ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHREE NIDHI HEIGHTS B WING

Registration lapsed No litigation declared Residential / Group Housing project

SHREE NIDHI HEIGHTS B WING

By SHREE NIDHI DEVELOPERS

RG-MH-28537 · RERA P51700026692 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
4 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

SHREE NIDHI HEIGHTS B WING is a Residential / Group Housing project by SHREE NIDHI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700026692 on 21 Oct 2020. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 9 months from the original filing. 122 of the 126 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE NIDHI HEIGHTS B WING
  • TypeResidential / Group Housing
  • Location
    • NAVGHAR
    • RAMDEV PARK
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700026692
  • ReraGenie IDRG-MH-28537

Builder

  • NameSHREE NIDHI DEVELOPERS
  • Entity typePartnership
  • PartnersBhavesh Mafatlal Mehta, Vijayalaxmi Basavraj Gadekar, Sanjay Jayantibhai Gedia
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredOct 2020First promiseJun 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Oct 2020
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed102 files

Current status

97%122 of 126 units booked
64.8%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE NIDHI HEIGHTS B WINGNA323010917126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHREE NIDHI HEIGHTS B WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered4
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,220 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMr. Sanjay Gedia
Permissible FSI2963.77
Proposed, not sanctioned2,964 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD EAST
Estimated costRs 46.55 cr
Cost incurredRs 30.16 cr
Work done64.8%
BuildingWingEstimatedIncurred
SHREE NIDHI HEIGHTS B WINGNARs 41.90 crRs 27.82 cr
-NARs 4.66 crRs 2.35 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ S CONSULTANT
ArchitectTejsConsultant
EngineerTEJ S CONSULTANT
EngineerAdarsh Consultant
Chartered AccountantAshvin Thumar & Co
Chartered AccountantTodi Tulsayaan andCo
PartnerRole in project
SHREE NIDHI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24062501731Jun 2025 → Mar 2026

Reason as filed by the promoterWe most humbly submit hereunder reasons to consider Application for extension u/s7(3) without 51% consent for completion of the project and as per MahaRERA Order No.40/2022 dated 27.12.2022 and No.40A/2023 dated 15.5.2023:- 1. That our project is already completed in the month of February 2025 and we have obtained 100% project completion Certificate dated 22nd February 2025 from the Project Architect and we have applied for OC for the project. 2. That the allottees have fear that their rights will get compromised if they will sign the consent form for extension of the project. 3. That the proj

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1March 2026.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf16 May 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf16 May 2026
Form 2A (FY 2024-2025)File: shree nidhi developers (Form -2A) 2024-25.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: 245(wingB) .pdf20 Apr 2026
Form 5 (FY 2024-2025)File: Forms 5 SND.pdf20 Apr 2026
Withdrawal Update Form 1File: form 1 DEC 2025.pdf31 Mar 2026
Withdrawal Update Form 1File: form 1 DEC 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 1File: form 1 DEC 2025.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf6 Feb 2026
Withdrawal Update Form 1File: Form1 sept 2025.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 Sept 2025 new.pdf28 Jan 2026
Withdrawal Update Form 3File: Form - 3_sept 2025.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM1 June 2025.pdf5 Dec 2025
Withdrawal Update Form 2File: FORM 2 June 2025.pdf5 Dec 2025
Withdrawal Update Form 3File: Form 3 as on June 25.pdf5 Dec 2025
Form 1File: Form 1 Mar-25 Quater.pdf13 Aug 2025
Form 2File: Form-2 Mar-25 Quarter.pdf13 Aug 2025
Form 3File: FORM 3.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold Mar25.pdf13 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec Quater.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec Quater.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (2).pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (2) (1).pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (2).pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (2) (1).pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Shri Nidhi.PDF29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate SND Q4-Both Signed.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31st Mar 2024.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 31st Mar 2024.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31 Mar 2023.pdf14 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate SND Q1_Signed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate SND Q2_Signed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate SND Q3_Signed.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 June 2023.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 Sept 2023.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31st Dec 2023.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30th June 23.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30th Sep 23.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30th Dec 23.pdf28 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5.PDF5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 JUNE22.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sept22.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec22.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-March23.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD OR BOOKING INVENTORY SHREE NIDHI DEVELOPERS.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CASigned Shree Nidhi Developers.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 June 2022.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 Sept 2022.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 Dec 2022.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 Mar 2023.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Q1 FY 22-23 - BOTH SIGNED.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Q2 FY 22-23- BOTH SIGNED.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SND Q3 22-23 BOTH SIGNED.pdf16 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 067c5e66-0516-41d7-963a-535fdb0fd6eb.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form -2A.pdf15 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Shree Nidhi B 01.pdf15 Dec 2022
Proforma of Agreement for saleFile: Shree Nidhi B 01.pdf14 Dec 2022
Deviation Report with respect to Allotment letterFile: FORMAT.pdf14 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: CONSULTING CIVIL ENGENEERING CERTIFICATE_compressed.pdf30 Aug 2022
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD LIST.pdf30 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Pdf_992773611070818.pdf30 Aug 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf28 Aug 2022
Declaration about Commencement CertificateFile: Commencement Certificate SNH B Wing_compressed (1).pdf28 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEERING CERTIFICATE.pdf28 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ITR 18-19.pdf28 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ITR-20-21.pdf28 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ITR-20-21.pdf28 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA BANK DETAIL.pdf28 Aug 2022
Layout approvalFile: LAYOUT PLAN.pdf13 Apr 2022
Building plan approvalFile: FLOOR PLAN.pdf13 Apr 2022
Building plan approvalFile: FLOOR PLAN -2.pdf13 Apr 2022
Copy of the legal title reportFile: New Title certificate.pdf13 Apr 2022

How this compares with Thane

97%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 9 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE NIDHI HEIGHTS B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAMDEV PARK7,600+ in Thane

Builder: SHREE NIDHI DEVELOPERS

SHREE NIDHI DEVELOPERS has 2 registrations on MahaRERA, including shree nidhi heights and SHREE NIDHI HEIGHTS B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SHREE NIDHI HEIGHTS B WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE NIDHI HEIGHTS B WING is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE NIDHI HEIGHTS B WING?

The registered promoter entity is SHREE NIDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE NIDHI HEIGHTS B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE NIDHI HEIGHTS B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE NIDHI HEIGHTS B WING?

The professionals named in the filing: Architect: TEJ S CONSULTANT; Architect: TejsConsultant; Engineer: TEJ S CONSULTANT; Engineer: Adarsh Consultant; Chartered Accountant: Ashvin Thumar & Co; Chartered Accountant: Todi Tulsayaan andCo. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE NIDHI HEIGHTS B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE NIDHI HEIGHTS B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE NIDHI HEIGHTS B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.