promoterWe are facing financial constraints due to low cash flow, as the flats have not yet been sold. This has further impacted our ability to progress as planned. As a result, additional time is necessary to address the delays and complete the required tasks. Hence, additional time is required to address the delays, requesting you to grant us the same.

EA16022619853Dec 2019 → Mar 2027

Reason as filed by the promoterThe project is situated in a remote area, due to which there has been no sale of flats. This has resulted in low cash flow and financial constraints, affecting the progress of the project as originally planned. Owing to these financial difficulties, we have availed a loan from the bank, which is presently in its final stage of processing. In view of the above circumstances, additional time is required to regularize the financial position and complete the remaining work of the project. Hence, additional time is required to address the delays, requesting you to grant us the same.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed226

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 226 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form2A FY 2025-26 Shree Sadan.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf6 Feb 2026
Withdrawal Update Form 3File: MahaCiti_Shree Sadan_Form 3 _Q3_FY 25-26.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1 (1).pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 Q2.pdf4 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 2024-25 SHREE SADAN.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 (1).pdf26 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf26 Sep 2025
Withdrawal Update Form 3File: Shree Sadan_Form 3 _Q1_FY 25-26_MahaCRITI.pdf26 Sep 2025
Form 2A (FY 2024-2025)File: Form2A.pdf23 Sep 2025
Form 1File: Form 1 Q4.pdf30 Jul 2025
Form 2File: Form 2 Q4.pdf30 Jul 2025
Form 3File: final form-3 Q-4 24-25.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q4 Disclosure of sold booked inventory.pdf30 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A portal info.pdf14 May 2025
Form 1File: Form 1.pdf9 May 2025
Form 2File: Form 2.pdf9 May 2025
Form 3File: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Form 1File: Form 2.pdf9 May 2025
Form 2File: Disclosure.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Form 2.pdf9 May 2025
Form 2File: Disclosure.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Form 2.pdf9 May 2025
Form 2File: Disclosure.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Disclosure.pdf9 May 2025
Form 2File: Form 2.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Disclosure.pdf9 May 2025
Form 2File: Form 2.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Disclosure.pdf9 May 2025
Form 2File: Form 2.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Disclosure.pdf9 May 2025
Form 2File: Form 2.pdf9 May 2025
Form 3File: Form 1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - 2020-21 D5 - w sign date.pdf9 May 2025
Form 1File: Form 1 Q1.pdf9 May 2025
Form 2File: Form 2 Q1.pdf9 May 2025
Form 3File: Form 3 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Form 1File: Form 2 Q1.pdf9 May 2025
Form 2File: Form 1 Q1.pdf9 May 2025
Form 3File: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Q1.pdf9 May 2025
Form 1File: Form 3 Q1.pdf9 May 2025
Form 2File: Form 2 Q1.pdf9 May 2025
Form 3File: Form 1 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Form 1File: Form 2 Q1.pdf9 May 2025
Form 2File: Form 1 Q1.pdf9 May 2025
Form 3File: Form 3 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Form 1File: Form 2 Q1.pdf9 May 2025
Form 2File: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Form 3File: Form 1 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Q1.pdf9 May 2025
Form 1File: Form 1 Q1.pdf9 May 2025
Form 2File: Q1 Disclosure of sold booked inventory.pdf9 May 2025
Form 3File: Form 3 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Form 2 Q1.pdf9 May 2025
Form 1File: Form 2 Q1.pdf9 May 2025
Form 2File: Form 1 Q1.pdf9 May 2025
Form 3File: Form 3 Q1.pdf9 May 2025
Disclosure of Sold and Booked InventoryFile: Q1 Disclosure of sold booked inventory.pdf9 May 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Homeshree ApartmentSurvey No. 36 2B 12 2 Mathura Colony Rahatni Pune - 4110178CompletedApr 2017Apr 2017

How this compares with Sindhudurg

6%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 87 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Shree Sadan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kankavli530+ in Sindhudurg

2 kmShree SadanCompleted 14Lapsed / revoked 12Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote

Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote has 1 registration on MahaRERA, including Shree Sadan. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Shree Sadan is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Sadan?

The registered promoter entity is Shreeyash Builders and Developers proprietor Shriram Nivruti Thormote, an individual as per the filing. Its GSTIN 27AAHPT1921C1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Sadan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Sadan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Sadan?

The professionals named in the filing: Architect: Yogesh Sawant; Engineer: Yogesh Sawant; Chartered Accountant: K P Joshi and Associates; Chartered Accountant: Jagdish Salunkhe; Chartered Accountant: Kamlesh Mangal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Sadan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Sadan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Sadan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.