Registration lapsed No litigation declared Residential / Group Housing project

Shree Mandar C Co-Op Housing Society Ltd.

By JD Constructions Unit 1

RG-MH-56265 · RERA P52100053807 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Shree Mandar C Co-Op Housing Society Ltd. is a Residential / Group Housing project by JD Constructions Unit 1 in Pune, Maharashtra, registered with MahaRERA as P52100053807 on 1 Dec 2023. Possession was promised by 30 May 2026 and is now 5 months past that date. 17 of the 17 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Mandar C Co-Op Housing Society Ltd.
  • TypeResidential / Group Housing
  • Location
    • Sr No 88
    • CTS No. 1314
    • Hissa No. 3
    • Plot No. 29
    • Parvati
    • Pune- 411009.
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053807
  • ReraGenie IDRG-MH-56265

Builder

  • NameJD Constructions Unit 1
  • Entity typePartnership
  • PartnersAnand Jayant Date, Jayant Yashwant Date, Abhishek Jayant Date, Sunita Jayant Date

Key dates

5 months past promisethis monthRegisteredDec 2023PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Dec 2023
  • Promised completion30 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

100%17 of 17 units booked
100.0%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Mandar C Co Op Housing Society LtdNA7617017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Shree Mandar C Co Op Housing Society Ltd: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership17

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area510 sq m
Land owned byNot the promoter
Named landowners17
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Mr. Sunil Madhukar ParanjapeParvatiPune
Mr. Vinay Heramb WaranashiwarParvatiPune
Mr. Hemant Balkrushna GoleParvatiPune
Mr. Irawati Hemant GoleParvatiPune
Mrs. Vinaya Vardaraj ChipalkattiParvatiPune
Mr. Purushottam Varadraj ChipalkattiParvatiPune
Mr. Atul Varadraj ChipalkattiParvatiPune
Mr. Amey Vinay WaranashiwarParvatiPune
Mr. Shirish Rajaram KulkarniParvatiPune
Mrs. Anuradha Shirish KulkarniParvatiPune
Mr. Parag Sunil ParanjpeParvatiPune
Mrs. Pallavi Aseem AbhyankarParvatiPune
Mrs. Nisha vinay joshiParvatiPune
Mrs. Isha Smith,ParvatiPune
Sunil Madhukar ParanjapeParvatiPune
Vinay Heramb WaranashiwarParvatiPune
Shree Mandar C Co-Op Housing Society Ltd.ParvatiPune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI1632.0
Proposed, not sanctioned1,632 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwargate, Pune
Estimated costRs 8.20 cr
Cost incurredRs 8.20 cr
Work done100.0%
BuildingWingEstimatedIncurred
Shree Mandar C Co Op Housing Society LtdNARs 7.71 crRs 7.71 cr
-NARs 49.20 lakhRs 49.20 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPlan Arena Architectural Solutions Pune
ArchitectRanjit Garad
EngineerRohinee Engineers
EngineerMr Anand Date
Chartered AccountantRG Tanksale and Company
Chartered AccountantAnkur Yogendra Vakharia
PartnerRole in project
JD Constructions Unit 1-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2026-2027)File: Final RERA consent.pdf25 May 2026
Layout approvalFile: Plan.pdf19 May 2026
Withdrawal Update Form 1File: WU FINAL F1 (1).pdf13 May 2026
Withdrawal Update Form 2File: Form 2.pdf13 May 2026
Withdrawal Update Form 3File: Form 3 Mandar.pdf13 May 2026
Withdrawal Update Form 1File: Shri mandar Form 1.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Shri mandar.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 Shri mandar.pdf31 Mar 2026
Withdrawal Update Form 1File: Shri mandar Form 1.pdf30 Mar 2026
Withdrawal Update Form 2File: Form 2 Shri mandar.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 Shri mandar.pdf30 Mar 2026
Withdrawal Update Form 1File: Shri mandar Form 1.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 Shri mandar.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 Shri mandar.pdf24 Feb 2026
Form 5 (FY 2023-2024)File: 23-24 form 5 rera (1) (1).pdf19 Dec 2025
Form 1File: Form 1.pdf18 Nov 2025
Form 2File: Form 2 s.pdf18 Nov 2025
Form 3File: Form 3 Sep 2025 s.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold s.pdf18 Nov 2025
Form 1File: Form 1 Dec 2023 s.pdf18 Nov 2025
Form 2File: Form 2 s.pdf18 Nov 2025
Form 3File: Dec 2023 Form 3 s.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 23.pdf18 Nov 2025
Form 2A (FY 2025-2026)File: Sup Cert.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Shri Mandar C - Form 5 for 2024-25.pdf18 Nov 2025
Form 1File: Form 1 Jun 2025 s.pdf25 Jul 2025
Form 2File: Form 2 Jun 2025.pdf25 Jul 2025
Form 3File: Form 3 Jun 2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Jun 2025.pdf25 Jul 2025
Form 2A (FY 2023-2024)File: 2023 2A.pdf3 Jul 2025
Form 2A (FY 2024-2025)File: 2A 2024.pdf3 Jul 2025
Form 1File: March 2024 Form 1.pdf30 Jun 2025
Form 2File: Mar 2024 Form 2.pdf30 Jun 2025
Form 3File: March 2024 Form 3.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf30 Jun 2025
Form 1File: Jun 2024 Form 1.pdf30 Jun 2025
Form 2File: jun 2024 Form 2.pdf30 Jun 2025
Form 3File: Jun 2024 Form 3.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: All Quarterly Declarations-4.pdf30 Jun 2025
Form 1File: Sep 2024 Form 1.pdf30 Jun 2025
Form 2File: SHREE MANDAR OCT 24.pdf30 Jun 2025
Form 3File: Sep 2024 Form 3.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf30 Jun 2025
Form 1File: Dec 2024 Form 1.pdf30 Jun 2025
Form 2File: Dec 2024 Form 2.pdf30 Jun 2025
Form 3File: Dec 2024 Form 3_compressed.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Dec 2024-3 Sold Unsold.pdf30 Jun 2025
Form 1File: March 2025 Form 1.pdf30 Jun 2025
Form 2File: SHREE MANDAR March 25.pdf30 Jun 2025
Form 3File: March 2025 Form 3.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2025 Sold Unsold.pdf30 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera Audit Dec 2024_compressed.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Audit Sept 2024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_11zon (5).pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera Audit Sept 2024_11zon.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: signed f2a.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: signed sold unsold.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1_11zon.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree mandar c F2_11zon.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3_11zon.pdf25 Jul 2024
Layout approvalFile: Layout_11zon.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout_11zon.pdf8 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf22 Apr 2024
Other - LegalFile: Society Declaration.pdf27 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annuxure Abhishek.pdf5 Sep 2023
CERSAI detailsFile: CERSAI_Search_Report_200279397839_For_Asset_Based_Search_04_09_2023_17_04_45_315 (1).pdf4 Sep 2023
Proforma of Allotment letterFile: Model Allotment Letter Mandar C_compressed.pdf4 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: mandar bank (1).pdf4 Sep 2023
Declaration in FORM BFile: Declaration Promoter_compressed.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 Aug 23.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-1.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-2.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-3.pdf1 Sep 2023
Proforma of Agreement for saleFile: Mandar C Agreement Edited as Per RERA.pdf1 Sep 2023
Building plan approvalFile: Mandar - C- IOD Format for Rera.pdf29 Aug 2023

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Mandar C Co-Op Housing Society Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parvati13,700+ in Pune

2 kmShree Mandar C Co-Op HouCompleted 61Lapsed / revoked 32Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: JD Constructions Unit 1

JD Constructions Unit 1 has 1 registration on MahaRERA, including Shree Mandar C Co-Op Housing Society Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Shree Mandar C Co-Op Housing Society Ltd. shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Shree Mandar C Co-Op Housing Society Ltd. is delayed beyond 30 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Mandar C Co-Op Housing Society Ltd.?

The registered promoter entity is JD Constructions Unit 1, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Mandar C Co-Op Housing Society Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Mandar C Co-Op Housing Society Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Mandar C Co-Op Housing Society Ltd.?

The professionals named in the filing: Architect: Plan Arena Architectural Solutions Pune; Architect: Ranjit Garad; Engineer: Rohinee Engineers; Engineer: Mr Anand Date; Chartered Accountant: RG Tanksale and Company; Chartered Accountant: Ankur Yogendra Vakharia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Mandar C Co-Op Housing Society Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Mandar C Co-Op Housing Society Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Mandar C Co-Op Housing Society Ltd. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.