Home / Browse projects / Thane, Maharashtra / SHREE GAURANG
SHREE GAURANG
RG-MH-37105 · RERA P51700015176 · Last updated on MahaRERA portal: 23 Jan 2018
Source: official MahaRERA filing
Red flags
- Registration revoked
- Possession 46 months past the filed date
- 6 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GAURANG is a Residential / Group Housing project by GAURANG ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700015176 on 2 Feb 2018. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 6 complaints are on record with the regulator.
At a glance
Project
- NameSHREE GAURANG
- TypeResidential / Group Housing
- Location
- BAJI PRABHU DESHPANDE ROAD
- NAUPADA
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700015176
- ReraGenie IDRG-MH-37105
Key dates
Key facts
Registration and timeline
- StatusRegistration revoked
- Registered on2 Feb 2018
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings2 building records
- Documents filed32 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG A | NA | 14 | 0 | 0 | 0 | 0 |
| BLDG B | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Jan 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
BLDG A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLDG B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Jan 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed57
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BLDG A | 26 | 26 |
| BLDG B | 31 | 31 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITENDRA MUKADAM |
| Engineer | RAJAN CHANDRAKANT TIPNIS |
| Partner | Role in project |
|---|---|
| GAURANG ASSOCIATES | - |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193255 | The Bombay Postal C.H.S. Ltd. | M/s. Gaurang Associates | 31/05/2020 |
| CC006000000209360 | RATISH ANANT MHATRE | M/s GAURANG ASSOCIATES | 10/12/2021 |
| CC006000000209365 | AJAY ANANT VAIDYA | M/S. GAURANG ASSOCIATES | 12/12/2021 |
| CC006000000209374 | VILAS LAXMAN DHARMADHIKARI | M/s GAURANG ASSOCIATES | 12/12/2021 |
| CC006000000209387 | YASHWANT VITHALRAO CHAVAN | M/s GAURANG ASSOCIATES | 13/12/2021 |
| CC006000000209458 | Sunil Vasudeo Joshi | Gaurang Associates (Deepak M Sane) | 19/12/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jan 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed32
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 23 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engeneer's certificate.pdf | 23 Jan 2018 |
| Certificates of CA (Form 3)File: C A Certificate.pdf | 23 Jan 2018 |
| Building plan approvalFile: HPSC0477.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0478.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0479.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0480.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0481.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0482.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0483.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0484.pdf | 8 Jan 2018 |
| Building plan approvalFile: HPSC0485.pdf | 8 Jan 2018 |
| Layout approvalFile: HPSC0477.pdf | 8 Jan 2018 |
| PAN CardFile: G A PAN.pdf | 8 Jan 2018 |
| Copy of the legal title reportFile: Title Certificate Abhinva CHS.pdf | 8 Jan 2018 |
| Copy of the legal title reportFile: Title Certificate Bombay Postal.pdf | 8 Jan 2018 |
| Details of encumbrancesFile: Letter of Encumbrance.pdf | 8 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: HPSC0477.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0477.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0478.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0479.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0480.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0481.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0482.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0483.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0484.pdf | 8 Jan 2018 |
| Building Plan Approval (IOD)File: HPSC0485.pdf | 8 Jan 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: IOD.pdf | 8 Jan 2018 |
| Declaration in FORM BFile: Form B.pdf | 8 Jan 2018 |
| Proforma of Allotment letterFile: Agreement Draft_Shree Gaurang.pdf | 8 Jan 2018 |
| Proforma of Allotment letterFile: Draft of allotment letter_Allotee to Developer.pdf | 8 Jan 2018 |
| Proforma of Allotment letterFile: Draft of allotment letter_Developer to Allotee.pdf | 8 Jan 2018 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| NAVGEETA CHS | RAM WADI NAUPADA THANE-400602 | 34 | Completed | Mar 2017 | Late, Apr 2017 |
| RAMDAS NIWAS | PLOT NO 18 BRAHMAN SOCIETY NAUPADA THANE- 400602 | 12 | Completed | Aug 2016 | Jan 2016 |
| AUNSH | PLOT NO 32 BRAHMAN SOCIETY NAUPADA THANE - 400602 | 12 | Completed | Jan 2015 | Sep 2014 |
| SHRINIWAS CHS LTD | BAJI PRABHU DESHPANDE MARG VISHNU NAGAR NAUPADA THANE- 400602 | 15 | Completed | Jan 2015 | Late, Apr 2015 |
| VIKAS APARTMENT | RAM WADI NAUPADA THANE- 400602 | 15 | Completed | May 2014 | Jul 2013 |
| SUBHECHHA CHS LTD | SWAMI VIVEKANAND ROAD BHASKAR COLONY NAUPADA THANE- 400602 | 63 | Completed | Feb 2014 | Late, Nov 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 32 filed documents as one ZIP, foldered, with a manifest
Keep SHREE GAURANG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAUPADA7,600+ in Thane
Filed coordinates, straight-line distance. 302 registered projects within 2 km.
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: GAURANG ASSOCIATES
GAURANG ASSOCIATES has 3 registrations on MahaRERA, including TULSI VRINDAVAN SOCIETY and ANTARNAD. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SHREE GAURANG shows as registration revoked on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREE GAURANG is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GAURANG?
The registered promoter entity is GAURANG ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GAURANG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHREE GAURANG?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SHREE GAURANG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GAURANG?
The professionals named in the filing: Architect: JITENDRA MUKADAM; Engineer: RAJAN CHANDRAKANT TIPNIS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GAURANG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback