Runwal Avenue Wing - M

By Susneh Infrapark Private Limited

RG-MH-40777 · RERA P51800033514 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken
  • Rs 450.00 crore secured on the land, in favour of HDFC BANK LTD

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedmoved 30 months from the original
3 of 11Construction stages donefurthest along: Podiums (if any), 80%
115 of 331Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 237 documents Report an error

Runwal Avenue Wing - M is a Residential / Group Housing project by Susneh Infrapark Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033514 on 22 Feb 2022. Possession is promised by 18 Oct 2028. The completion date has moved by 30 months from the original filing. 216 of the 331 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRunwal Avenue Wing - M
  • TypeResidential / Group Housing
  • Location
    • Village Kanjur
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400042
  • Pincode400042
  • RERA no.P51800033514
  • ReraGenie IDRG-MH-40777

Builder

  • NameSusneh Infrapark Private Limited
  • Entity typeCompany
  • DirectorRamesh Parerao
  • Other registrations5 more →

Key dates

this monthRegisteredFeb 2022First promiseApr 2026Revised toOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2022
  • Promised completion18 Oct 2028
  • Revised completionRevised to 18 Oct 2028 (originally 18 Apr 2026)
  • Buildings1 building record
  • Documents filed237 files

Current status

65%216 of 331 units booked
34.5%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Runwal Avenue Wing - MNA535130922331

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 80%.

Runwal Avenue Wing - M: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure41%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes22%
Storm Water DrainsYes23%
Landscaping & Tree PlantingYes13%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes35%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed414

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots414
Closed/Covered405
Open Space9

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area147,596 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC BANK LTD
Secured amountRs 450.00 crore
CERSAI search filedYes
Declared on22 Jan 2026

Approvals and building plan

Permissible FSI16125.56
Proposed, not sanctioned16,126 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDUSIND HOUSE, 425, DADASAHEB BHADKAMKAR MARG MUMBAI - 400 004
Estimated costRs 126.06 cr
Cost incurredRs 43.55 cr
Work done34.54%
BuildingWingEstimatedIncurred
Runwal Avenue Wing - MNARs 94.92 crRs 20.95 cr
-NARs 31.14 crRs 22.59 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit
EngineerRuchi Natekar
EngineerUttam Kawathankar
EngineerWasim Shaikh
Chartered AccountantKshirsagar & Associates
Chartered AccountantM B Agarwal and Co
PartnerRole in project
Susneh Infrapark Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800022941Apr 2026 → Apr 2027

Reason as filed by the promoterMitigation

EA20042620673Apr 2026 → Oct 2028

Reason as filed by the promoterThe delay in completion of the project has occurred due to post-pandemic disruptions impacting labour availability, supply chains, and overall construction progress. Further delays were caused by the insolvency of the aluminium shuttering supplier, leading to a work halt, and the replacement of the RCC contractor due to poor performance. Additionally, recurring seasonal manpower shortages have affected execution timelines. In view of these circumstances beyond our control, we request an extension of the project completion date till 18/10/2028.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12401265Kanti Dhar DwivediSusneh Infrapark Private Limited28/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Apr 2025

