Shree Hari Krupa

By MAMTORA FOUNDATION

RG-MH-07263 · RERA P51800055568 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Staircases, 95%
26 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Shree Hari Krupa is a Residential / Group Housing project by MAMTORA FOUNDATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055568 on 2 Apr 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 1 of the 27 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Hari Krupa
  • TypeResidential / Group Housing
  • Location
    • Malad North at Ramchandra Lane
    • MALAD WEST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800055568
  • ReraGenie IDRG-MH-07263

Builder

  • NameMAMTORA FOUNDATION
  • Entity typePartnership
  • PartnersNATWARLAL MATHURADAS LAL, HARSHA NATWAR LAL, RAJESH MATHURADAS LAL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

1 months past promisethis monthRegisteredApr 2024First promiseDec 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed52 files

Current status

4%1 of 27 units booked
48.9%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE HARI KRUPA BUILDING NO 2NA4327027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

SHREE HARI KRUPA BUILDING NO 2: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025
LandownerVillageDistrict
HARI ASHISH COPERATIVE HOUSING SOCIETY LIMITEDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5484.32
Proposed, not sanctioned702 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO 2 HEENA GAURAV HEIGHTS BUILDING NO 2 SV ROAD KANDIVALI WEST MUMBAI 400067
Estimated costRs 17.51 cr
Cost incurredRs 8.56 cr
Work done48.87%
BuildingWingEstimatedIncurred
SHREE HARI KRUPA BUILDING NO 2NARs 16.56 crRs 8.43 cr
-NARs 95.00 lakhRs 13.15 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR DESIGN STUDIO
EngineerCSE CONSULTANTS
Chartered AccountantVAYEDA AND ASSOCIATES
PartnerRole in project
MAMTORA FOUNDATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27022620032Dec 2025 → Sep 2026

Reason as filed by the promoterTHE CONSTRUCTION OF THE PROJECT UNDER REFERENCE IS DELAY AS THE VARIOUS APPROVALS FROM CONCERNED DEPARTMENT LIKE FIRE NOC, LIFT CERTIFICATES TOOK LONGER TIME THEN ESTIMATED. ALLOUR CIVIL WORK WAS COMPLETED UPTO THE PROJECT COMPLETION DATE i.e. 31-12-2025 BUT FURTHER APPROVALS FROM THE CONCERNED DEPARTMENTS TOOK LONGER TIME THAN ESTIMATED. WE ARE IN THE PROCESS OF OBTAINING VARIOUS APPROVALS AND THE OCCUPATION CERTIFICATE FROM THE CONCERNED DEPARTMENT AND SINCE THE OCCUPATION CERTIFICATE HAS NOT BEEN OBTAINED UPTO THE PROJECT COMPLETION DATE OF 31-12-2025 WE ARE SEEKING FOR EXTENTION OF THE REG

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect RERA Certificate 31 07 2026.pdf18 Aug 2026
Withdrawal Update Form 2File: form 2.pdf18 Aug 2026
Withdrawal Update Form 3File: form 3.pdf18 Aug 2026
Withdrawal Update Form 1File: Architect RERA Certificate 31 07 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: 659A Form 2 Engineer Certificate Q1 25 26 ONLH.pdf10 Aug 2026
Withdrawal Update Form 3File: form 3.pdf10 Aug 2026
Withdrawal Update Form 1File: Architect RERA Certificate Q4 FY 25 26.pdf8 Aug 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4 25 26 ONLH.pdf8 Aug 2026
Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q4.pdf8 Aug 2026
Withdrawal Update Form 1File: Architect RERA Certificate 30-09-2025 Q2.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect RERA Certificate 31-12-2025 Q3.pdf26 Feb 2026
Withdrawal Update Form 2File: 659A_03_Form 2 Engineer Certificate Q2-ONLH 14 01 2026.pdf26 Feb 2026
Withdrawal Update Form 2File: 659A_04_Form 2 Engineer Certificate Q3-ONLH 14 01 2026 (2).pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q2.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q3.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect RERA Certificate 05-09-2025 Q1.pdf25 Feb 2026
Withdrawal Update Form 2File: 659A_05_Form 2 Engineer Certificate Q1 - onlh - 14 01 2026.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 Shree Hari Krupa Q1.pdf25 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Hari Krupa Q3 24-25.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 Signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate FY 24-25 Q1.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate FY 24-25 Q2.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Form 2 FY 24-25 Q1.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Form 2 FY 24-25 Q2.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish RERA Form 3 Q1.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish RERA Form 3 Q2.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Shree Hari Krupa Inventory List Q1.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Shree Hari Krupa Inventory List Q2.pdf9 Dec 2024
Other - TechnicalFile: Declaration for layout Hari Ashish.pdf12 Mar 2024
Deviation Report with respect to Allotment letterFile: DR REPORT (1).pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DR AGREEMENT (2).pdf22 Feb 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (3) (1).pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Harsha N Lal.pdf30 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Rajesh M Lal.pdf30 Jan 2024
Copy of the legal title reportFile: title.pdf19 Jan 2024
Declaration about Commencement CertificateFile: CC Covering Letter HA RERA.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hari Ashish Form 3.pdf19 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - disclosure of interest.pdf19 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf19 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter rera (1).pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Jan 2024
Layout approvalFile: Drawing (2).pdf9 Dec 2023
Building plan approvalFile: 2386496_IOD_signed.pdf9 Dec 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES.pdf9 Dec 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES.pdf9 Dec 2023
Copy of Layout Approval (in case of layout)File: Drawing (2).pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2386496_IOD_signed.pdf9 Dec 2023
Declaration in FORM BFile: FORM 'B' MAMTORA FOUNDATION.pdf9 Dec 2023
CERSAI detailsFile: CERSAI DECLARATION (15).pdf9 Dec 2023
PAN CardFile: MF PAN Card.pdf8 Dec 2023

How this compares with Mumbai Suburban

4%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 9 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Hari Krupa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

Builder: MAMTORA FOUNDATION

MAMTORA FOUNDATION has 2 registrations on MahaRERA, including SHREE GOVIND KRUPA and Shree Hari Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shree Hari Krupa is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Hari Krupa?

The registered promoter entity is MAMTORA FOUNDATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Hari Krupa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Hari Krupa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Hari Krupa?

The professionals named in the filing: Architect: AR DESIGN STUDIO; Engineer: CSE CONSULTANTS; Chartered Accountant: VAYEDA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Hari Krupa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Hari Krupa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Hari Krupa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.