Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE PADMARAJ RESIDENCY is a Residential / Group Housing project by SHREEKAR CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600077176 on 29 Jul 2024. Possession is promised by 30 Apr 2028. 14 of the 58 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE PADMARAJ RESIDENCY
- TypeResidential / Group Housing
- Location
- RAVISHANKAR MARG
- BEHIND VIJAY MAMTA CINEMAS
- WADALA
- NASHIK
- Nashik (M Corp.)
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600077176
- ReraGenie IDRG-MH-07047
Builder
- NameSHREEKAR CONSTRUCTION
- Entity typePartnership
- GSTIN27AFEFS3789M1Z5
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersAMIT DEVIDAS KARDILE, RITU LAXMIKANT AGARWAL, DEV HARESHKUMAR BHAGAT
- Other registrations1 more →
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jul 2024
- Promised completion30 Apr 2028
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE PADMARAJ RESIDENCY | NA | 8 | 8 | 45 | 13 | 58 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
SHREE PADMARAJ RESIDENCY: 42% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MANGESH DATTATRAY GANORE | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE PADMARAJ RESIDENCY | NA | Rs 10.00 cr | Rs 4.31 cr |
| - | NA | Rs 10.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHIRAJ T WALUNG |
| Engineer | AMOLKUMAR BHOI |
| Chartered Accountant | NATESH AND ASSOCIATES |
| Chartered Accountant | Sachin K. Mishra & Co. |
| Chartered Accountant | R H Pothiwal & Associates |
| Partner | Role in project |
|---|---|
| SHREEKAR CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1_Sept 2024.pdf | 20 May 2026 |
| Form 2File: Form 2_Sept 2024.pdf | 20 May 2026 |
| Form 3File: Form 3_Sept 2024.pdf | 20 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold disclosure_Sep 24.pdf | 20 May 2026 |
| Form 1File: Form 1_Dec 24.pdf | 20 May 2026 |
| Form 2File: Form 2_Dec 24.pdf | 20 May 2026 |
| Form 3File: Form 3_Dec 24.pdf | 20 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold disclosure_Dec 24.pdf | 20 May 2026 |
| Form 1File: Form 1_Mar 25.pdf | 20 May 2026 |
| Form 2File: Form 2_Mar 25.pdf | 20 May 2026 |
| Form 3File: Form 3_Mar 25.pdf | 20 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold disclosure_Mar 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Sept 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 25.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26.pdf | 20 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 OCTTODEC24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 JULY-SEPT24.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf | 15 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CHANGE OF NAME COMMENCEMENT.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engineer.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBANCES FINANCE.pdf | 5 Jun 2024 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBANCES FINANCE.pdf | 5 Jun 2024 |
| CERSAI detailsFile: NO CERSAI.pdf | 5 Jun 2024 |
| Other - TechnicalFile: ANNEXURE A.pdf | 5 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBANCES FINANCE.pdf | 25 May 2024 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBANCES FINANCE.pdf | 25 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf | 25 May 2024 |
| Declaration about Commencement CertificateFile: DECLERATION ABOUT COMMMENCEMENT.pdf | 13 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SACHINB DESHMUKH.pdf | 13 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest aggrawal.pdf | 13 May 2024 |
| Proforma of Agreement for saleFile: Padmaraj Resi RERA Draft.pdf | 13 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE PADMARAJ RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BEHIND VIJAY MAMTA CINEMAS, WADALA, NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 146 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: SHREEKAR CONSTRUCTION
SHREEKAR CONSTRUCTION has 2 registrations on MahaRERA, including SHREE PADMARAJ RESIDENCY and Crystal Court Commercial Complex. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE PADMARAJ RESIDENCY is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE PADMARAJ RESIDENCY?
The registered promoter entity is SHREEKAR CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AFEFS3789M1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE PADMARAJ RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE PADMARAJ RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE PADMARAJ RESIDENCY?
The professionals named in the filing: Architect: DHIRAJ T WALUNG; Engineer: AMOLKUMAR BHOI; Chartered Accountant: NATESH AND ASSOCIATES; Chartered Accountant: Sachin K. Mishra & Co.; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE PADMARAJ RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback