Home / Browse projects / Nagpur, Maharashtra / SHREE GANESH SANIDHYA

Completed No litigation declared Residential / Group Housing project

SHREE GANESH SANIDHYA

By SACHANI DEVELOPERS LLP

RG-MH-59056 · RERA P50500024420 · Last updated on MahaRERA portal: 19 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

SHREE GANESH SANIDHYA is a Residential / Group Housing project by SACHANI DEVELOPERS LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500024420 on 12 Feb 2020. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameSHREE GANESH SANIDHYA
  • TypeResidential / Group Housing
  • Location
    • SHREE GANESH NAGARI NEAR PATEL PETROL PUMP
    • KORADI ROAD
    • BOKHARA
    • Bokhara
    • Nagpur (Rural)
    • Nagpur
    • 441111
  • Pincode441111
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500024420
  • ReraGenie IDRG-MH-59056

Builder

  • NameSACHANI DEVELOPERS LLP
  • Entity typePartnership
  • PartnerHITESH PAHILAJ SACHANI

Key dates

this monthRegisteredFeb 2020PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2020
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GANESH SANDIHYANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

SHREE GANESH SANDIHYA: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities16

As on 19 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Covered ParkingYes50%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,669 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2328.0
Proposed, not sanctioned2,328 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK, AKARSHAN BUSIPLEX, 26, CENTRAL BAZAR ROAD, RAMDASPETH, NAGPUR, MAHARSHATRA 440010

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RITESH SUTHAR
ArchitectAR NISHANT KOSHAL
EngineerAbhay Kumbalwar
Chartered AccountantCA Sudhir Dara
Chartered AccountantCA Saroj Vidhani
PartnerRole in project
SACHANI DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2023

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shree Ganesh Northstar_RERA Form-5_.pdf19 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: DocScanner 02-May-2023 4-24 pm.pdf24 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Sanidhya.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf25 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf25 Jan 2023
Disclosure of sold/ booked inventoryFile: Booked Inventory .pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3.pdf24 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ganesh Sanidhya-FORM-3_Dec-22.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sanidhya - Form-1_Apr-22.pdf14 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANIDHYA-from 1-OCT-22.pdf14 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SANIDHYA-from 2-OCT-22.pdf14 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Shree Ganesh Sanidhya form5Mar-22.pdf14 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SANIDHYA-from 2A-OCT-22.pdf14 Jan 2023
Disclosure of sold/ booked inventoryFile: SANIDHYA - SOLD-UNSOLD-MAR-22.pdf14 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree ganesh Sanidhya form5.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shree Ganesh Sanidhya form5Mar-21.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shree Ganesh Sanidhya form5Mar-22.pdf14 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2_11zon.pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: 1_11zon.pdf29 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE GANESH.pdf21 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241658511_For_Asset_Based_Search_07_07_2022_16_29_59_144.pdf7 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_Shree ganesh sanidhya.pdf25 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Ganesh Sanidhya -March-22.pdf23 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jan 2020 Architect Certificate (1).pdf15 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jan 2020 Architect Certificate (1).pdf15 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 2022 (2).pdf15 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Jan 2022.pdf15 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_SHREE GANESH_DEC-21.pdf15 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Shree Ganesh Sanidhya.pdf15 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Ganesh Sanidhya-Sep-21.pdf16 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Shree ganesh sanidhya-sep-21.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Shree Ganesh Sanidhya-Sep-21.pdf12 Oct 2021
Disclosure of sold/ booked inventoryFile: SOLD booked inventory-Shree Ganesh Sanidhya-sep-21.pdf12 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Shree Ganesh Sanidhya-Sep-21.pdf8 Oct 2021
Details of encumbrancesFile: No Encumbrance Certificate.pdf14 Aug 2021
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr March 20.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr June 20.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr Sept 20.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr Dec 20.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr March 21.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr June 21.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter March 20_compressed.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter June 20 (2)_compressed.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter September 20_compressed.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter December 20_compressed.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter March 21_compressed.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 quarter June 21_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Certificate No 1-compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 2_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 3_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 4_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 5_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 6_compressed.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: SD_Sold_Book_Inventory.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 March 20.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 20.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sept 20.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec 20.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 March 21.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 21.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 2019-20.pdf14 Aug 2021
Proforma of Allotment letterFile: Allotment Letter .pdf14 Aug 2021
Proforma of Allotment letterFile: Agreement for Sale_R-47.pdf14 Aug 2021
Declaration in FORM BFile: DECLARATION FORM B.pdf5 Feb 2020
PAN CardFile: PAN SD LLP.pdf4 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_R47.pdf29 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf29 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31122019.pdf7 Jan 2020
Layout approvalFile: Layout Plan.pdf23 Dec 2019
Building plan approvalFile: Plan I.pdf23 Dec 2019
Building plan approvalFile: Plan II.pdf23 Dec 2019
Copy of the legal title reportFile: TITLE REPORT SANIDHYA.pdf23 Dec 2019
Details of encumbrancesFile: NO ENCUMBRANCES.pdf23 Dec 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf23 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan I.pdf23 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan II.pdf23 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: PERMIT-.pdf23 Dec 2019
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf23 Dec 2019

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GANESH SANIDHYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KORADI ROAD, BOKHARA2,800+ in Nagpur

2 kmSHREE GANESH SANIDHYACompleted 20Lapsed / revoked 13Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SACHANI DEVELOPERS LLP

SACHANI DEVELOPERS LLP has 1 registration on MahaRERA, including SHREE GANESH SANIDHYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SHREE GANESH SANIDHYA is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GANESH SANIDHYA?

The registered promoter entity is SACHANI DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GANESH SANIDHYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GANESH SANIDHYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GANESH SANIDHYA?

The professionals named in the filing: Architect: AR RITESH SUTHAR; Architect: AR NISHANT KOSHAL; Engineer: Abhay Kumbalwar; Chartered Accountant: CA Sudhir Dara; Chartered Accountant: CA Saroj Vidhani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GANESH SANIDHYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GANESH SANIDHYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GANESH SANIDHYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.