ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHREE ASHTAVINAYAK VASTU PRAKALPA

Completed No litigation declared Residential / Group Housing project

SHREE ASHTAVINAYAK VASTU PRAKALPA

By BALKRISHNA KASHINATH BHOIR

RG-MH-57646 · RERA P51700016873 · Last updated on MahaRERA portal: 1 Nov 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

SHREE ASHTAVINAYAK VASTU PRAKALPA is a Residential / Group Housing project by BALKRISHNA KASHINATH BHOIR in Thane, Maharashtra, registered with MahaRERA as P51700016873 on 20 Jun 2018. The registration is recorded completed; possession was promised by 30 Mar 2021.

At a glance

Project

  • NameSHREE ASHTAVINAYAK VASTU PRAKALPA
  • TypeResidential / Group Housing
  • Location
    • KATRAP ROAD
    • BELAVALI
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700016873
  • ReraGenie IDRG-MH-57646

Builder

  • NameBALKRISHNA KASHINATH BHOIR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredJun 2018PromisedMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jun 2018
  • Promised completion30 Mar 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
10NA90000
11NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

1041%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1141%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered2
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
10145
11145

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,120 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19836.7
Proposed, not sanctioned19,837 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR EAST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL M BHIRUD
PartnerRole in project
BALKRISHNA KASHINATH BHOIR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3-2019-20.pdf1 Nov 2022
Certificates of CA (Form 5)File: Form 5-2019-20.pdf1 Nov 2022
Certificates of CA (Form 3)File: Form 3-2018-19.pdf31 Oct 2022
Certificates of CA (Form 5)File: Form 5-2018-19.pdf31 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf20 Apr 2021
Certificates of CA (Form 5)File: ASHTAVINAYAK 10-11.pdf15 Oct 2018
Layout approvalFile: LAYOUT BROUCHERS-ilovepdf-compressed.pdf13 Jun 2018
Copy of Layout Approval (in case of layout)File: LAYOUT BROUCHERS-ilovepdf-compressed.pdf13 Jun 2018
Certificates of CA (Form 3)File: Download File.pdf13 Jun 2018
Proforma of Allotment letterFile: agreement for sale new.pdf6 Jun 2018
Building plan approvalFile: PLAN 2.pdf19 Apr 2018
Copy of the legal title reportFile: COPY OF LEGAL REPORT.pdf19 Apr 2018
Details of encumbrancesFile: DECLARATION OF ENCUMBRANCES DOWNLOADED FORM LAST FORM.pdf19 Apr 2018
Building Plan Approval (IOD)File: PLAN 2.pdf19 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Apr 2018
Declaration in FORM BFile: Form B 10 11 NEW.pdf19 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE 04062018.pdf19 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE 04062018.pdf19 Apr 2018
PAN CardFile: BHOIR PAN.pdf18 Apr 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE ASHTAVINAYAK VASTU PRAKALPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BELAVALI7,600+ in Thane

Builder: BALKRISHNA KASHINATH BHOIR

BALKRISHNA KASHINATH BHOIR has 3 registrations on MahaRERA, including SHREE ASHTAVINAYAK VASTU PRAKALPA and MOUNT VIEW. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE ASHTAVINAYAK VASTU PRAKALPA is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE ASHTAVINAYAK VASTU PRAKALPA?

The registered promoter entity is BALKRISHNA KASHINATH BHOIR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE ASHTAVINAYAK VASTU PRAKALPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE ASHTAVINAYAK VASTU PRAKALPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE ASHTAVINAYAK VASTU PRAKALPA?

The professionals named in the filing: Architect: SUNIL M BHIRUD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ASHTAVINAYAK VASTU PRAKALPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ASHTAVINAYAK VASTU PRAKALPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ASHTAVINAYAK VASTU PRAKALPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.