Home / Browse projects / Pune, Maharashtra / Shree Mandar C Co-Op Housing Society Ltd.
Shree Mandar C Co-Op Housing Society Ltd.
RG-MH-56265 · RERA P52100053807 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 5 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Mandar C Co-Op Housing Society Ltd. is a Residential / Group Housing project by JD Constructions Unit 1 in Pune, Maharashtra, registered with MahaRERA as P52100053807 on 1 Dec 2023. Possession was promised by 30 May 2026 and is now 5 months past that date. 17 of the 17 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameShree Mandar C Co-Op Housing Society Ltd.
- TypeResidential / Group Housing
- Location
- Sr No 88
- CTS No. 1314
- Hissa No. 3
- Plot No. 29
- Parvati
- Pune- 411009.
- Parvati
- Haveli
- Pune
- 411009
- Pincode411009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053807
- ReraGenie IDRG-MH-56265
Builder
- NameJD Constructions Unit 1
- Entity typePartnership
- PartnersAnand Jayant Date, Jayant Yashwant Date, Abhishek Jayant Date, Sunita Jayant Date
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Dec 2023
- Promised completion30 May 2026
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 25 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Mandar C Co Op Housing Society Ltd | NA | 7 | 6 | 17 | 0 | 17 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Shree Mandar C Co Op Housing Society Ltd: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership17
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mr. Sunil Madhukar Paranjape | Parvati | Pune |
| Mr. Vinay Heramb Waranashiwar | Parvati | Pune |
| Mr. Hemant Balkrushna Gole | Parvati | Pune |
| Mr. Irawati Hemant Gole | Parvati | Pune |
| Mrs. Vinaya Vardaraj Chipalkatti | Parvati | Pune |
| Mr. Purushottam Varadraj Chipalkatti | Parvati | Pune |
| Mr. Atul Varadraj Chipalkatti | Parvati | Pune |
| Mr. Amey Vinay Waranashiwar | Parvati | Pune |
| Mr. Shirish Rajaram Kulkarni | Parvati | Pune |
| Mrs. Anuradha Shirish Kulkarni | Parvati | Pune |
| Mr. Parag Sunil Paranjpe | Parvati | Pune |
| Mrs. Pallavi Aseem Abhyankar | Parvati | Pune |
| Mrs. Nisha vinay joshi | Parvati | Pune |
| Mrs. Isha Smith, | Parvati | Pune |
| Sunil Madhukar Paranjape | Parvati | Pune |
| Vinay Heramb Waranashiwar | Parvati | Pune |
| Shree Mandar C Co-Op Housing Society Ltd. | Parvati | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shree Mandar C Co Op Housing Society Ltd | NA | Rs 7.71 cr | Rs 7.71 cr |
| - | NA | Rs 49.20 lakh | Rs 49.20 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Plan Arena Architectural Solutions Pune |
| Architect | Ranjit Garad |
| Engineer | Rohinee Engineers |
| Engineer | Mr Anand Date |
| Chartered Accountant | RG Tanksale and Company |
| Chartered Accountant | Ankur Yogendra Vakharia |
| Partner | Role in project |
|---|---|
| JD Constructions Unit 1 | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2026-2027)File: Final RERA consent.pdf | 25 May 2026 |
| Layout approvalFile: Plan.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: WU FINAL F1 (1).pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Form 3 Mandar.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Shri mandar Form 1.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Shri mandar.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Shri mandar.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Shri mandar Form 1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Shri mandar.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Shri mandar.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: Shri mandar Form 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Shri mandar.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Shri mandar.pdf | 24 Feb 2026 |
| Form 5 (FY 2023-2024)File: 23-24 form 5 rera (1) (1).pdf | 19 Dec 2025 |
| Form 1File: Form 1.pdf | 18 Nov 2025 |
| Form 2File: Form 2 s.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Sep 2025 s.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold s.pdf | 18 Nov 2025 |
| Form 1File: Form 1 Dec 2023 s.pdf | 18 Nov 2025 |
| Form 2File: Form 2 s.pdf | 18 Nov 2025 |
| Form 3File: Dec 2023 Form 3 s.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 23.pdf | 18 Nov 2025 |
| Form 2A (FY 2025-2026)File: Sup Cert.pdf | 18 Nov 2025 |
| Form 5 (FY 2024-2025)File: Shri Mandar C - Form 5 for 2024-25.pdf | 18 Nov 2025 |
| Form 1File: Form 1 Jun 2025 s.pdf | 25 Jul 2025 |
| Form 2File: Form 2 Jun 2025.pdf | 25 Jul 2025 |
| Form 3File: Form 3 Jun 2025.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Jun 2025.pdf | 25 Jul 2025 |
| Form 2A (FY 2023-2024)File: 2023 2A.pdf | 3 Jul 2025 |
| Form 2A (FY 2024-2025)File: 2A 2024.pdf | 3 Jul 2025 |
| Form 1File: March 2024 Form 1.pdf | 30 Jun 2025 |
| Form 2File: Mar 2024 Form 2.pdf | 30 Jun 2025 |
| Form 3File: March 2024 Form 3.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf | 30 Jun 2025 |
| Form 1File: Jun 2024 Form 1.pdf | 30 Jun 2025 |
| Form 2File: jun 2024 Form 2.pdf | 30 Jun 2025 |
| Form 3File: Jun 2024 Form 3.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf | 30 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: All Quarterly Declarations-4.pdf | 30 Jun 2025 |
| Form 1File: Sep 2024 Form 1.pdf | 30 Jun 2025 |
| Form 2File: SHREE MANDAR OCT 24.pdf | 30 Jun 2025 |
| Form 3File: Sep 2024 Form 3.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf | 30 Jun 2025 |
| Form 1File: Dec 2024 Form 1.pdf | 30 Jun 2025 |
| Form 2File: Dec 2024 Form 2.pdf | 30 Jun 2025 |
| Form 3File: Dec 2024 Form 3_compressed.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2024-3 Sold Unsold.pdf | 30 Jun 2025 |
| Form 1File: March 2025 Form 1.pdf | 30 Jun 2025 |
| Form 2File: SHREE MANDAR March 25.pdf | 30 Jun 2025 |
| Form 3File: March 2025 Form 3.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2025 Sold Unsold.pdf | 30 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera Audit Dec 2024_compressed.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Audit Sept 2024.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_11zon (5).pdf | 26 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera Audit Sept 2024_11zon.pdf | 22 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: signed f2a.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: signed sold unsold.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1_11zon.pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree mandar c F2_11zon.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3_11zon.pdf | 25 Jul 2024 |
| Layout approvalFile: Layout_11zon.pdf | 8 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Layout_11zon.pdf | 8 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 22 Apr 2024 |
| Other - LegalFile: Society Declaration.pdf | 27 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annuxure Abhishek.pdf | 5 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200279397839_For_Asset_Based_Search_04_09_2023_17_04_45_315 (1).pdf | 4 Sep 2023 |
| Proforma of Allotment letterFile: Model Allotment Letter Mandar C_compressed.pdf | 4 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: mandar bank (1).pdf | 4 Sep 2023 |
| Declaration in FORM BFile: Declaration Promoter_compressed.pdf | 1 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 Aug 23.pdf | 1 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-1.pdf | 1 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-2.pdf | 1 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-3.pdf | 1 Sep 2023 |
| Proforma of Agreement for saleFile: Mandar C Agreement Edited as Per RERA.pdf | 1 Sep 2023 |
| Building plan approvalFile: Mandar - C- IOD Format for Rera.pdf | 29 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Mandar C Co-Op Housing Society Ltd. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Parvati13,700+ in Pune
Filed coordinates, straight-line distance. 203 registered projects within 2 km.
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: JD Constructions Unit 1
JD Constructions Unit 1 has 1 registration on MahaRERA, including Shree Mandar C Co-Op Housing Society Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Shree Mandar C Co-Op Housing Society Ltd. shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Shree Mandar C Co-Op Housing Society Ltd. is delayed beyond 30 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Mandar C Co-Op Housing Society Ltd.?
The registered promoter entity is JD Constructions Unit 1, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Mandar C Co-Op Housing Society Ltd.?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Mandar C Co-Op Housing Society Ltd.?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Mandar C Co-Op Housing Society Ltd.?
The professionals named in the filing: Architect: Plan Arena Architectural Solutions Pune; Architect: Ranjit Garad; Engineer: Rohinee Engineers; Engineer: Mr Anand Date; Chartered Accountant: RG Tanksale and Company; Chartered Accountant: Ankur Yogendra Vakharia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Mandar C Co-Op Housing Society Ltd.?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback