Home / Browse projects / Pune, Maharashtra / SHREE

Registration lapsed No litigation declared Others project

SHREE

By PRIDE PROPERTIES & INFRASTRUCTURE

RG-MH-22155 · RERA P52100031012 · Last updated on MahaRERA portal: 27 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Basement (if any), 0%
22 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

SHREE is a Others project by PRIDE PROPERTIES & INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100031012 on 29 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 5 of the 27 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE
  • TypeOthers
  • Location
    • AZADNAGAR
    • NEAR GANESH TEMPLE
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031012
  • ReraGenie IDRG-MH-22155

Builder

  • NamePRIDE PROPERTIES & INFRASTRUCTURE
  • Entity typePartnership
  • PartnersPRAVIN KESHAV BADHEKAR, SANDEEP DNYANESHWAR ACHYUT
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects3 →

Key dates

10 months past promisethis monthRegisteredSep 2021First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed139 files

Current status

19%5 of 27 units booked

Figures as on 27 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREENA7719827

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHREE: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered4
Open Space19

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
Declared on14 Nov 2025
LandownerVillageDistrict
PRIDE PROPERTIES & INFRASTRUCTUREKothrudPune
SHREE APARTMENT CONDOMINIUMKothrudPune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI1751.46
Proposed, not sanctioned1,751 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAYUR COLONY KOTHRUD

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBABASAHEB DHAVALEPATIL & ASSOCIATES
EngineerDHAIRYASHIL M KHAIRE
EngineerDipali Amit Kulkarni
Chartered AccountantChandrashekhar Yedgaonkar
Chartered AccountantAST & Co (Ashish Sarda)
Chartered AccountantAshish Sarda
Chartered AccountantAST & CO.
PartnerRole in project
PRIDE PROPERTIES & INFRASTRUCTURE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024838Dec 2024 → Dec 2025

Reason as filed by the promoterThis is to inform you that site work is almost completed. But there were some changes on site, due to which we need to take revise sanction as per actual site conditions, for which we need to apply for RERA Extension. Request you to please grant us extension for our above project for 1 year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: Shree Form 5 - 22-23.pdf27 Mar 2026
Form 5 (FY 2024-2025)File: Shree RERA Form 5 FY 24-25.pdf14 Feb 2026
Form 2A (FY 2025-2026)File: Engineers certificate Form 2A Shree 25-26.pdf19 Jan 2026
Form 1File: Architect certificate Shree Mar-25..pdf28 Nov 2025
Form 2File: Architect certificate Shree Mar-25..pdf28 Nov 2025
Form 3File: Architect certificate Shree Mar-25..pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect certificate Shree Mar-25..pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Dec 2024.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Dec 2024.pdf28 Nov 2025
Form 3File: Shree Form 3 Dec-24.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Dec 24.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree June 2024.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree June 2024.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree June 2024.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Shree June 2024.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Mar 2024.pdf28 Nov 2025
Form 2File: Engineer’s Certificate - Shree Mar 2024.pdf28 Nov 2025
Form 3File: CA Certificate - Shree Mar 2024.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Shree Mar 2024.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Dec 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Dec 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Dec 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Dec 23.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Sep 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Sep 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Sep 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory Sep 23.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Shree Mar 2023.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Jan 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Jan 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Jan 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Shree Jan 2023.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Shree Jun 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Form 1File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 2File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 3File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 1File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 2File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 3File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 1File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 2File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Form 3File: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Engineer’s Certificate - Shree Aug 2021.pdf28 Nov 2025
Building plan approvalFile: SHREE REVISE SANCTION PLAN 1 2.pdf25 Nov 2025
Building plan approvalFile: SHREE REVISE SANCTION PLAN 2 2.pdf25 Nov 2025
Form 1File: Architect’s Certificate - Shree Sep 2024.pdf5 Aug 2025
Form 2File: Engineer’s Certificate - Shree Sep 2024.pdf5 Aug 2025
Form 3File: CA Certificate - Shree Sep 2024.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Sep 24.pdf5 Aug 2025
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf15 Jul 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf15 Jul 2025
Form 2A (FY 2022-2023)File: Form 2 A QAC Shree site 22-23..pdf11 Jul 2025
Form 2A (FY 2021-2022)File: Form 2 A QAC Shree site 21-22..pdf10 Jul 2025
Form 2A (FY 2023-2024)File: Form 2 A QAC Shree site 23-24..pdf10 Jul 2025
Form 2A (FY 2024-2025)File: Form 2 A QAC Shree site 24-25..pdf10 Jul 2025
Declaration about Commencement CertificateFile: Declaration about CC Shree Mar 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Shree Dec-24.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of booked inventory Shree Dec-24.pdf4 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QAC Shree 23-24_Updated.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree RERA Form 3 working up to Sep-24 scan copy.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Shree Sep 24.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Architect certificate Sept-24.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree RERA Form 3 working up to March-24 scan copy.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Shree Mar-24.pdf27 Dec 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NISHIGANDHBHELKE NAGAR4CompletedSep 2017Jun 2017
RUTUGANDHBHELKE NAGAR KOTHRUD4CompletedSep 2016Aug 2016
SAEESHA RESIDENCYBALEWADI PUNE8CompletedOct 2015Late, Nov 2015

How this compares with Pune

19%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR GANESH TEMPLE13,700+ in Pune

2 kmSHREECompleted 93Lapsed / revoked 48Other 200Dot size: filed unitsN

Filed coordinates, straight-line distance. 341 registered projects within 2 km.

Builder: PRIDE PROPERTIES & INFRASTRUCTURE

PRIDE PROPERTIES & INFRASTRUCTURE has 5 registrations on MahaRERA, including SWARGANDH and Swami Samarth. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHREE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE?

The registered promoter entity is PRIDE PROPERTIES & INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE?

The professionals named in the filing: Architect: BABASAHEB DHAVALEPATIL & ASSOCIATES; Engineer: DHAIRYASHIL M KHAIRE; Engineer: Dipali Amit Kulkarni; Chartered Accountant: Chandrashekhar Yedgaonkar; Chartered Accountant: AST & Co (Ashish Sarda); Chartered Accountant: Ashish Sarda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.