Home / Browse projects / Pune, Maharashtra / SHREE MADHAVAASHRAM APARTMENT
SHREE MADHAVAASHRAM APARTMENT
RG-MH-16513 · RERA P52100026309 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 67 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE MADHAVAASHRAM APARTMENT is a Residential / Group Housing project by SHREE GAJANAN DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100026309 on 7 Sep 2020. Possession was promised by 31 Mar 2021 and is now 67 months past that date.
At a glance
Project
- NameSHREE MADHAVAASHRAM APARTMENT
- TypeResidential / Group Housing
- Location
- PAN CARD CLUB ROAD
- DHANKUDE WASTI BANER
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- RERA no.P52100026309
- ReraGenie IDRG-MH-16513
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Sep 2020
- Promised completion31 Mar 2021
- Revised completionNone
- Buildings2 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE MADHAVAASHRAM APARTMENT | NA | 4 | 0 | 0 | 0 | 0 |
| SHREE MADHAVAASHRAM APARTMENT | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
SHREE MADHAVAASHRAM APARTMENT82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SHREE MADHAVAASHRAM APARTMENT82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RATNAKAR SHANKARRAO PASARKAR | Pune (M Corp.) | Pune |
| RAHUL RATNAKAR PASARKAR | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAY AERAM AND ASSOCIATES |
| Engineer | SONAJI SABLE |
| Chartered Accountant | DATTATRAYA SURESHRAO KUSUMKAR |
| Partner | Role in project |
|---|---|
| SHREE GAJANAN DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Feb 2023
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1-Shree Gajanan Developers Mar21 final.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Mar 21.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE -Jun 21.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Sep 21.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Dec 21.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE -Mar 22.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Jun 22.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE-Mar 21.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE-Jun 21.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE- Sep 21.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE-Dec 21.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE-Mar 22.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE-Jun 22.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1-Shree Gajanan Developers Mar21 final.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2-Shree Gajanan Developers Jun 21 final.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-Shree Gajanan Developers Sep21 final.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4-Shree Gajanan Developers Dec21 final.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5-Shree Gajanan Developers Mar22 final.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6-Shree Gajanan Developers Jun22 final.pdf | 28 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RA Report- Final.pdf | 26 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 3 Disclosure of sold_ booked inventory (1).pdf | 19 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate_page-0001.pdf | 15 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_page-0001.pdf | 15 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- (20-21).pdf | 15 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- (21-22).pdf | 15 May 2023 |
| Disclosure of sold/ booked inventoryFile: 2 Disclosure of sold_ booked inventory_page-0001.pdf | 15 May 2023 |
| Declaration about Commencement CertificateFile: Form D-Madhav Ashram Apartment_1 (2 files merged).pdf | 7 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Madhav Ashram Apartment_1 (2 files merged).pdf | 7 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 7 Feb 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 24 Nov 2022 |
| CERSAI detailsFile: CERSAI details.pdf | 24 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Booked.pdf | 24 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit report 20-21_signed.pdf | 24 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit report 21-22_signed.pdf | 24 Nov 2022 |
| Declaration about Commencement CertificateFile: Form-D.pdf | 18 Aug 2022 |
| Details of encumbrancesFile: encumbrance 31-Aug-2020 23-31-36.pdf | 31 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERFICATE_compressed.pdf | 31 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: gajanan developers Form 3 31-Aug-2020 22-38-06_compressed(1).pdf | 31 Aug 2020 |
| Layout approvalFile: LAYOUT.pdf | 21 Aug 2020 |
| Building plan approvalFile: PROJECT PLAN_compressed 517.pdf | 21 Aug 2020 |
| Building plan approvalFile: N A ORDER.pdf | 21 Aug 2020 |
| PAN CardFile: Firm Pan.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Search Report_compressed(1).pdf | 21 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 21 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PROJECT PLAN_compressed 517.pdf | 21 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: N A ORDER.pdf | 21 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order COMMENCEMENT_compressed.pdf | 21 Aug 2020 |
| Declaration in FORM BFile: Form B- Gajanan Developers_compressed.pdf | 21 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARTICHECT CERTIFICATE_compressed.pdf | 21 Aug 2020 |
| Proforma of Allotment letterFile: Allotment letter final.pdf | 21 Aug 2020 |
| Proforma of Allotment letterFile: Agreement_Draft.pdf | 21 Aug 2020 |
| OtherFile: pan adhar.pdf | 21 Aug 2020 |
| OtherFile: Partnership_Deed.pdf | 21 Aug 2020 |
| OtherFile: GST Certificate.pdf | 21 Aug 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHREE MADHAVAASHRAM APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANKUDE WASTI BANER13,700+ in Pune
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: SHREE GAJANAN DEVELOPERS
SHREE GAJANAN DEVELOPERS has 9 registrations on MahaRERA, including SIDDHIVINAYAK and SHREE GANPATI RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SHREE MADHAVAASHRAM APARTMENT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREE MADHAVAASHRAM APARTMENT is delayed beyond 31 Mar 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE MADHAVAASHRAM APARTMENT?
The registered promoter entity is SHREE GAJANAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE MADHAVAASHRAM APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE MADHAVAASHRAM APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE MADHAVAASHRAM APARTMENT?
The professionals named in the filing: Architect: JAY AERAM AND ASSOCIATES; Engineer: SONAJI SABLE; Chartered Accountant: DATTATRAYA SURESHRAO KUSUMKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE MADHAVAASHRAM APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback