Home / Browse projects / Mumbai Suburban, Maharashtra / Shree Hari Krupa
Shree Hari Krupa
RG-MH-07263 · RERA P51800055568 · Last updated on MahaRERA portal: 18 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Hari Krupa is a Residential / Group Housing project by MAMTORA FOUNDATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055568 on 2 Apr 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 1 of the 27 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameShree Hari Krupa
- TypeResidential / Group Housing
- Location
- Malad North at Ramchandra Lane
- MALAD WEST
- Malad
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- RERA no.P51800055568
- ReraGenie IDRG-MH-07263
Builder
- NameMAMTORA FOUNDATION
- Entity typePartnership
- PartnersNATWARLAL MATHURADAS LAL, HARSHA NATWAR LAL, RAJESH MATHURADAS LAL
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed52 files
Current status
Figures as on 18 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE HARI KRUPA BUILDING NO 2 | NA | 4 | 3 | 27 | 0 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
SHREE HARI KRUPA BUILDING NO 2: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HARI ASHISH COPERATIVE HOUSING SOCIETY LIMITED | Malad | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE HARI KRUPA BUILDING NO 2 | NA | Rs 16.56 cr | Rs 8.43 cr |
| - | NA | Rs 95.00 lakh | Rs 13.15 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR DESIGN STUDIO |
| Engineer | CSE CONSULTANTS |
| Chartered Accountant | VAYEDA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| MAMTORA FOUNDATION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHE CONSTRUCTION OF THE PROJECT UNDER REFERENCE IS DELAY AS THE VARIOUS APPROVALS FROM CONCERNED DEPARTMENT LIKE FIRE NOC, LIFT CERTIFICATES TOOK LONGER TIME THEN ESTIMATED. ALLOUR CIVIL WORK WAS COMPLETED UPTO THE PROJECT COMPLETION DATE i.e. 31-12-2025 BUT FURTHER APPROVALS FROM THE CONCERNED DEPARTMENTS TOOK LONGER TIME THAN ESTIMATED. WE ARE IN THE PROCESS OF OBTAINING VARIOUS APPROVALS AND THE OCCUPATION CERTIFICATE FROM THE CONCERNED DEPARTMENT AND SINCE THE OCCUPATION CERTIFICATE HAS NOT BEEN OBTAINED UPTO THE PROJECT COMPLETION DATE OF 31-12-2025 WE ARE SEEKING FOR EXTENTION OF THE REG
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect RERA Certificate 31 07 2026.pdf | 18 Aug 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 18 Aug 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 18 Aug 2026 |
| Withdrawal Update Form 1File: Architect RERA Certificate 31 07 2026.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: 659A Form 2 Engineer Certificate Q1 25 26 ONLH.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: Architect RERA Certificate Q4 FY 25 26.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4 25 26 ONLH.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q4.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Architect RERA Certificate 30-09-2025 Q2.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Architect RERA Certificate 31-12-2025 Q3.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: 659A_03_Form 2 Engineer Certificate Q2-ONLH 14 01 2026.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: 659A_04_Form 2 Engineer Certificate Q3-ONLH 14 01 2026 (2).pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q2.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q3.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Architect RERA Certificate 05-09-2025 Q1.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: 659A_05_Form 2 Engineer Certificate Q1 - onlh - 14 01 2026.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q1.pdf | 25 Feb 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Hari Krupa Q3 24-25.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 Signed.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate FY 24-25 Q1.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate FY 24-25 Q2.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Form 2 FY 24-25 Q1.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Form 2 FY 24-25 Q2.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish RERA Form 3 Q1.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish RERA Form 3 Q2.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Shree Hari Krupa Inventory List Q1.pdf | 9 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Shree Hari Krupa Inventory List Q2.pdf | 9 Dec 2024 |
| Other - TechnicalFile: Declaration for layout Hari Ashish.pdf | 12 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: DR REPORT (1).pdf | 22 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: DR AGREEMENT (2).pdf | 22 Feb 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (3) (1).pdf | 20 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Harsha N Lal.pdf | 30 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Rajesh M Lal.pdf | 30 Jan 2024 |
| Copy of the legal title reportFile: title.pdf | 19 Jan 2024 |
| Declaration about Commencement CertificateFile: CC Covering Letter HA RERA.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish Form 3.pdf | 19 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - disclosure of interest.pdf | 19 Jan 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf | 19 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter rera (1).pdf | 19 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 16 Jan 2024 |
| Layout approvalFile: Drawing (2).pdf | 9 Dec 2023 |
| Building plan approvalFile: 2386496_IOD_signed.pdf | 9 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES.pdf | 9 Dec 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES.pdf | 9 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Drawing (2).pdf | 9 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2386496_IOD_signed.pdf | 9 Dec 2023 |
| Declaration in FORM BFile: FORM 'B' MAMTORA FOUNDATION.pdf | 9 Dec 2023 |
| CERSAI detailsFile: CERSAI DECLARATION (15).pdf | 9 Dec 2023 |
| PAN CardFile: MF PAN Card.pdf | 8 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Hari Krupa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MALAD WEST6,700+ in Mumbai Suburban
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: MAMTORA FOUNDATION
MAMTORA FOUNDATION has 2 registrations on MahaRERA, including SHREE GOVIND KRUPA and Shree Hari Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shree Hari Krupa is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Hari Krupa?
The registered promoter entity is MAMTORA FOUNDATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Hari Krupa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Hari Krupa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Hari Krupa?
The professionals named in the filing: Architect: AR DESIGN STUDIO; Engineer: CSE CONSULTANTS; Chartered Accountant: VAYEDA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Hari Krupa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback