Home / Browse projects / Daman, Daman & Diu / FORTUNE AMAIRA
FORTUNE AMAIRA
RG-MH-00462 · RERA P49500000042 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FORTUNE AMAIRA is a Mixed project by FORTUNE PARVATI in Daman, Daman & Diu, registered with MahaRERA as P49500000042 on 22 Feb 2023. Possession is promised by 31 Mar 2029. 33 of the 76 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameFORTUNE AMAIRA
- TypeMixed
- Location
- VAPI DEVKA ROAD
- DUNETHA
- Others
- Daman
- 396210
- Pincode396210
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49500000042
- ReraGenie IDRG-MH-00462
Builder
- NameFORTUNE PARVATI
- Entity typePartnership
- PartnersDARSHAK BHUPATRAI SHAH, Dharmendra Makanbhai Tandel
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2023
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings1 building record
- Documents filed140 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 1 | NA | 10 | 10 | 48 | 28 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 25%.
BUILDING 1: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Manish Doshi |
| Engineer | Shah Priyank Rajeshkumar |
| Chartered Accountant | Jignesh Vasani |
| Chartered Accountant | D.D Pagaria & Associates |
| Chartered Accountant | P.R. Desai & Co |
| Partner | Role in project |
|---|---|
| FORTUNE PARVATI | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2029
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A Amaira.pdf | 24 Apr 2026 |
| Form 1File: Form 1 Fortune Amaira 31-03-26.pdf | 20 Apr 2026 |
| Form 2File: Form 2.pdf | 20 Apr 2026 |
| Form 3File: Amaira.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Amaira (2).pdf | 20 Apr 2026 |
| Form 1File: Form 1 Fortune Amaira 31-12-25.pdf | 21 Jan 2026 |
| Form 2File: Form 2Fortune Amaira.pdf | 21 Jan 2026 |
| Form 3File: Form 3 Amaira.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Amaira.pdf | 21 Jan 2026 |
| Form 5 (FY 2023-2024)File: F Amira_18112025172443.pdf | 18 Nov 2025 |
| Form 5 (FY 2022-2023)File: CA (Form 5) (FY 2022-23).pdf | 8 Nov 2025 |
| Form 5 (FY 2024-2025)File: amaira form 5_05112025140209.pdf | 7 Nov 2025 |
| Form 2A (FY 2022-2023)File: Amaira 31_3_23_05112025093040.pdf | 5 Nov 2025 |
| Form 2A (FY 2023-2024)File: Amaira 31_3_24_05112025093120.pdf | 5 Nov 2025 |
| Form 2A (FY 2024-2025)File: Amaira 31_3_25_05112025092925.pdf | 5 Nov 2025 |
| Form 1File: Form 1 Fortune Amaira 30-09-25.pdf | 18 Oct 2025 |
| Form 2File: Form 2 Fortune Amaira 30-9-25.pdf | 18 Oct 2025 |
| Form 3File: Amaira 30_9_25_Disclosure.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Amaira 30_9_25_Disclosure.pdf | 18 Oct 2025 |
| Form 1File: Form-1 Fortune Amaira 30-06-2025.PDF | 20 Jul 2025 |
| Form 2File: Form-2 Fortune Amaira 30-06-2025.PDF | 20 Jul 2025 |
| Form 3File: Form-3 Fortune Amaira 30-06-2025.PDF | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form-3 Fortune Amaira 30-06-2025.PDF | 20 Jul 2025 |
| Form 1File: FORM-1 31-03-2023.pdf | 20 Jul 2025 |
| Form 2File: Form-2 31-03-2023.pdf | 20 Jul 2025 |
| Form 3File: Form 3 amaira 31-03-2023.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 amaira 31-03-2023.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 30-06-2023.pdf | 20 Jul 2025 |
| Form 2File: Form-2 30-06-2023.pdf | 20 Jul 2025 |
| Form 3File: Form-3 30-06-2023.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form-3 30-06-2023.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 30-09-2023.pdf | 20 Jul 2025 |
| Form 2File: Form-2 30-09-2023.pdf | 20 Jul 2025 |
| Form 3File: Form 3 30-09-2023.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 30-09-2023.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 31-12-2023.pdf | 20 Jul 2025 |
| Form 2File: FORM-2 31-12-2023.PDF | 20 Jul 2025 |
| Form 3File: Form 3 31-12-2023.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 31-12-2023.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 31-03-2024.pdf | 20 Jul 2025 |
| Form 2File: FORM-2 31-03-2024.PDF | 20 Jul 2025 |
| Form 3File: Form 3 31-03-2024.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 31-03-2024.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 30-06-2024.pdf | 20 Jul 2025 |
| Form 2File: FORM-2 30-06-2024.PDF | 20 Jul 2025 |
| Form 3File: Form 3 30-06-2024.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 30-06-2024.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 31-09-2024.pdf | 20 Jul 2025 |
| Form 2File: FORM-2 30-09-2024.PDF | 20 Jul 2025 |
| Form 3File: Form 3 30-09-2024.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 30-09-2024.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 31-12-2024.PDF | 20 Jul 2025 |
| Form 2File: FORM-2 31-12-2024.PDF | 20 Jul 2025 |
| Form 3File: Form 3 31-12-2024.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 31-12-2024.pdf | 20 Jul 2025 |
| Form 1File: FORM-1 Fortuen Amaira 31-03-2025.pdf | 20 Jul 2025 |
| Form 2File: FORM-2 FORTUNE AMAIRA 31-03-2025.PDF | 20 Jul 2025 |
| Form 3File: Form-3 Fortune Amaira 31-03-2025.PDF | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form-3 Fortune Amaira 31-03-2025.PDF | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 03.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 06.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 09.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: 5) Form 3 012.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: F-AMAIRA FORM-2 31-12-2023.PDF | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: F-AMAIRA FORM-2 31-03-2024.PDF | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: F-AMAIRA FORM-2 30-06-2024.PDF | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: F-AMAIRA FORM-2 30-09-2024.PDF | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: fortune Amaira form-2 31-12-2024.PDF | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM-1 Fortune Amaira.PDF | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Fortune Amaira.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: fortune Parvati.pdf | 9 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Fortune Parvati.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Fortune Amairai QTR-4.pdf | 25 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1-Qtr 3 FAMAIRA.PDF | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1-Qtr 3 FAMAIRA.PDF | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 FParvati- March.PDF | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form-1 FParvati June.PDF | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form-1 FParvati October.PDF | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form-2 FParvati 1-4-23.PDF | 8 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Daman
Computed across the 59 Daman projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep FORTUNE AMAIRA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DUNETHA59 in Daman
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
Fortune DP Nano-2 Phase - 2
G B AND ASSOCIATES
FORTUNE WORLD - 2
FORTUNE DREAM - CON PVT LTD
NEO PARK
MS DARSHAN REALITY
TULSI RESIDENCY
OM ENTERPRISE
Shree Hari Commercial Building Phase 1
ASHOKKUMAR HARIBHAI TANDEL
EXOTICA RESIDENCY
R THREE DEVELOPERS
See every Daman project, with the district possession charts
Builder: FORTUNE PARVATI
FORTUNE PARVATI has 2 registrations on MahaRERA, including FORTUNE AMAIRA and Shilp Bunglows. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Daman district page.
Frequently asked questions
What are my rights if FORTUNE AMAIRA is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FORTUNE AMAIRA?
The registered promoter entity is FORTUNE PARVATI, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FORTUNE AMAIRA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FORTUNE AMAIRA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FORTUNE AMAIRA?
The professionals named in the filing: Architect: Mr Manish Doshi; Engineer: Shah Priyank Rajeshkumar; Chartered Accountant: Jignesh Vasani; Chartered Accountant: D.D Pagaria & Associates; Chartered Accountant: P.R. Desai & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FORTUNE AMAIRA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback