Home / Browse projects / Pune, Maharashtra / Shree Ganesh Times Square
Shree Ganesh Times Square
By GOBIND BUILDERS & DEVELOPERS
RG-MH-93817 · RERA P52100019350 · Last updated on MahaRERA portal: 29 Nov 2024
Source: official MahaRERA filing
Red flags
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Ganesh Times Square is a Commercial project by GOBIND BUILDERS & DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100019350 on 23 Jan 2019. The registration is recorded completed; possession was promised by 30 Jun 2021.
At a glance
Project
- NameShree Ganesh Times Square
- TypeCommercial
- Location
- wakad
- Near Poona Bakery
- Mulshi
- Pune
- 411057
- Pincode411057
- RERA no.P52100019350
- ReraGenie IDRG-MH-93817
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jan 2019
- Promised completion30 Jun 2021
- Revised completionNone
- Buildings2 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Ganesh Times square | NA | 8 | 0 | 0 | 0 | 0 |
| Shree ganesh Times Square | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 85%.
Shree Ganesh Times square73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Shree ganesh Times Square0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 70% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Yojana Architects |
| Engineer | Omkar Construction |
| Chartered Accountant | A N J K & CO LLP |
| Partner | Role in project |
|---|---|
| GOBIND BUILDERS & DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to unprecedent COVID-19 (Corona Virus) Pandemic and consequent nation-wide lockdown. In this Force Majeure period the construction activities of the given project have been severely impacted and had come to stand still. The situation further aggravated to break in supply chain of construction materials, shortage of labors at construction site due to migration, crunch in cash flow due to impact of sale etc. Also, the administrative offices of Pune Municipal Corporation and other concerned authorities were closed due to pandemic and later carried out with limited number of employees/staffs w
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100019350 up to 30/06/2024.
Reason as filed by the promoterSub: Extension to the project: Shree Ganesh Times Square, bearing Registration No. P52100019350. We, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100019350 up to 31/12/2023. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Aug 2024
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 29 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 26 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate 2.pdf | 17 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate 3.pdf | 17 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final.pdf | 17 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Form2A 22-23.pdf | 7 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 3 Feb 2024 |
| Declaration in FORM BFile: Form B -Declaration by promoter_11zon.pdf | 20 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Form2A 22-23.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 18 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 18 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 18 Dec 2023 |
| Certificates of CA (Form 3)File: CA Certificate Signed_11zon.pdf | 18 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectCertificte_compressed.pdf | 14 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf | 14 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Form2A21-22.pdf | 14 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosre Signed.pdf | 14 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Signed.pdf | 14 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate wakad.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 13 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Project Shree Ganesh Times Square_compressed.pdf | 21 Nov 2022 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 11 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf | 11 Nov 2022 |
| Layout approvalFile: Layout approval_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: Building Plans 1_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: Building Plans 2_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: Building Plans 3_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: Building Plans 4.pdf | 10 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Layout approval_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: Building Plans 1_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: Building Plans 2_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: Building Plans 3_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: Building Plans 4.pdf | 10 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 10 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Ganesh Times Square Architect Certificate.pdf | 10 Nov 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Part Ground Floor.pdf | 10 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 RERA FY 19-20_compressed.pdf | 12 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 RERA FY 20-21_compressed.pdf | 12 Jul 2021 |
| Declaration about Commencement CertificateFile: declaration.pdf | 10 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Site Engineer cert 2020.pdf | 10 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Engineer Cert 2021.pdf | 10 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY 1.pdf | 10 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 8 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf | 10 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5.pdf | 10 Feb 2020 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 17 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 17 Jan 2019 |
| Certificates of CA (Form 3)File: Ca Certificate.pdf | 17 Jan 2019 |
| Proforma of Allotment letterFile: COMMERCIAL - SHREE GANESH TIME SQUARE PDF.pdf | 17 Jan 2019 |
| Layout approvalFile: 91-2 WAKAD SANCTION Layout Plan.pdf | 15 Jan 2019 |
| Building plan approvalFile: 91-2 WAKAD SANCTION Floor Plan.pdf | 15 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: 91-2 WAKAD SANCTION Layout Plan.pdf | 15 Jan 2019 |
| Building Plan Approval (IOD)File: 91-2 WAKAD SANCTION Floor Plan.pdf | 15 Jan 2019 |
| Declaration in FORM BFile: Form B.pdf | 27 Dec 2018 |
| PAN CardFile: pan card.pdf | 21 Sep 2018 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 17 Sep 2018 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shree Ganesh Imperia Square | Survey No 175 Part Wakad Pune 411057 | 27 | Completed | Apr 2018 | Mar 2018 |
| SHREE GANESH IMPERIA | SURVEY NO 175 PART WAKAD PUNE 411057 | 174 | Completed | Sep 2017 | Jul 2017 |
| SHREE GANESH GRACELAND | SURVEY NO 8 PART RAHATNI PUNE 411017 | 157 | Completed | Sep 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep Shree Ganesh Times Square on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Poona Bakery13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: GOBIND BUILDERS & DEVELOPERS
GOBIND BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including SHREE GANESH ACE ARCADE and Shree Ganesh Times Square. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shree Ganesh Times Square is delayed beyond 30 Jun 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Ganesh Times Square?
The registered promoter entity is GOBIND BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Ganesh Times Square?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Ganesh Times Square?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Ganesh Times Square?
The professionals named in the filing: Architect: Yojana Architects; Engineer: Omkar Construction; Chartered Accountant: A N J K & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Ganesh Times Square?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.