Home / Browse projects / Thane, Maharashtra / SHREE HAVEN
SHREE HAVEN
RG-MH-26988 · RERA P51700002002 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE HAVEN is a Residential / Group Housing project by SHREE HOUSING CO in Thane, Maharashtra, registered with MahaRERA as P51700002002 on 31 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 57 of the 98 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE HAVEN
- TypeResidential / Group Housing
- Location
- MIRA BHAYANDAR
- BHAYANDAR
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700002002
- ReraGenie IDRG-MH-26988
Builder
- NameSHREE HOUSING CO
- Entity typePartnership
- PartnersSUDAM CHANDRU GAIKWAD, BHAVIK ASHOK VYAS
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE HAVEN | NA | 23 | 20 | 98 | 0 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
SHREE HAVEN: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed78
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAVI DEVELOPMENT | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE HAVEN | NA | Rs 32.00 cr | Rs 29.50 cr |
| - | NA | Rs 1.00 cr | Rs 90.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEJ ARCHITECT AND CONSULTANTS |
| Engineer | TEJ ARCHITECT AND CONSULTANTS |
| Engineer | Adarsh Counsultant |
| Chartered Accountant | Ramesh D Lukad |
| Partner | Role in project |
|---|---|
| SHREE HOUSING CO | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReason for Delay & Extension Request The completion of our registered project “Shree Haven” (Registration No. P51700002002) has been delayed due to a combination of unavoidable factors beyond our reasonable control, which have impacted the pace of construction and finishing works. The primary reasons include: Pandemic Impact & Labour Shortage: COVID-19 restrictions and subsequent waves during and after 2020-2022 caused prolonged site work stoppages, slowed material supply, and labour migration, affecting critical construction milestones. Approval & Regulatory Delays: Clearances for certain sta
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 191/17/2017 | CIVIL COURT THANE | ON PRIMARY BASIS |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form -1 Survey No 72.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form -2 Survey No 72.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Shree Housing Ca Form 3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form -1 Survey No 72.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: Form -2 Survey No 72.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Form 3 SHREE HOUSING CO.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: Shree Hevan Form 1.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Dec Form 2.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SHREE HOUSING CO.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: img20251213_13194525.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: SHREE HOUSING CO.pdf | 30 Dec 2025 |
| Form 2A (FY 2023-2024)File: 2a 23-24.pdf | 10 Dec 2025 |
| Form 2A (FY 2024-2025)File: 2a 24-25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 19 Nov 2025 |
| Withdrawal Update Form 3File: SHREE HOUSING CO.pdf | 19 Nov 2025 |
| Form 2A (FY 2019-2020)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 25 Oct 2025 |
| Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 25 Oct 2025 |
| Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) (1).pdf | 25 Oct 2025 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 25 Oct 2025 |
| Form 5 (FY 2018-2019)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf | 25 Oct 2025 |
| Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf | 25 Oct 2025 |
| Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 25 Oct 2025 |
| Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 25 Oct 2025 |
| Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 25 Oct 2025 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 25 Oct 2025 |
| Form 5 (FY 2024-2025)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 25 Oct 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE (2)_page-0001.pdf | 14 Feb 2025 |
| Layout approvalFile: Approved Layout-Model_compressed.pdf | 13 Feb 2025 |
| Building plan approvalFile: TYPICAL FLOOR PLAN.PDF | 13 Feb 2025 |
| Building plan approvalFile: REFUGE FLOOR PLAN.PDF | 13 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Approved Layout-Model_compressed.pdf | 13 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3, shree housing (1) (1)_compressed.pdf | 13 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE (1).pdf | 13 Feb 2025 |
| Building Plan Approval (IOD)File: REFUGE FLOOR PLAN.PDF | 13 Feb 2025 |
| Building Plan Approval (IOD)File: TYPICAL FLOOR PLAN.PDF | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold list.pdf | 13 Feb 2025 |
| Layout approvalFile: Approved Layout-Model_11zon.pdf | 10 Dec 2024 |
| Building plan approvalFile: Approved Layout-Model_11zon.pdf | 10 Dec 2024 |
| Building plan approvalFile: C2 C3 C4.pdf | 10 Dec 2024 |
| Building plan approvalFile: GROUND FLOOR.PDF | 10 Dec 2024 |
| Building plan approvalFile: C6 REFUGE FLOOR PLAN.PDF | 10 Dec 2024 |
| Building plan approvalFile: C6 REFUGE FLOOR PLAN[1].PDF | 10 Dec 2024 |
| Building plan approvalFile: C6 TYPICAL FLOOR PLAN.PDF | 10 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Approved Layout-Model_11zon.pdf | 10 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2019 C C Copy-UPDATE.pdf | 10 Dec 2024 |
| Building Plan Approval (IOD)File: Approved Layout-Model_11zon.pdf | 10 Dec 2024 |
| Building Plan Approval (IOD)File: C6 TYPICAL FLOOR PLAN.PDF | 10 Dec 2024 |
| Building Plan Approval (IOD)File: C6 REFUGE FLOOR PLAN[1].PDF | 10 Dec 2024 |
| Building Plan Approval (IOD)File: C6 REFUGE FLOOR PLAN.PDF | 10 Dec 2024 |
| Building Plan Approval (IOD)File: GROUND FLOOR.PDF | 10 Dec 2024 |
| Building Plan Approval (IOD)File: C2 C3 C4.pdf | 10 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD.pdf | 10 Dec 2024 |
| Proforma of Agreement for saleFile: shree haven aggreemen.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: Form3 - Shree housing.pdf | 13 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5- Shree Housing.pdf | 13 May 2024 |
| Certificates of CA (Form 3)File: Form3 - Shree housing.pdf | 30 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: fORM5-21-22.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2a-21-22.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-22-23.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 29 Sep 2023 |
| Certificates of CA (Form 3)File: fORM3-sHREE hOUSING.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: fORM5-21-22.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fORM5-22-23.pdf | 29 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 7 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19.pdf | 7 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20.pdf | 7 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 7 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shree Housing Co 2019-20.pdf | 7 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shree Housing Co 2020-21.pdf | 7 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Shree Housing Co.pdf | 4 Mar 2020 |
| Certificates of CA (Form 5)File: Form-5 Shree Housing Co.pdf | 7 Dec 2018 |
| Certificates of CA (Form 3)File: Form-3 C A Certificate-SHREE HOSING CO.pdf | 5 Jun 2018 |
| Layout approvalFile: LAYOUT1.pdf | 3 Oct 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT1.pdf | 3 Oct 2017 |
| Proforma of Allotment letterFile: Agreement For Sale.pdf | 3 Oct 2017 |
| Building plan approvalFile: Layout.pdf | 29 Jul 2017 |
| Layout approvalFile: Layout.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE HAVEN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHAYANDAR7,600+ in Thane
Filed coordinates, straight-line distance. 256 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: SHREE HOUSING CO
SHREE HOUSING CO has 1 registration on MahaRERA, including SHREE HAVEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHREE HAVEN is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE HAVEN?
The registered promoter entity is SHREE HOUSING CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE HAVEN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE HAVEN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE HAVEN?
The professionals named in the filing: Architect: TEJ ARCHITECT AND CONSULTANTS; Engineer: TEJ ARCHITECT AND CONSULTANTS; Engineer: Adarsh Counsultant; Chartered Accountant: Ramesh D Lukad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE HAVEN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback