ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / The Bellagio

Registered No litigation declared Residential / Group Housing project

The Bellagio

By DADA PROPERTIES PRIVATE LIMITED

RG-MH-84048 · RERA P50500053934 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 15%
127 of 134Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

The Bellagio is a Residential / Group Housing project by DADA PROPERTIES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500053934 on 11 Dec 2023. Possession is promised by 31 Mar 2029. 7 of the 134 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Bellagio
  • TypeResidential / Group Housing
  • Location
    • KORADI ROAD
    • MAHALAXMI CITY
    • Bokhara
    • Nagpur (Rural)
    • Nagpur
    • 441111
  • Pincode441111
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053934
  • ReraGenie IDRG-MH-84048

Builder

  • NameDADA PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorMR DHIRENDRA K GUPTA

Key dates

this monthRegisteredDec 2023PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed116 files

Current status

5%7 of 134 units booked
26.1%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK 18-B1 -FREESIA BNA151590090
BLOCK 18-B2 -FREESIA ANA151544044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 15%.

BLOCK 18-B1 -FREESIA B28%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK 18-B2 -FREESIA A29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed532

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots532
Open Space532
BuildingOpen SpaceTotal
BLOCK 18-B1 -FREESIA B356356
BLOCK 18-B2 -FREESIA A176176

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,088 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI19319.87
Proposed, not sanctioned19,320 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR MANISH CHAMBERS PREMISES CO OPERATIVE SOCIETY LTD SONAWALA ROAD GOREGAON EAST MUMBAI 400063
Estimated costRs 11,600
Cost incurredRs 3,030
Work done26.12%
BuildingWingEstimatedIncurred
BLOCK 18-B1 -FREESIA BNARs 5,600Rs 1,440
BLOCK 18-B2 -FREESIA ANARs 5,600Rs 1,440
-NARs 400Rs 150

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR ASHWINI DURGE Durge
EngineerMR PANKAJ ARYA
Chartered AccountantBharat Singhal & Co
PartnerRole in project
DADA PROPERTIES PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500225VIJAY JANRAO WAKODEDADA PROPERTIES PRIVATE LIMITED23/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form V .pdf2 May 2026
Withdrawal Update Form 1File: Arch Certificate.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf28 Apr 2026
Withdrawal Update Form 3File: CA Certificate_March-24.pdf28 Apr 2026
Form 1File: Form 1.pdf20 Jan 2026
Form 2File: Form 2.pdf20 Jan 2026
Form 3File: Form - 3.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Form - 3.pdf20 Jan 2026
Form 1File: Form 1.pdf20 Oct 2025
Form 2File: Form 2.pdf20 Oct 2025
Form 3File: Form - 3.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form - 3.pdf20 Oct 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: Form 3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Invetory.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_DPPL_March-25.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_DPPL_March-25.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anneuxure C_DPPL.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anneuxure C_DPPL.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_DPPL_March-24.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2(A)March-25_DPPL.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2(A)March-25_DPPL.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2(A)March-25_DPPL.pdf23 May 2025
Form 1File: Arch_DPPL_March-25.pdf23 May 2025
Form 2File: Anneuxure C_DPPL.pdf23 May 2025
Form 3File: Annexure D_DPPL.pdf23 May 2025
Form 1File: Annexure_B_DPPL.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DPPL_Dec_CA.pdf20 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anneuxure C_DPPL.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificat-53934.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A .pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificat-53934.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A .pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form V 23-24.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form V 23-24.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_March-24.pdf29 Jun 2024
Declaration about Commencement CertificateFile: APPENDIX -F''.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ArchcertDPPL_28112023.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 EngCertDPPL_28112023.pdf2 Dec 2023
Building plan approvalFile: ANNEXURE 5- TYPICAL PLANS-1.pdf21 Nov 2023
Building plan approvalFile: ANNEXURE 5- TYPICAL PLANS-1.pdf21 Nov 2023
Building plan approvalFile: Annexure-4- Parking Plan_Marked inblue cloud.pdf21 Nov 2023
Layout approvalFile: ANNEXURE 1- Area Declaration.pdf21 Nov 2023
Copy of Layout Approval (in case of layout)File: ANNEXURE 1- Area Declaration.pdf21 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: ANNEXURE 5- TYPICAL PLANS-1.pdf21 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: ANNEXURE 5- TYPICAL PLANS-1.pdf21 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Annexure-4- Parking Plan_Marked inblue cloud.pdf21 Nov 2023
Building plan approvalFile: Ground floor mgr_NOV23.pdf3 Nov 2023
Building plan approvalFile: Pi7_Typical_floor_mgr-NOV23.pdf3 Nov 2023
Layout approvalFile: 3 Copy of Layout Approval (in case of layout).pdf3 Nov 2023
Copy of Layout Approval (in case of layout)File: 3 Copy of Layout Approval (in case of layout).pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground floor mgr_NOV23.pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Pi7_Typical_floor_mgr-NOV23.pdf3 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: DPPL Query reply.pdf3 Nov 2023
Declaration about Commencement CertificateFile: NMRDA Confirmation for RERA_26102023.pdf3 Nov 2023
Layout approvalFile: Demarcated Sanction Layout_rera.pdf20 Oct 2023
Layout approvalFile: LAYOUT_GREEN_BLOCK18 MARKED.pdf20 Oct 2023
Building plan approvalFile: Layout demarcating BUA_Project Area_Building Block.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: Demarcated Sanction Layout_rera.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: LAYOUT_GREEN_BLOCK18 MARKED.pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout demarcating BUA_Project Area_Building Block.pdf20 Oct 2023
Declaration about Commencement CertificateFile: DPPL_CC_Tabform.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate.pdf3 Oct 2023
Other - FinanceFile: Collaboration Agreement Freesia A.pdf22 Sep 2023

How this compares with Nagpur

5%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Bellagio on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHALAXMI CITY2,800+ in Nagpur

Builder: DADA PROPERTIES PRIVATE LIMITED

DADA PROPERTIES PRIVATE LIMITED has 1 registration on MahaRERA, including The Bellagio. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if The Bellagio is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Bellagio?

The registered promoter entity is DADA PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Bellagio?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Bellagio?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Bellagio?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Bellagio?

The professionals named in the filing: Architect: MR ASHWINI DURGE Durge; Engineer: MR PANKAJ ARYA; Chartered Accountant: Bharat Singhal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Bellagio?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Bellagio. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Bellagio to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.