Home / Browse projects / Nagpur, Maharashtra / SHREE LAXMI ESTATE-1
SHREE LAXMI ESTATE-1
By SHREE LAXMI VENTURE PVT LTD
RG-MH-91845 · RERA P50500021396 · Last updated on MahaRERA portal: 1 Jul 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE LAXMI ESTATE-1 is a Residential / Group Housing project by SHREE LAXMI VENTURE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500021396 on 26 Jun 2019. The registration is recorded completed; possession was promised by 30 Mar 2023.
At a glance
Project
- NameSHREE LAXMI ESTATE-1
- TypeResidential / Group Housing
- Location
- PIPLA KHARSOLI ROAD
- PIPLA BESA
- Nagpur (Rural)
- Nagpur
- 440023
- Pincode440023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500021396
- ReraGenie IDRG-MH-91845
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jun 2019
- Promised completion30 Mar 2023
- Revised completionNone
- Buildings12 building records
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE 1 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 2 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 3 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 4 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 5 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 6 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 7 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 8 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 9 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 10 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 11 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 12 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building12
As on 1 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
104 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Podiums (if any), at 0%.
ROW HOUSE 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 245%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE 382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 1082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE 1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 30% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| ROW HOUSE 1 | 1 | 1 |
| ROW HOUSE 2 | 1 | 1 |
| ROW HOUSE 3 | 1 | 1 |
| ROW HOUSE 4 | 1 | 1 |
| ROW HOUSE 5 | 1 | 1 |
| ROW HOUSE 6 | 1 | 1 |
| ROW HOUSE 7 | 1 | 1 |
| ROW HOUSE 8 | 1 | 1 |
| ROW HOUSE 9 | 1 | 1 |
| ROW HOUSE 10 | 1 | 1 |
| ROW HOUSE 11 | 1 | 1 |
| ROW HOUSE 12 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANJALI KADAM WAVE DESIGNIERS AND PLANNERS |
| Chartered Accountant | RENU ANAND KEWALRAMANI |
| Partner | Role in project |
|---|---|
| SHREE LAXMI VENTURE PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Mar 2022
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No5 2022-23.pdf | 1 Jul 2023 |
| Certificates of CA (Form 3)File: CA JUNE 22.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Estate 1 Form 5.pdf | 28 Dec 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE.pdf | 28 Dec 2022 |
| Certificates of CA (Form 3)File: ca cer 2122.pdf | 11 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ca cer 2122.pdf | 11 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHEST1MARCH2022-compressed.pdf | 15 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 EST1MARCH2022-compressed.pdf | 15 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2AEST1MARCH2022-compressed.pdf | 15 Apr 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: estate1 archi completion.pdf | 12 Apr 2022 |
| Certificates of CA (Form 3)File: Estate 1 q2 (2)_.pdf | 17 Mar 2022 |
| Certificates of CA (Form 3)File: Estate 1 q3 (2).pdf | 17 Mar 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy.PDF | 17 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: estate1 archi.pdf | 15 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 estate1.pdf | 15 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A estate1.pdf | 15 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ESTATE 1.pdf | 15 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect (Estate-I).PDF | 14 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Farm-2 (Estate-I).PDF | 14 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A(Estate-1).PDF | 14 Oct 2021 |
| Certificates of CA (Form 3)File: im21.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: ij21.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate-I, March-2020.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate-I, June-2020.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate II, March-2021.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate-I, June-2021.pdf | 13 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch mar21.pdf | 20 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch june21.pdf | 20 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng mar21C.pdf | 20 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng june21C.pdf | 20 Jul 2021 |
