Home / Browse projects / Nagpur, Maharashtra / Flamingo Residency 1

Registered No litigation declared Residential / Group Housing project

Flamingo Residency 1

By Hakimi Construction Private Limited

RG-MH-64518 · RERA P50500051701 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2033Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
285 of 332Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Flamingo Residency 1 is a Residential / Group Housing project by Hakimi Construction Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500051701 on 27 Jun 2023. Possession is promised by 31 Mar 2033. 47 of the 332 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameFlamingo Residency 1
  • TypeResidential / Group Housing
  • Location
    • Smruti Nagar Rd
    • Smruti Nagar
    • Bokhara
    • Nagpur (Rural)
    • Nagpur
    • 441111
  • Pincode441111
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500051701
  • ReraGenie IDRG-MH-64518

Builder

  • NameHakimi Construction Private Limited
  • Entity typeCompany
  • DirectorMansoor Saifuddin Dama

Key dates

this monthRegisteredJun 2023PromisedMar 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2033
  • Revised completionNone
  • Buildings2 building records
  • Documents filed99 files

Current status

14%47 of 332 units booked
5.9%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA13131478155
Wing BNA13131689177

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

Wing A47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes5%
Storm Water DrainsYes5%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes3%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed364

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots364
Open Space364
BuildingOpen SpaceTotal
Wing A164164
Wing B200200

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,998 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on29 May 2025

Approvals and building plan

Sanctioning authorityMaharashtra Housing And Area Development Authority
Permissible FSI15488.06
Proposed, not sanctioned15,488 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPushpak Plaza, New Itwari Rd, Near Gandhi Putla, Itwari, Nagpur
Estimated costRs 63.35 cr
Cost incurredRs 3.71 cr
Work done5.86%
BuildingWingEstimatedIncurred
Wing ANARs 30.01 crRs 3.71 cr
Wing BNARs 30.01 cr-
-NARs 3.33 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr ALOK LUNIA
ArchitectMansoor Dama
EngineerVicky Dashrath Shingne
EngineerAshfaq Husain Kanchwala
EngineerALI ASGHER ZAKI
Chartered AccountantCA Parvez Ali
Chartered AccountantCA Nooruddin Husain
Chartered AccountantSonali Singhal
PartnerRole in project
Hakimi Construction Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2033

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1- flamingo residency.pdf6 Jun 2026
Withdrawal Update Form 2File: form 2- flamingo.pdf6 Jun 2026
Withdrawal Update Form 3File: form 3- flamingo_compressed.pdf6 Jun 2026
Withdrawal Update Form 1File: form 1 flamingo.pdf6 Mar 2026
Withdrawal Update Form 2File: form 2 flamingo.pdf6 Mar 2026
Withdrawal Update Form 3File: form 3 flamingo_compressed.pdf6 Mar 2026
Withdrawal Update Form 1File: Form-1 Flamingo.pdf18 Jan 2026
Withdrawal Update Form 2File: form 2 - flamingo.pdf18 Jan 2026
Withdrawal Update Form 3File: form 3-flamingo (1)_compressed.pdf18 Jan 2026
Form 5 (FY 2024-2025)File: form 5- hakimi construction.pdf18 Jan 2026
Withdrawal Update Form 1File: Form1 flamingo (1).pdf2 Sep 2025
Withdrawal Update Form 2File: Form2 famingo.pdf2 Sep 2025
Withdrawal Update Form 3File: Form3 flamingo (1)_compressed.pdf2 Sep 2025
Withdrawal Update Form 1File: Final FORM 1 APRIL24.pdf10 Jun 2025
Withdrawal Update Form 2File: 19072024 Engineer Certificate (1).pdf10 Jun 2025
Withdrawal Update Form 3File: Form 3 April June 24_compressed.pdf10 Jun 2025
Form 2A (FY 2023-2024)File: Form-2A Hakimi 2024.pdf10 Jun 2025
Form 1File: Form1 Jan to Mar25.pdf2 Jun 2025
Form 2File: Form2 Jan to marc25.pdf2 Jun 2025
Form 3File: Form3 Jan-march25_compressed.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold and booked inventory_compressed.pdf2 Jun 2025
Form 5 (FY 2023-2024)File: Form-5 Flamingo 23-24.pdf2 Jun 2025
Form 1File: FORM-1 JULY-SEP23.pdf24 May 2025
Form 2File: FORM-2 JULY-SEP23.pdf24 May 2025
Form 3File: FORM-3 JULY-SEP23.pdf24 May 2025
Form 1File: FORM-1 OCT-DEC23.pdf24 May 2025
Form 2File: FORM-2 OCT-DEC23.pdf24 May 2025
Form 3File: FORM-3 OCT-DEC23.pdf24 May 2025
Form 1File: FORM-1 JAN-MAR24.pdf24 May 2025
Form 2File: FORM-2 JAN-MAR24.pdf24 May 2025
Form 3File: FORM-3 JAN-MAR24.pdf24 May 2025
Form 1File: FORM-1 APR-JUNE24.pdf24 May 2025
Form 2File: FORM-2 APR-JUNE24.pdf24 May 2025
Form 3File: FORM-3 APLR-JUNE24.pdf24 May 2025
Form 1File: Form1 July to sep24.pdf24 May 2025
Form 2File: Form2 Jul to sep24.pdf24 May 2025
Form 3File: FORM-3 JULY-SEP24.pdf24 May 2025
Form 1File: Form1 Oct to Dec24.pdf24 May 2025
Form 2File: Form2 Oct to dec24.pdf24 May 2025
Form 3File: FORM-3 OCT-DEC24.pdf24 May 2025
Form 124 May 2025
Form 224 May 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) (1).pdf24 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 july-sep 2024 HAKIMI_compressed.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 oct-dec 2024 HAKIMI_compressed.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form- 5 (23-24 )hakimi.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1 JUL-SEP23.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1 OCT23.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1 JAN24.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1 APRIL24.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 19072024 Engineer Certificate (1).pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 April June 24_compressed.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 july-sep23.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 oct-dec23.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Jan-march24.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 April-june24.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 July-sep23.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 oct-dec23 (1).pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 jan-march24 (1).pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 july-sep23.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Oct-dec23.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Jan-march24.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 July-sep23.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Oct-Dec23.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 jan-march24.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 July-sep23_compressed.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Oct -dec23_compressed.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jan to Mar 24_compressed.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122023 Form 1 Architects Certificate Signed.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122023 Form 2 Engineers Certificate Signed.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31122023 Form 3 CA Certificate Signed.pdf12 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200271072657_For_Asset_Based_Search_10_06_2023_16_09_57_961.pdf10 Jun 2023
Deviation Report with respect to Allotment letterFile: Allotment Deviation Report.pdf10 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Agreement Deviation Report.pdf10 Jun 2023
Details of encumbrances concerned to FinanceFile: Legal and Financial Encumberances RERA.pdf6 Jun 2023
Details of encumbrances concerned to LegalFile: Legal and Financial Encumberances RERA.pdf6 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Flamingo Residency 1 Commencement Certificate.pdf6 Jun 2023
Declaration about Commencement CertificateFile: DPR 01 Commencement Certificate DECLERATION.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf6 Jun 2023
Copy of the legal title reportFile: DPR 01 Title Report RERA_compressed.pdf17 May 2023

How this compares with Nagpur

14%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Flamingo Residency 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Smruti Nagar2,800+ in Nagpur

2 kmFlamingo Residency 1Completed 14Lapsed / revoked 4Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Hakimi Construction Private Limited

Hakimi Construction Private Limited has 1 registration on MahaRERA, including Flamingo Residency 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Flamingo Residency 1 is delayed beyond 31 Mar 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Flamingo Residency 1?

The registered promoter entity is Hakimi Construction Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Flamingo Residency 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Flamingo Residency 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Flamingo Residency 1?

The professionals named in the filing: Architect: Ar ALOK LUNIA; Architect: Mansoor Dama; Engineer: Vicky Dashrath Shingne; Engineer: Ashfaq Husain Kanchwala; Engineer: ALI ASGHER ZAKI; Chartered Accountant: CA Parvez Ali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Flamingo Residency 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Flamingo Residency 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Flamingo Residency 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.