SHREE KRISHNA WING A and B
RG-MH-39260 · RERA P51800045520 · Last updated on MahaRERA portal: 4 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE KRISHNA WING A and B is a Residential / Group Housing project by Shreem Properties in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045520 on 24 May 2022. Possession is promised by 31 Mar 2027. 103 of the 165 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREE KRISHNA WING A and B
- TypeResidential / Group Housing
- Location
- Aarey Road
- Powai
- Kurla
- Mumbai Suburban
- 400087
- Pincode400087
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800045520
- ReraGenie IDRG-MH-39260
Builder
- NameShreem Properties
- Entity typeOthers
- GSTIN27ABQFS5367K1ZB
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersMahender Arjan Dhanani, Arun Anand Sarup, Arjun Arun Sarup, Geeta Arun Sarup
- PartnerNarendra ARJAN DHANANI
- Named personAmartara Pvt. Ltd.
- Other registrations2 more →
- Completed1 of 3
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 May 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings2 building records
- Documents filed110 files
Current status
Figures as on 4 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 23 | 20 | 80 | 5 | 85 |
| Wing B | NA | 23 | 20 | 80 | 0 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 27%.
Wing A69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 27% |
| Sanitary Fittings within the flats / premises | 8% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 27% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
Wing B69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 27% |
| Sanitary Fittings within the flats / premises | 8% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 27% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Wing A | 32 | 32 |
| Wing B | 33 | 33 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 31.97 cr | Rs 21.24 cr |
| Wing B | NA | Rs 31.17 cr | Rs 20.31 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Daisaria Associates |
| Engineer | Mahimtura Consultants Pvt Ltd |
| Engineer | Milind Thakur |
| Chartered Accountant | Bhupendra P Shah And Co Shah |
| Chartered Accountant | S Nagwekar & Co |
| Partner | Role in project |
|---|---|
| Shreem Properties | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Mar26.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Form2 Mar26.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: Form3 Mar26 .pdf | 4 May 2026 |
| Building plan approvalFile: Layout Plan.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Form1 SP Dec25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form2 SP Dec25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form3 SP Dec25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Archi Form1 Sept25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form2 Sept25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form3 Sept25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: Form1 Arch June25.pdf | 25 Aug 2025 |
| Withdrawal Update Form 2File: Form2 june25.pdf | 25 Aug 2025 |
| Withdrawal Update Form 3File: Form3 CA June25.pdf | 25 Aug 2025 |
| Withdrawal Update Form 1File: Form1 Arch SP Mar25.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: Form2 sp mar25.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form3 SP CA Mar25_compressed.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: Form1 Arch SP Mar25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form2 sp mar25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form3 SP CA Mar25_compressed.pdf | 19 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2a Mar25.pdf | 18 Jul 2025 |
| Form 1File: Form1 Arch SP Mar25.pdf | 15 Jul 2025 |
| Form 2File: Form2 sp mar25.pdf | 15 Jul 2025 |
| Form 3File: Form3 CA SP Mar25.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold mar25.pdf | 15 Jul 2025 |
| Form 5 (FY 2024-2025)File: form5 mar25 SP.pdf | 15 Jul 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf | 20 May 2025 |
| Proforma of Agreement for saleFile: Ag for Sale-Revised.pdf | 20 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch Mar25.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA CERTI DEC 24.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SP DEC24 .pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold-unsold dec24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form1 Dec24 daisaria.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 sept24.pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD sept24 SP.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA Sept24.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 sept24.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA June24.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 June24.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold-unsold June24.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Daisaria June24.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 mar24.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold-unsold Mar 24 Shree Krishna.pdf | 10 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site supervisor SP 2A Mar2024.pdf | 8 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Shreem Prop Mar24.pdf | 2 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 Shreem Prop March24.pdf | 2 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch Mar 2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreem Prop FFORM- Sept23 Form3.pdf | 26 Dec 2023 |
| Building plan approvalFile: Amendletter_signed14-12-22.pdf | 29 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed14-12-22.pdf | 29 Nov 2023 |
| Layout approvalFile: Layout plan 14122022.pdf | 16 Nov 2023 |
| Building plan approvalFile: Page2-3-4.pdf | 16 Nov 2023 |
| Building plan approvalFile: page5-6.pdf | 16 Nov 2023 |
| Building plan approvalFile: page7-8.pdf | 16 Nov 2023 |
| Building plan approvalFile: page9-10.pdf | 16 Nov 2023 |
| Building plan approvalFile: page11-12.pdf | 16 Nov 2023 |
| Building plan approvalFile: page13-14.pdf | 16 Nov 2023 |
| Building plan approvalFile: page15-16.pdf | 16 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Layout plan 14122022.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page2-3-4.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page5-6.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page7-8.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page9-10.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page11-12.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page13-14.pdf | 16 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: page15-16.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: sq plot sold unsold sept23.pdf | 20 Oct 2023 |
| Declaration about Commencement CertificateFile: decla cc shree krishna A and B.pdf | 18 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC full Shree Krishna Powai.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 sq plot Mar23.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5 sq plot.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch daisaria Sept23.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SITE SUPERVISOR Shree Krishna wing A and B FY22 23.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Mar23.pdf | 17 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Archi Mar 23.pdf | 12 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC revalidate.pdf | 1 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM3.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement final.pdf | 29 Dec 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ATL Corporate ParkP51800002013 | ATL Corporate Park, Mumbai Suburban | Jul 2017 | Completed | Dec 2017 | Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE KRISHNA WING A and B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Powai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
ROSWALT ZAIDEN
A S HIGHTECH LLP
Alta Monte and Signet
ERA REALTORS PRIVATE LIMITED
Shraddha Park City
Shraddha Prime Projects Limited
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
See every Mumbai Suburban project, with the district possession charts
Builder: Shreem Properties
Shreem Properties has 3 registrations on MahaRERA, including ATL Corporate Park and SHREE KRISHNA WING A and B. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SHREE KRISHNA WING A and B is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE KRISHNA WING A and B?
The registered promoter entity is Shreem Properties, an others as per the filing. Its GSTIN 27ABQFS5367K1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE KRISHNA WING A and B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE KRISHNA WING A and B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE KRISHNA WING A and B?
The professionals named in the filing: Architect: Daisaria Associates; Engineer: Mahimtura Consultants Pvt Ltd; Engineer: Milind Thakur; Chartered Accountant: Bhupendra P Shah And Co Shah; Chartered Accountant: S Nagwekar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE KRISHNA WING A and B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback