ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SHRADDHA WEST RESIDENCY

Registered No litigation declared Residential / Group Housing project

SHRADDHA WEST RESIDENCY

By SHRADDHA BUILDCON PVT LTD

RG-MH-42901 · RERA P51800049859 · Last updated on MahaRERA portal: 4 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
54 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

SHRADDHA WEST RESIDENCY is a Residential / Group Housing project by SHRADDHA BUILDCON PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049859 on 6 Mar 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 52 of the 106 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRADDHA WEST RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • MAJAS
    • JOGESHWARI EAST
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049859
  • ReraGenie IDRG-MH-42901

Builder

  • NameSHRADDHA BUILDCON PVT LTD
  • Entity typeCompany
  • DirectorsSUDHIR BALU MEHTA, RAMCHANDRA KRISHNA RALKAR

Key dates

this monthRegisteredMar 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed105 files

Current status

49%52 of 106 units booked
45.9%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRADDHA WEST RESIDENCYNA22211060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

SHRADDHA WEST RESIDENCY: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes5%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,144 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3787.39
Proposed, not sanctioned3,787 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 4,runwalanthurium retail,old gabriel factory,lbs marg,in front of veena nagar,mulund w,400080
Estimated costRs 26.00 cr
Cost incurredRs 11.93 cr
Work done45.89%
BuildingWingEstimatedIncurred
SHRADDHA WEST RESIDENCYNARs 24.70 crRs 11.34 cr
-NARs 1.30 crRs 59.66 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.S Associates
EngineerRajendra Bankar
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
SHRADDHA BUILDCON PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09102518068Dec 2025 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

EA25092638983Dec 2025 → Dec 2027

Reason as filed by the promoterThe project is substantially completed; however, some construction and finishing works are still pending. The remaining activities include completion of the pending construction works, obtaining the Occupancy Certificate (OC), final inspections, statutory/compliance requirements, project closure, documentation, and final handover. An extension is therefore required up to 31-12-2027 to complete the pending construction and statutory activities and ensure proper project closure and final handover to the concerned stakeholders.

Litigation declared1

CaseCourtStatus
26869 OF 2022/2022HIGH COURT OF BOMBAYNO ADVERSE ORDER

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on June 2026.pdf4 Sep 2026
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency June 2026.pdf4 Sep 2026
Withdrawal Update Form 3File: Form 3 - Shraddha West Residency as on June 2026.pdf4 Sep 2026
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on June 2026.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency June 2026.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 - Shraddha West Residency as on June 2026.pdf25 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A - FY 25-26 SHRADDHA WEST RESIDENCY.pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on March 2026.pdf19 May 2026
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency as on March 2026.pdf19 May 2026
Withdrawal Update Form 3File: Form 3- Shraddha West Residency as on 31-03-2026.pdf19 May 2026
Layout approvalFile: Page 1 - Permissible BUA Sanctioned BUA Sanctioned Units Parking Highlighted.pdf28 Apr 2026
Building plan approvalFile: Page 2.pdf28 Apr 2026
Building plan approvalFile: Page 3.pdf28 Apr 2026
Building plan approvalFile: Page 4.pdf28 Apr 2026
Building plan approvalFile: Page 5.pdf28 Apr 2026
Form 1File: Form 1 - Shraddha West Residency as on June 2025 (SIGNED).pdf7 Mar 2026
Form 2File: Form 2 - Shraddha West Residency as on June 2025 (SIGNED).pdf7 Mar 2026
Form 3File: Form 3 - Shraddha West Residency as on June 2025 (SIGNED).pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha West Residency as on June 2025 (SIGNED).pdf7 Mar 2026
Self-declaration of Quarterly ProgressFile: Jogeshwari FCC 24022026.pdf7 Mar 2026
OthersFile: Jogeshwari Amended IOD.pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1- Shraddha West Residency as on Dec 2025.pdf2 Mar 2026
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency as on Dec 2025.pdf2 Mar 2026
Withdrawal Update Form 3File: Form 3- Shraddha West Residency as on Dec 2025.pdf2 Mar 2026
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on Sept 2025 (signed).pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency as on Sept 2025 (signed).pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 - Shraddha West Residency as on Sept 2025 (signed).pdf4 Nov 2025
Form 5 (FY 2022-2023)File: Form 5 - Shraddha West Residency FY 2024-25.pdf11 Oct 2025
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on June 2025 (SIGNED).pdf9 Oct 2025
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency as on June 2025 (SIGNED).pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 - Shraddha West Residency as on June 2025 (SIGNED).pdf9 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A FY 2022-23 Signed.pdf9 Oct 2025
Form 2A (FY 2022-2023)File: Form 2A 2022-23 & 2023-24.pdf9 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24 Signed.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2023-24 Signed.pdf9 Oct 2025
Form 1File: Form 1 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Form 2File: Form 2 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Form 3File: Form 3 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Withdrawal Update Form 1File: Form 1 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Withdrawal Update Form 2File: Form 2 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Withdrawal Update Form 3File: Form 3 - Shraddha West Residency as on June 2025 (SIGNED).pdf8 Oct 2025
Form 2A (FY 2024-2025)File: Form2A 2024 2025.pdf8 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha West Residency as on March 2025.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West Residency as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha West Residency as on 31-12-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West Residency as on 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on 31-12-2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sh west recindecy_0001.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Shraddha West Residency For FY 2023-24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SHRADDHA WEST RESIDENCY as on Sep 2024.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West Residency as on 30-09-2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on Sept 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West Residency as on 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha West Residency as on June 2024.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HH.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West Residency as on 31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha West Residency as on Dec 2023.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West residency as on 31-12-2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F 2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf27 Dec 2023
Disclosure of sold/ booked inventoryFile: C 29.pdf27 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHRADDHA WEST RESIDENCY as on March 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shraddha west residency as on Sep 2023.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on March 2023.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on June 2023.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha West Residency as on Sep 2023.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West residency as on 31-03-23.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West residency as on 30-06-23.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha West residency as on 30-09-23.pdf20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_ Shraddha West Res as on 31-03-23.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shraddha West Residency Rera I 3-7-23.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: Jogeshwari Non Encumbrance (1).pdf2 Mar 2023

How this compares with Mumbai Suburban

49%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRADDHA WEST RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI EAST6,700+ in Mumbai Suburban

2 kmSHRADDHA WEST RESIDENCYCompleted 86Lapsed / revoked 46Abeyance 1Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: SHRADDHA BUILDCON PVT LTD

SHRADDHA BUILDCON PVT LTD has 1 registration on MahaRERA, including SHRADDHA WEST RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRADDHA WEST RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRADDHA WEST RESIDENCY?

The registered promoter entity is SHRADDHA BUILDCON PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRADDHA WEST RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRADDHA WEST RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRADDHA WEST RESIDENCY?

The professionals named in the filing: Architect: S.S Associates; Engineer: Rajendra Bankar; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRADDHA WEST RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRADDHA WEST RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRADDHA WEST RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.