Red flags

  • Possession 1 months past the filed date
  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Internal walls, 90%
24 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

SHREE KRUPA CO OP HOUSING SOCIETY is a Others project by SHARDA VASTU NIRMITEE PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700051756 on 27 Jun 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 13 of the 37 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE KRUPA CO OP HOUSING SOCIETY
  • TypeOthers
  • Location
    • PANCHPAKHADI
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • RERA no.P51700051756
  • ReraGenie IDRG-MH-05468

Builder

  • NameSHARDA VASTU NIRMITEE PVT. LTD.
  • Entity typeCompany
  • CINU45400MH2010PTC209309
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsANKIT HEMENDRA SHAH, MAHESH MAVJI SHARDA
  • Managing DirectorHEMENDRA MAVJI SHAH
  • Other registrations5 more →
  • Completed4 of 6
  • Past their filed date1
  • Declared earlier projects3 →

Key dates

1 months past promisethis monthRegisteredJun 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed129 files

Current status

35%13 of 37 units booked
93.2%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE KRUPA CO OP HOUSING SOCIETYNA1410261137

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SHREE KRUPA CO OP HOUSING SOCIETY: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes60%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered37
Open Space41

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area789 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2025
LandownerVillageDistrict
SHREE KRUPA CHS LTDThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI3386.91
Proposed, not sanctioned2,753 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3,4,5,6,7, MORESHWAR PLAZA, PLOT NO 19, SECTOR 29, NERUL, NAVI MUMBAI 400706
Estimated costRs 15.00 cr
Cost incurredRs 13.97 cr
Work done93.15%
BuildingWingEstimatedIncurred
SHREE KRUPA CO OP HOUSING SOCIETYNARs 13.65 crRs 13.22 cr
-NARs 1.35 crRs 75.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10 FOLDS
EngineerEPICONS CONSULTANTS PVT LTD
EngineerGanesh Chaudhary
Chartered AccountantA K O R D & CO
Chartered AccountantRoshan Gawde & Co
PartnerRole in project
SHARDA VASTU NIRMITEE PVT. LTD.-

Litigation declared1

CaseCourtStatus
SPL C S /35/2023/2023Civil Court (Senior Divison) ThaneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SK - ANNEXURE A FORM 2A - QUALITY ASSURANCE CERTIFICATE.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4 Shree Krupa .pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2 Shree Krupa Q4 .pdf2 Jun 2026
Withdrawal Update Form 3File: Form 3 shree Krupa Q4 .pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 Final SK Q3.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3 SK.pdf6 Feb 2026
Withdrawal Update Form 3File: SKFORM 3 CA CERTIFICATE Q3.pdf6 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 - SK 24-25.pdf7 Jan 2026
Withdrawal Update Form 1File: FORM 1 - 10 FOLDS - - ANNEXURE A.pdf13 Dec 2025
Withdrawal Update Form 2File: FORM 2 - EPICONS - SK - ANNEXURE B.pdf13 Dec 2025
Withdrawal Update Form 3File: FORM 3 - SK.pdf13 Dec 2025
Form 1File: FORM 1_Q4.pdf22 Aug 2025
Form 2File: Form 2 - Shree Krupa CHS, Thane.pdf22 Aug 2025
Form 3File: FORM 3 - Shree Krupa CHS_compressed change.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf22 Aug 2025
Withdrawal Update Form 1File: FORM 1 - 30-06-25 - 10 FOLDS.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2 - Shree Krupa CHS.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 SK.pdf21 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A -SK.pdf30 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Krupa CHS, Thane.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Q4.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Shree Krupa CHS_compressed.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q3.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3_Fy_2024-25_Shree Krupa.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Revised Annexure B-Disclosure of Sold or Unsold Inventory.pdf22 Jan 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf18 Jan 2025
Layout approvalFile: Merged plan.pdf17 Jan 2025
Copy of Layout Approval (in case of layout)File: Merged plan.pdf17 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC - 18-10-2024.pdf17 Jan 2025
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance and Legal-Q3-24-25.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Q3.pdf13 Jan 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf13 Jan 2025
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf13 Jan 2025
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance and Legal-Q3-24-25.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5_FY 23-24 _SK.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Q2.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q2.pdf5 Nov 2024
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance Legal-Q2-24-25.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf29 Oct 2024
CERSAI detailsFile: Annexure G-Asset Based Declaration (1).pdf29 Oct 2024
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf29 Oct 2024
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance Legal-Q2-24-25.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q1.pdf25 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - SKRUPA.PDF25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_Q1_FY 24-25_Shree Krupa CHS Ltd_compressed.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Q1.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory (5).pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf24 Jul 2024
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance .pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance .pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q4.pdf20 Jul 2024
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf20 Jul 2024
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_Q4_Shree Krupa Chs.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: 3 - Annexure K-Non-Encumbrance Concerned to Finance -Q3.pdf22 Apr 2024
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf22 Apr 2024
Details of encumbrances concerned to LegalFile: 3 - Annexure K-Non-Encumbrance Concerned to Finance -Q3.pdf22 Apr 2024
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf22 Apr 2024
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf22 Apr 2024
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Q2.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -Q3.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SHREEKRUPA_SIGNED.pdf5 Mar 2024
Details of encumbrances concerned to FinanceFile: finance.pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: finance.pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: Annexure K- Non encumbrance Concern to legal.pdf15 Jan 2024
Details of encumbrances concerned to FinanceFile: 3 - Annexure K-Non-Encumbrance Concerned to Finance -Q3.pdf15 Jan 2024
Details of encumbrances concerned to LegalFile: Annexure K- Non encumbrance Concern to legal.pdf15 Jan 2024
Details of encumbrances concerned to LegalFile: 3 - Annexure K-Non-Encumbrance Concerned to Finance -Q3.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SKRUPA.pdf15 Jan 2024
CERSAI detailsFile: 1 - Annexure L- Debtor Based Declaration.pdf15 Jan 2024
CERSAI detailsFile: 2 - Annexure G-Asset Based Declaration.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2-Shree Krupa CHS.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SKRUPA.pdf25 Oct 2023
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf21 Oct 2023
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf21 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
JEEVAN CHS LTDRAVI COMPOUND PANCHPAKHADI41CompletedOct 2022Late, Jan 2023
MAITHILI CHS LTDRAVI COMPOUND PANCHPAKHADI THANE26CompletedMar 2019Feb 2019
GANESH KRIPANEAR GURUKUL SOCIETY PANCHPAKHADI THANE WEST17CompletedAug 2016May 2016

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE KRUPA CO OP HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANCHPAKHADI7,600+ in Thane

Builder: SHARDA VASTU NIRMITEE PVT. LTD.

SHARDA VASTU NIRMITEE PVT. LTD. has 6 registrations on MahaRERA, including Maithili and JEEVAN CHS LTD. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE KRUPA CO OP HOUSING SOCIETY is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE KRUPA CO OP HOUSING SOCIETY?

The registered promoter entity is SHARDA VASTU NIRMITEE PVT. LTD., a company as per the filing. Its CIN U45400MH2010PTC209309 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE KRUPA CO OP HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE KRUPA CO OP HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE KRUPA CO OP HOUSING SOCIETY?

The professionals named in the filing: Architect: 10 FOLDS; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: Ganesh Chaudhary; Chartered Accountant: A K O R D & CO; Chartered Accountant: Roshan Gawde & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE KRUPA CO OP HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE KRUPA CO OP HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE KRUPA CO OP HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.