Home / Browse projects / Pune, Maharashtra / SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY

Registered No litigation declared Others project

SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY

By D&T PROPERTIES UNIT-3

RG-MH-31503 · RERA P52100079838 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY is a Others project by D&T PROPERTIES UNIT-3 in Pune, Maharashtra, registered with MahaRERA as P52100079838 on 27 Mar 2025. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameSHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY
  • TypeOthers
  • Location
    • NEAR BADHAI SWEET CHOWK
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • RERA no.P52100079838
  • ReraGenie IDRG-MH-31503

Builder

  • NameD&T PROPERTIES UNIT-3
  • Entity typePartnership
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETYNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SOCIETY OFFICEYes0%

Parking filed542

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots542
Closed/Covered271
Open Space271

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,720 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETYKothrudPune

Approvals and building plan

Permissible FSI12886.06
Proposed, not sanctioned2,805 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBUSINESS SQUARE PLOT NO 57, MAYUR COLONY, NEXT TO JOG HIGH SCHOOL, KOTHRUD 411038

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RUPESH JAMKHINDIKAR
EngineerAJAY BHILARY
Chartered AccountantJ A PATEL & CO
PartnerRole in project
D&T PROPERTIES UNIT-3-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Amey31122025.pdf21 May 2026
Form 2File: Ameya-Form 2-31122025.pdf21 May 2026
Form 3File: Amey Form 3 - 31122025.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 31122025 Amey.pdf21 May 2026
Form 1File: Form 1 Amey 31032026.pdf21 May 2026
Form 2File: Ameya-Form 2-31032026.pdf21 May 2026
Form 3File: Amey Form 3 - 31032026.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 31032026 Amey.pdf21 May 2026
Form 1File: Shree Ganesh Form 1.PDF30 Dec 2025
Form 2File: Form 2 Ganesh Complex 30062025.PDF30 Dec 2025
Form 3File: Form 3 30062025 SGC.PDF30 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE SGC 30062025.pdf30 Dec 2025
Form 1File: Shree Form 1 30092025.PDF30 Dec 2025
Form 2File: Shree Form 2 30092025.PDF30 Dec 2025
Form 3File: Form 3 30092025 SGC.PDF30 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE SGC 30092025.pdf30 Dec 2025
Form 1File: Forn 1 31032025.pdf19 Jun 2025
Form 2File: Form 2 SGC 31032025.pdf19 Jun 2025
Form 3File: Form 3 - 31032025.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf19 Jun 2025
Building plan approvalFile: Plan 2.pdf21 Mar 2025
Building plan approvalFile: Paln 3.pdf21 Mar 2025
Building plan approvalFile: Plan 4.pdf21 Mar 2025
Copy of the legal title reportFile: Legal Title Report_Ganesh Complex.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Paln 3.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf21 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Adobe Scan 25 Feb 2025.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ganesh Complex Rev.pdf15 Feb 2025
Layout approvalFile: Layout.pdf12 Feb 2025
Building plan approvalFile: Plan 3.pdf12 Feb 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf12 Feb 2025
Proforma of Allotment letterFile: Allotment Letter Shree Ganesh Complex Society.pdf31 Jan 2025
CERSAI detailsFile: Cerasai Declaration.pdf31 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Builder SGC.pdf31 Jan 2025
Proforma of Agreement for saleFile: model of agreement.pdf31 Jan 2025
Declaration in FORM BFile: Ganesh Complex Builder Affidivate Form B.pdf23 Jan 2025
Other - LegalFile: ANNEXURE A Declaration Undertaking Unit 3.PDF16 Jan 2025
Other - FinanceFile: Declaration cum undertaking Unit 3.PDF16 Jan 2025
Other - TechnicalFile: ANNEXURE A Declaration Undertaking Unit 3.PDF16 Jan 2025
PAN CardFile: D And T Properties Unit-3 Pan Card.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: SELF DECLARATION REGARDING ENCUMBRANCES Unit 3.PDF15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R1 RERA Form I 231024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ganesh Complex Engg Certificate 08012025.pdf15 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC SGC.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Unit 3.PDF15 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTI FICATE Unit 3.PDF15 Jan 2025
CERSAI detailsFile: CERSAISearch Report.pdf15 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation with copy of Allotment Unit 3.PDF15 Jan 2025
Details of encumbrances concerned to LegalFile: SELF DECLARATION REGARDING ENCUMBRANCES Unit 3.PDF15 Jan 2025
Other - TechnicalFile: CC Verification.pdf15 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Model copy of Agreement Unit 3.PDF15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Abhishek Deshpande Unit 3.PDF15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Prasad Deshpande Unit 3.PDF15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Unit 3.PDF15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Unit 3.PDF15 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured Unsecured Fin Unit 3.PDF15 Jan 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VIBHAS CHSPlot No 3 Survey No 134 Hissa No 6 7A 8A CTS No 753 Kothrud Pune 41103813OngoingDec 2027Dec 2027
SEETA CHSPlot No 3 Survey No 134 Hissa No 6 7A 8A CTS No 753 Kothrud Pune 41103820OngoingDec 2027Dec 2027
PRATHAMESH CHSPLOT NO.55 SNO.120 CTS NO.937 VILLAGE-KOTHRUD TALUKA- AHVELI DIST-PUNE-41103830OngoingDec 2027Dec 2027
MOUNTAINVIEW CHSCTS No 2850 Survey No 103A Hissa No 7 2 A Bhamburda Shivaji Nagar Pune 41101692OngoingDec 2026Dec 2026

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

Builder: D&T PROPERTIES UNIT-3

D&T PROPERTIES UNIT-3 has 3 registrations on MahaRERA, including Seeta Co-operative Housing Society Limited and Vibhas Co-operative Housing Society Limited. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY?

The registered promoter entity is D&T PROPERTIES UNIT-3, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY?

The professionals named in the filing: Architect: AR RUPESH JAMKHINDIKAR; Engineer: AJAY BHILARY; Chartered Accountant: J A PATEL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GANESH COMPLEX CO-OPERATIVE HOUSING SO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.