| Details of Restarting of Construction work post lockdownFile: Discolsure of sold booked inventory.pdf | 20 May 2021 |
| OtherFile: Discolsure of sold booked inventory.pdf | 20 May 2021 |
| Certificates of CA (Form 3)File: form3es1.pdf | 19 Mar 2021 |
| Certificates of CA (Form 3)File: form3es1 (2).pdf | 19 Mar 2021 |
| Certificates of CA (Form 3)File: form3 es1.pdf | 19 Mar 2021 |
| Certificates of CA (Form 3)File: form3 es1 (2).pdf | 19 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form51 es1.pdf | 19 Mar 2021 |
| Certificates of CA (Form 3)File: CA DEC 19.pdf | 5 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESTATE1 ARCH SEP20.pdf | 26 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESTATE1 ENG SEP20.pdf | 26 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2a est1.pdf | 26 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan1_compressed.pdf | 30 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer MARCH20.pdf | 30 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG JUNE20.pdf | 30 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMG-20200729-WA0005-converted.pdf | 29 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shree laxmi estate arch dec19.pdf | 31 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sheee Laxmi Estate engi dec19.pdf | 31 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sheee Laxmi Estate-1SEP192A.pdf | 31 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sheee Laxmi Estate-1SEP192A.pdf | 31 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sheee Laxmi Estate-1 SEP192A.pdf | 31 Jan 2020 |
| Certificates of CA (Form 3)File: Estate - I.pdf | 25 Dec 2019 |
| OtherFile: CREDAI MEMBERSHIP.pdf | 22 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2019-10-19 architect.pdf | 19 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 2019-10-19 engineers.pdf | 19 Oct 2019 |
| Building plan approvalFile: layout plan building.pdf | 18 Jun 2019 |
| Building plan approvalFile: row house.pdf | 18 Jun 2019 |
| Building plan approvalFile: row house (2).pdf | 18 Jun 2019 |
| Layout approvalFile: layout plan.pdf | 18 Jun 2019 |
| PAN CardFile: Pan Card Shree Laxmi Venture pvt ltd.pdf | 18 Jun 2019 |
| Copy of the legal title reportFile: AD NO ENCUMBRANCE.pdf | 18 Jun 2019 |
| Details of encumbrancesFile: NO ENCUMBRANCE ESTATE 1.pdf | 18 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 18 Jun 2019 |
| Building Plan Approval (IOD)File: layout plan building.pdf | 18 Jun 2019 |
| Building Plan Approval (IOD)File: row house.pdf | 18 Jun 2019 |
| Building Plan Approval (IOD)File: row house (2).pdf | 18 Jun 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Building permit commencement certificate.pdf | 18 Jun 2019 |
| Declaration in FORM BFile: NO ENCUMBRANCE ESTATE 1.pdf | 18 Jun 2019 |
| Declaration in FORM BFile: No Encu verification_1.pdf | 18 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 1.pdf | 18 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Estate-1 Engineers Certificate.pdf | 18 Jun 2019 |
| Certificates of CA (Form 3)File: shree_laxmi ca1.pdf | 18 Jun 2019 |
| Proforma of Allotment letterFile: Estate -1 Allotment Letter.pdf | 18 Jun 2019 |
| Proforma of Allotment letterFile: Decleration Agreement To sale New Doc 2019-06-18 (1).pdf | 18 Jun 2019 |
| OtherFile: power.pdf | 18 Jun 2019 |
| OtherFile: Estate 1Self- Decleration.pdf | 18 Jun 2019 |
| OtherFile: NO ENCUMBRANCE.pdf | 18 Jun 2019 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE LAXMI | JAI DURGA SOCIETY NO.3 PLOT NO 68 69 MANISH NAGAR NAGPUR-440015 | 8 | Completed | Feb 2016 | Feb 2016 |
| SHREE LAXMI 2 | Plot No 35 B G S N SOCIETY | 4 | Completed | Nov 2014 | Nov 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
Keep SHREE LAXMI ESTATE-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIPLA BESA2,800+ in Nagpur
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: SHREE LAXMI VENTURE PVT LTD
SHREE LAXMI VENTURE PVT LTD has 5 registrations on MahaRERA, including SHREE NARAYANA CLASSIC and SHREE LAXMI MILESTONE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SHREE LAXMI ESTATE-1 is delayed beyond 30 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE LAXMI ESTATE-1?
The registered promoter entity is SHREE LAXMI VENTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE LAXMI ESTATE-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE LAXMI ESTATE-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE LAXMI ESTATE-1?
The professionals named in the filing: Architect: ANJALI KADAM WAVE DESIGNIERS AND PLANNERS; Chartered Accountant: RENU ANAND KEWALRAMANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE LAXMI ESTATE-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback