Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
41 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

SHREE HAVEN is a Residential / Group Housing project by SHREE HOUSING CO in Thane, Maharashtra, registered with MahaRERA as P51700002002 on 31 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 57 of the 98 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE HAVEN
  • TypeResidential / Group Housing
  • Location
    • MIRA BHAYANDAR
    • BHAYANDAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002002
  • ReraGenie IDRG-MH-26988

Builder

  • NameSHREE HOUSING CO
  • Entity typePartnership
  • PartnersSUDAM CHANDRU GAIKWAD, BHAVIK ASHOK VYAS

Key dates

this monthRegisteredJul 2017First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed92 files

Current status

58%57 of 98 units booked
92.1%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE HAVENNA232098098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SHREE HAVEN: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered78

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,456 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAVI DEVELOPMENTMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMBMC
Permissible FSI4513.91
Proposed, not sanctioned2,456 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANTI PARK MIRA ROAD
Estimated costRs 33.00 cr
Cost incurredRs 30.40 cr
Work done92.12%
BuildingWingEstimatedIncurred
SHREE HAVENNARs 32.00 crRs 29.50 cr
-NARs 1.00 crRs 90.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ ARCHITECT AND CONSULTANTS
EngineerTEJ ARCHITECT AND CONSULTANTS
EngineerAdarsh Counsultant
Chartered AccountantRamesh D Lukad
PartnerRole in project
SHREE HOUSING CO-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12082502366Dec 2025 → Dec 2027

Reason as filed by the promoterReason for Delay & Extension Request The completion of our registered project “Shree Haven” (Registration No. P51700002002) has been delayed due to a combination of unavoidable factors beyond our reasonable control, which have impacted the pace of construction and finishing works. The primary reasons include: Pandemic Impact & Labour Shortage: COVID-19 restrictions and subsequent waves during and after 2020-2022 caused prolonged site work stoppages, slowed material supply, and labour migration, affecting critical construction milestones. Approval & Regulatory Delays: Clearances for certain sta

Litigation declared1

CaseCourtStatus
191/17/2017CIVIL COURT THANEON PRIMARY BASIS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1 Survey No 72.pdf20 Jul 2026
Withdrawal Update Form 2File: Form -2 Survey No 72.pdf20 Jul 2026
Withdrawal Update Form 3File: Shree Housing Ca Form 3.pdf20 Jul 2026
Withdrawal Update Form 1File: Form -1 Survey No 72.pdf2 May 2026
Withdrawal Update Form 2File: Form -2 Survey No 72.pdf2 May 2026
Withdrawal Update Form 3File: Form 3 SHREE HOUSING CO.pdf2 May 2026
Withdrawal Update Form 1File: Shree Hevan Form 1.pdf11 Feb 2026
Withdrawal Update Form 2File: Dec Form 2.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3 SHREE HOUSING CO.pdf11 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Dec 2025
Withdrawal Update Form 2File: img20251213_13194525.pdf30 Dec 2025
Withdrawal Update Form 3File: SHREE HOUSING CO.pdf30 Dec 2025
Form 2A (FY 2023-2024)File: 2a 23-24.pdf10 Dec 2025
Form 2A (FY 2024-2025)File: 2a 24-25.pdf10 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf19 Nov 2025
Withdrawal Update Form 3File: SHREE HOUSING CO.pdf19 Nov 2025
Form 2A (FY 2019-2020)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf25 Oct 2025
Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf25 Oct 2025
Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) (1).pdf25 Oct 2025
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf25 Oct 2025
Form 5 (FY 2018-2019)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf25 Oct 2025
Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf25 Oct 2025
Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf25 Oct 2025
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf25 Oct 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf25 Oct 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf25 Oct 2025
Form 5 (FY 2024-2025)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf25 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE (2)_page-0001.pdf14 Feb 2025
Layout approvalFile: Approved Layout-Model_compressed.pdf13 Feb 2025
Building plan approvalFile: TYPICAL FLOOR PLAN.PDF13 Feb 2025
Building plan approvalFile: REFUGE FLOOR PLAN.PDF13 Feb 2025
Copy of Layout Approval (in case of layout)File: Approved Layout-Model_compressed.pdf13 Feb 2025
Certificates of CA (Form 3)File: FORM 3, shree housing (1) (1)_compressed.pdf13 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE (1).pdf13 Feb 2025
Building Plan Approval (IOD)File: REFUGE FLOOR PLAN.PDF13 Feb 2025
Building Plan Approval (IOD)File: TYPICAL FLOOR PLAN.PDF13 Feb 2025
Disclosure of sold/ booked inventoryFile: sold unsold list.pdf13 Feb 2025
Layout approvalFile: Approved Layout-Model_11zon.pdf10 Dec 2024
Building plan approvalFile: Approved Layout-Model_11zon.pdf10 Dec 2024
Building plan approvalFile: C2 C3 C4.pdf10 Dec 2024
Building plan approvalFile: GROUND FLOOR.PDF10 Dec 2024
Building plan approvalFile: C6 REFUGE FLOOR PLAN.PDF10 Dec 2024
Building plan approvalFile: C6 REFUGE FLOOR PLAN[1].PDF10 Dec 2024
Building plan approvalFile: C6 TYPICAL FLOOR PLAN.PDF10 Dec 2024
Copy of Layout Approval (in case of layout)File: Approved Layout-Model_11zon.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 2019 C C Copy-UPDATE.pdf10 Dec 2024
Building Plan Approval (IOD)File: Approved Layout-Model_11zon.pdf10 Dec 2024
Building Plan Approval (IOD)File: C6 TYPICAL FLOOR PLAN.PDF10 Dec 2024
Building Plan Approval (IOD)File: C6 REFUGE FLOOR PLAN[1].PDF10 Dec 2024
Building Plan Approval (IOD)File: C6 REFUGE FLOOR PLAN.PDF10 Dec 2024
Building Plan Approval (IOD)File: GROUND FLOOR.PDF10 Dec 2024
Building Plan Approval (IOD)File: C2 C3 C4.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf10 Dec 2024
Proforma of Agreement for saleFile: shree haven aggreemen.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form3 - Shree housing.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5- Shree Housing.pdf13 May 2024
Certificates of CA (Form 3)File: Form3 - Shree housing.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: fORM5-21-22.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2a-21-22.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-22-23.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf29 Sep 2023
Certificates of CA (Form 3)File: fORM3-sHREE hOUSING.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: fORM5-21-22.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fORM5-22-23.pdf29 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf7 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19.pdf7 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20.pdf7 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shree Housing Co 2019-20.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shree Housing Co 2020-21.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Shree Housing Co.pdf4 Mar 2020
Certificates of CA (Form 5)File: Form-5 Shree Housing Co.pdf7 Dec 2018
Certificates of CA (Form 3)File: Form-3 C A Certificate-SHREE HOSING CO.pdf5 Jun 2018
Layout approvalFile: LAYOUT1.pdf3 Oct 2017
Copy of Layout Approval (in case of layout)File: LAYOUT1.pdf3 Oct 2017
Proforma of Allotment letterFile: Agreement For Sale.pdf3 Oct 2017
Building plan approvalFile: Layout.pdf29 Jul 2017
Layout approvalFile: Layout.pdf29 Jul 2017

How this compares with Thane

58%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE HAVEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDAR7,600+ in Thane

2 kmSHREE HAVENCompleted 97Lapsed / revoked 72Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 256 registered projects within 2 km.

Builder: SHREE HOUSING CO

SHREE HOUSING CO has 1 registration on MahaRERA, including SHREE HAVEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE HAVEN is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE HAVEN?

The registered promoter entity is SHREE HOUSING CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE HAVEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE HAVEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE HAVEN?

The professionals named in the filing: Architect: TEJ ARCHITECT AND CONSULTANTS; Engineer: TEJ ARCHITECT AND CONSULTANTS; Engineer: Adarsh Counsultant; Chartered Accountant: Ramesh D Lukad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE HAVEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE HAVEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE HAVEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.