SHREE KARTIKEYA PHASE 2
RG-MH-61506 · RERA P51600054801 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE KARTIKEYA PHASE 2 is a Others project by NIRMITI INFRA in Nashik, Maharashtra, registered with MahaRERA as P51600054801 on 12 Feb 2024. Possession is promised by 31 Oct 2026. 4 of the 22 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.
At a glance
Project
- NameSHREE KARTIKEYA PHASE 2
- TypeOthers
- Location
- TAL. BHAGUR DIST. NASHIK
- DEOLALI CB
- Deolali (CB)
- Nashik
- 422401
- Pincode422401
- RERA no.P51600054801
- ReraGenie IDRG-MH-61506
Builder
- NameNIRMITI INFRA
- Entity typePartnership
- PartnersNILESH TUKARAM GADHAVE, RAJENDRA JAYRAM HANDORE, JAYANT KULDIPRAI PAPNEJA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Feb 2024
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings3 building records
- Documents filed68 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 4 | 4 | 10 | 8 | 18 |
| BUNGLOW 1-2 | NA | 2 | 2 | 2 | 0 | 2 |
| BUNGLOW 3-4 | NA | 2 | 2 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 60%.
BUILDING A59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW 1-20%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW 3-40%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 15 | 15 |
| BUNGLOW 1-2 | 1 | 1 |
| BUNGLOW 3-4 | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 2.20 cr | Rs 1.40 cr |
| - | NA | Rs 53.07 lakh | Rs 6.88 lakh |
| BUNGLOW 1-2 | NA | Rs 51.04 lakh | Rs 2.50 lakh |
| BUNGLOW 3-4 | NA | Rs 51.04 lakh | Rs 2.50 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHAILESH DALVI |
| Architect | DINESH SONAR |
| Engineer | SHUBHAM AGROYA |
| Engineer | DINESH SONAR |
| Engineer | ACHAL RAJE |
| Chartered Accountant | SAURABH MANISHKUMAR LUNAWAT |
| Chartered Accountant | SACHIN PATEL |
| Chartered Accountant | MAYUR BAFANA |
| Partner | Role in project |
|---|---|
| NIRMITI INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Q 1 FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: INVENTORY Q4 FY 24-25.pdf | 18 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Q 1 FY 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: INVENTORY Q4 FY 24-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 Q 1 FY 25-26.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 25-26.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: INVENTORY Q4 FY 24-25.pdf | 19 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf | 4 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 4 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 Q 1 FY 25-26.pdf | 3 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 25-26.pdf | 3 Sep 2025 |
| Withdrawal Update Form 3File: INVENTORY Q4 FY 24-25.pdf | 3 Sep 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Aug 2025 |
| Form 3File: FORM-3 Q-4 23-24 FINAL.pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q4 FY 23-24.pdf | 28 Aug 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Aug 2025 |
| Form 3File: FORM-3 Q-1 24-25 FINAL.pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q1 FY 24-25.pdf | 28 Aug 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Aug 2025 |
| Form 3File: FORM-3 Q-2 24-25 FINAL.pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q2 FY 24-25.pdf | 28 Aug 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q3 FY 24-25.pdf | 28 Aug 2025 |
| Form 3File: FORM-3 Q-3 24-25 FINAL.pdf | 28 Aug 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Aug 2025 |
| Form 3File: FORM-3 Q-4 24-25 FINAL.pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q4 FY 24-25.pdf | 28 Aug 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf | 28 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 24-25.pdf | 28 Aug 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST- Jatan Papneja- 310124.pdf | 31 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST- NILESH GADAVE- 310124.pdf | 31 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST- Rajendra Handore-310124.pdf | 31 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: EC- FINANCE- NEW.pdf | 24 Jan 2024 |
| Details of encumbrances concerned to LegalFile: EC- FINANCE- NEW.pdf | 24 Jan 2024 |
| CERSAI detailsFile: CERSAI UNDERTAKING.pdf | 24 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION TO SEPERATE BANK.pdf | 24 Jan 2024 |
| Layout approvalFile: PLOT LAYOUT_11zon.pdf | 9 Jan 2024 |
| Building plan approvalFile: BUILDING PLAN-1.pdf | 9 Jan 2024 |
| Building plan approvalFile: BUILDING PLAN-2.pdf | 9 Jan 2024 |
| PAN CardFile: FIRM PAN- NIRMITI INFRA.pdf | 9 Jan 2024 |
| Copy of the legal title reportFile: TITLE SEARCH REPORT_11zon.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: EC- LEGAL.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to LegalFile: EC- LEGAL.pdf | 9 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLOT LAYOUT_11zon.pdf | 9 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN-1.pdf | 9 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN-2.pdf | 9 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_comp.pdf | 9 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: PLINTH COMPLETION CERTIFICATE.pdf | 9 Jan 2024 |
| Declaration about Commencement CertificateFile: DECLARATION TO CC.pdf | 9 Jan 2024 |
| Declaration in FORM BFile: FORM B.pdf | 9 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 9 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_11zon.pdf | 9 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200292988467_For_Asset_Based_Search_09_01_2024_14_21_03_607.pdf | 9 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 9 Jan 2024 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT TO SALE.pdf | 9 Jan 2024 |
| Proforma of Allotment letterFile: DRAFT PROFORMA TO ALLOTEMENT LETTER_11zon.pdf | 9 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: NO DEVIATION- PROFORMA TO ALLOTEMENT TO SALE.pdf | 9 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION- AGREEMENT TO SALE.pdf | 9 Jan 2024 |
| Other - LegalFile: PURCHASE DEED_11zon.pdf | 9 Jan 2024 |
| Other - TechnicalFile: PARTNERSHIP DEED_COMP.pdf | 9 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE KARTIKEYA PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DEOLALI CB4,100+ in Nashik
Meru Heritage
Amit Builders and Developers
SAI PARK
Jay Developers
ASHTAPAD PHASE VII
ARKK BUILDERS AND DEVELOPERS
Sai Nisarg
Devraj Builders & Land Developers
Ayodhya Residency
Akshay Subhash Khalkar
TULASI BAUG
RISHIKESH BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: NIRMITI INFRA
NIRMITI INFRA has 2 registrations on MahaRERA, including SHREE KARTIKEYA PHASE 2 and VIMAL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE KARTIKEYA PHASE 2 is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE KARTIKEYA PHASE 2?
The registered promoter entity is NIRMITI INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE KARTIKEYA PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE KARTIKEYA PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE KARTIKEYA PHASE 2?
The professionals named in the filing: Architect: SHAILESH DALVI; Architect: DINESH SONAR; Engineer: SHUBHAM AGROYA; Engineer: DINESH SONAR; Engineer: ACHAL RAJE; Chartered Accountant: SAURABH MANISHKUMAR LUNAWAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE KARTIKEYA PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback