Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
68 of 88Construction stages doneacross 8 buildings; furthest along: Installation of Lifts, 75%
211 of 447Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

SHREE GAJANAN FORTUNE CITY is a Others project by ARUN BALU PATIL in Thane, Maharashtra, registered with MahaRERA as P51700013810 on 25 Oct 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 236 of the 447 units on this registration are recorded sold or booked, and 68 of 88 construction stages are filed complete.

At a glance

Project

  • NameSHREE GAJANAN FORTUNE CITY
  • TypeOthers
  • Location
    • KALYAN
    • Khadavali
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700013810
  • ReraGenie IDRG-MH-77443

Builder

  • NameARUN BALU PATIL
  • Entity typeIndividual
  • Other registrations3 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2017First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2024)
  • Buildings8 building records
  • Documents filed126 files

Current status

53%236 of 447 units booked
81.3%Work done, per cost certificate

Figures as on 10 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA55301040
BUILDING BNA5559059
BUILDING CNA5559059
BUILDING DNA5540040
BUILDING ENA55561066
BUILDING FNA5564064
BUILDING GNA5553053
BUILDING E1NA88561066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 10 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

68 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Installation of Lifts, at 75%.

BUILDING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING E80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
BUILDING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes85%
Street LightingYes90%
Community BuildingsYes85%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes85%
Open ParkingYes85%

Parking filed977

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots977
Open Space977
BuildingOpen SpaceTotal
BUILDING A140140
BUILDING B140140
BUILDING C140140
BUILDING D140140
BUILDING E140140
BUILDING F140140
BUILDING G137137

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area17,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
KASHIVALE KALURAM DATTUKalyanThane
RAVINDRA SADASHIOV KASHIVALEKalyanThane

Approvals and building plan

Sanctioning authorityNAGAR RACHNA THANE
Permissible FSI23421.77
Proposed, not sanctioned23,422 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD SUCHAK NIWAS CTS NO /3203 MURBAD ROAD KALYAN WEST 421301
Estimated costRs 51.26 cr
Cost incurredRs 41.68 cr
Work done81.32%
BuildingWingEstimatedIncurred
-NARs 8.98 crRs 7.89 cr
BUILDING ENARs 7.68 crRs 6.54 cr
BUILDING E1NARs 7.68 crRs 6.76 cr
BUILDING DNARs 5.82 cr-
BUILDING FNARs 5.17 crRs 4.93 cr
BUILDING GNARs 5.12 crRs 4.74 cr
BUILDING BNARs 4.07 crRs 4.07 cr
BUILDING CNARs 4.07 crRs 4.07 cr
BUILDING ANARs 2.69 crRs 2.69 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN DILIP GULVE
EngineerMANOHAR VISHNU PATIL
Chartered AccountantVINESH AHUJA
Chartered AccountantGIRISH TARWANI
Chartered AccountantRAHUL BHATIA
Chartered AccountantS U Radhakrishnani
PartnerRole in project
ARUN BALU PATIL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024800Dec 2024 → Dec 2026

Reason as filed by the promoter.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A 23-24.pdf10 Sep 2026
Form 5 (FY 2023-2024)File: 23-24.pdf10 Sep 2026
Form 5 (FY 2022-2023)File: 22-23.pdf10 Sep 2026
Form 5 (FY 2021-2022)File: 21-22-2.pdf10 Sep 2026
Form 5 (FY 2020-2021)File: 20-21.pdf10 Sep 2026
Form 5 (FY 2019-2020)File: 19-20.pdf10 Sep 2026
Form 5 (FY 2018-2019)File: 18-19.pdf10 Sep 2026
Form 5 (FY 2017-2018)File: 17-18.pdf10 Sep 2026
Form 1File: form 1.pdf9 Sep 2026
Form 2File: form 2.pdf9 Sep 2026
Form 3File: FORM 3 UPLOAD.pdf9 Sep 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Sep 2026
Form 1File: form 1.pdf9 Sep 2026
Form 2File: form 2.pdf9 Sep 2026
Form 3File: FORM 3 UPLOAD.pdf9 Sep 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Sep 2026
Form 1File: form 1.pdf9 Sep 2026
Form 2File: FORM 2.pdf9 Sep 2026
Form 3File: Form 3-compressed.pdf9 Sep 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Sep 2026
Form 1File: architect.pdf9 Sep 2026
Form 2File: engineer.pdf9 Sep 2026
Form 3File: FORM 3.pdf9 Sep 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf9 Sep 2026
Withdrawal Update Form 2File: enginer.pdf9 Sep 2026
Withdrawal Update Form 3File: Form 3 Fortune (1).pdf9 Sep 2026
Form 2A (FY 2017-2018)File: 2A 19-20.pdf9 Sep 2026
Form 2A (FY 2019-2020)File: 2A 19-20.pdf9 Sep 2026
Form 2A (FY 2020-2021)File: 2A 20-21.pdf9 Sep 2026
Form 2A (FY 2021-2022)File: 2A 21-22.pdf9 Sep 2026
Form 2A (FY 2022-2023)File: 2A 22-23.pdf9 Sep 2026
Form 2A (FY 2023-2024)File: 2A 23-24.pdf9 Sep 2026
Form 2A (FY 2018-2019)File: 2A 19-20.pdf9 Sep 2026
Form 2A (FY 2024-2025)File: 2A 23-24.pdf9 Sep 2026
Form 5 (FY 2024-2025)File: FORM 5.pdf9 Sep 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 signed.pdf23 Jun 2026
Withdrawal Update Form 2File: Engineer.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 Q1.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 final_compressed.pdf23 Jun 2026
Form 1File: Form 1 signed.pdf19 Jun 2026
Form 2File: Form 2 signed.pdf19 Jun 2026
Form 3File: Form 3 signed.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sol Unsold signed.pdf19 Jun 2026
Form 1File: Form 1 signed.pdf2 Feb 2026
Form 2File: Form 2 signed.pdf2 Feb 2026
Form 3File: Form 3.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold dec 25.pdf2 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Signed.pdf27 Jul 2025
Certificates of CA (Form 3)File: Form 3 New.pdf27 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer.pdf27 Jul 2025
Certificates of CA (Form 3)File: Form 3 - 2_compressed.pdf26 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf26 Jun 2025
Other - FinanceFile: FC 2.pdf26 Jun 2025
Other - TechnicalFile: FC 2.pdf26 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Work Stage Completion Letter -AP.PDF27 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Gajanan Fortune City Engineer Certificate 1.pdf27 May 2025
Other - FinanceFile: Fortune City.pdf27 May 2025
Other - TechnicalFile: Fortune City.pdf27 May 2025
Certificates of CA (Form 3)File: Ca Certificate.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shree Gajanan Fortune City Engineer Certificate 1.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rera 2A 2022-23.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rera 2A 2021-22.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera 2A 2022-23.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera 2A 2023 -24.pdf7 Feb 2025
Declaration in FORM BFile: Form B (1).pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: sold and unsolds.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Fortune City_compressed.pdf25 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Fortune city.pdf25 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf21 Dec 2024
Certificates of CA (Form 3)File: SHREE GAJANAN FORTUNE CITY FORM 3.pdf13 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Fortune city engineer (1).pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Document 1494.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Gajanan Fortune City_compressed.pdf20 Jul 2024
Certificates of CA (Form 3)File: FORM 3 UPLOAD.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form 3 Fortune city.pdf4 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Gajanan Fortune City Engineer Certificate (2)_compressed.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jan 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
TWINS TOWERVARAP KALYAN81CompletedDec 2020Dec 2020
SAI SANSAR RESIDENCYMURBAD DEVGAON91CompletedDec 2020Dec 2020
GAJANAND PLAZAVASIND46CompletedJun 2016Late, Jul 2016

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GAJANAN FORTUNE CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN7,600+ in Thane

2 kmSHREE GAJANAN FORTUNE CICompleted 1Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: ARUN BALU PATIL

ARUN BALU PATIL has 4 registrations on MahaRERA, including SAI SANSAR RESIDENCY and SHREE GAJANAN FORTUNE CITY. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE GAJANAN FORTUNE CITY is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GAJANAN FORTUNE CITY?

The registered promoter entity is ARUN BALU PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GAJANAN FORTUNE CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GAJANAN FORTUNE CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GAJANAN FORTUNE CITY?

The professionals named in the filing: Architect: SACHIN DILIP GULVE; Engineer: MANOHAR VISHNU PATIL; Chartered Accountant: VINESH AHUJA; Chartered Accountant: GIRISH TARWANI; Chartered Accountant: RAHUL BHATIA; Chartered Accountant: S U Radhakrishnani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GAJANAN FORTUNE CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GAJANAN FORTUNE CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GAJANAN FORTUNE CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.