Documents filed237

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 237 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Runwal Avenue - Wing I to Wing N - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 - Runwal Avenue - Wing I to Wing N - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2 - Runwal Avenue - Wing M - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2 - Runwal Avenue - Wing M - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3 - Runwal Avenue - Wing M - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3 - Runwal Avenue - Wing M - 30 June 2026.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 - Runwal Avenue Wing I to Wing N - 31 March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Runwal Avenue Tower M - 31 March 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Runwal Avenue - Wing M - Form 3 - 31 March 2026.pdf20 Apr 2026
Building plan approvalFile: Layout Plan - 34 - Section Plans Wing M.pdf27 Feb 2026
Building plan approvalFile: Layout Plan - 1 - 251125 - Wing M Highlighted.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 2 - 251125.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 3 - 251125 - Ground Floor.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 4 - 251125 - Retail-1.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 5 - 251125 - 1st Podium.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 6 - 221125 - 2nd Podium.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 7 - 251125 - 3rd Podium.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 8 - 251125 - 4th Podium.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 9 - 251125 - Podium Top Floor.pdf24 Feb 2026
Building plan approvalFile: Layout Plan - 10 - 251125 - 8th Floor Plan.pdf24 Feb 2026
Building plan approvalFile: Building Plan 25-28 - 251125 - Wing M-1.pdf24 Feb 2026
Building plan approvalFile: Building Plan 25-28 - 251125 - Wing M-2.pdf24 Feb 2026
Building plan approvalFile: Building Plan 25-28 - 251125 - Wing M-3.pdf24 Feb 2026
Building plan approvalFile: Building Plan 25-28 - 251125 - Wing M-4.pdf24 Feb 2026
Form 1File: Form 1 - Runwal Avenue_Wing-I-to-N - 31 December 2025.pdf17 Jan 2026
Form 2File: Form 2 - Runwal Avenue - Tower M - 31 December 2025.pdf17 Jan 2026
Form 3File: Form 3 - Runwal Avenue Tower M - 31 December 2025.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Inventory - Runwal Avenue - Wing M - 31 December 2025_11zon (1).pdf17 Jan 2026
Self-declaration of Quarterly ProgressFile: Declaration - Runwal Avenue.pdf17 Jan 2026
Form 2A (FY 2024-2025)File: Runwal Avenue - Wing M - Form 2A - Quality Assurance Certificate - 30 September 2025.pdf18 Oct 2025
Form 1File: Runwal Avenue Wing I to Wing N - Form 1 - 30 September 2025.pdf17 Oct 2025
Form 2File: Avenue Tower M Engineering Certificate.pdf17 Oct 2025
Form 3File: Tower M - Form 3.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory - SIPL - Wing M- 30 September 2025.pdf17 Oct 2025
Self-declaration of Quarterly ProgressFile: Runwal Avenue - I to N.pdf17 Oct 2025
Form 1File: Runwal Avenue- Wing I to N - 30 June 2025.pdf17 Jul 2025
Form 2File: Avenue Tower M - Form 2 - 30 June 2025.pdf17 Jul 2025
Form 3File: Tower M - Form 3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Runwal Avenue - M_ 30 June 2025.pdf17 Jul 2025
Self-declaration of Quarterly ProgressFile: Declration - SIPL.pdf17 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower M Engineering Certificate.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Wing M.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower M - Form 3.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Avenue_Wing-I-to-N_2025_03_Signed.pdf15 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Retail OC - Drawing_4-end_11zon.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Retail OC - Drawing_1-3_11zon (1).pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Retail OC - Drawing_4-end_11zon.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Retail OC - Drawing_1-3_11zon (1).pdf11 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Runwal Avenue OC - I to N - Ground and First Floor - 11 April 2025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Tower M Engineering Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower M - Form 3.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Avenue - M_11zon.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Avenue_Wing-I-to-N - Form 1 - 31 December 2024.pdf10 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Runwal Avenue - CC - 29 November 2024.pdf30 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2438541Amendletter_signed.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_1_1.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_5_4.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_5_3.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_5_1.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_3.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_2.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_1_2.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing_1_1.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Runwal Avenue Tower M 30092024_11zon.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Tower M Engineering Certificate 18102024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Tower M Engineering Certificate 18102024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Tower N Engineering Certificate 18102024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower M - Form 3.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Avenue_Wing I to Wing N 30092024.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Avenue - CC Revalidation 28 Aug 2024 to 27 Aug 2025.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Runwal Avenue Wing M_11zon.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Tower M Engineering Certificate 17072024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - M.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Runwal Avenue - Wing M - as on 30 June 2024_11zon.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Runwal Avenue - Wing I to Wing N - 30 June 2024.pdf8 Jul 2024
Declaration in FORM BFile: Form B - Runwal Avenue Wing M.pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Other - Technical.pdf10 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Runwal Avenue - I to N - 31-03-2024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2024 Form2 Runwal Avenue Wing M.pdf18 Apr 2024

How this compares with Mumbai Suburban

65%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal Avenue Wing - M on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund6,700+ in Mumbai Suburban

Builder: Susneh Infrapark Private Limited

Susneh Infrapark Private Limited has 6 registrations on MahaRERA, including Runwal Avenue Wing-J and Runwal Avenue Wing K. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Runwal Avenue Wing - M is delayed beyond 18 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal Avenue Wing - M?

The registered promoter entity is Susneh Infrapark Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal Avenue Wing - M?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runwal Avenue Wing - M?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runwal Avenue Wing - M?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal Avenue Wing - M?

The professionals named in the filing: Architect: Amit; Engineer: Ruchi Natekar; Engineer: Uttam Kawathankar; Engineer: Wasim Shaikh; Chartered Accountant: Kshirsagar & Associates; Chartered Accountant: M B Agarwal and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal Avenue Wing - M?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal Avenue Wing - M. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal Avenue Wing - M to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.