ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD

Registered No litigation declared Residential / Group Housing project

SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD

By D&T PROPERTIES UNIT-4

RG-MH-30837 · RERA P52100079175 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD is a Residential / Group Housing project by D&T PROPERTIES UNIT-4 in Pune, Maharashtra, registered with MahaRERA as P52100079175 on 12 Feb 2025. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameSHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • PAUD ROAD
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079175
  • ReraGenie IDRG-MH-30837

Builder

  • NameD&T PROPERTIES UNIT-4
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING-ANA110000
BUILDING-BNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

BUILDING-A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed244

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots244
Closed/Covered2
Open Space242
BuildingClosed/CoveredOpen SpaceTotal
BUILDING-A1178179
BUILDING-B16465

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,497 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
STATE BANK STAFF TORNA CHS LTDKothrudPune
STATE BANK STAFF SHVNERI CHS LTDKothrudPune

Approvals and building plan

Permissible FSI22555.77
Proposed, not sanctioned7,841 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSARTHI SUCCESS SQUARE KARVE ROAD KOTHRUD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRupesh Jamkhindkar Arckitude Studio
EngineerAjay Bhilare Structual Engg
Chartered AccountantJ A Patel & C
PartnerRole in project
D&T PROPERTIES UNIT-4-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Shivtoran 31122025.pdf21 May 2026
Form 2File: ST-Form 2-31122025.pdf21 May 2026
Form 3File: ShivToran Form 3 31122025.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 31122025 ShivToran.pdf21 May 2026
Form 1File: ST Form 1 30092025.PDF29 Dec 2025
Form 2File: ST Form 2 30092025.PDF29 Dec 2025
Form 3File: Form 3 30092025 CA Cretificate.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 30092025.PDF29 Dec 2025
Form 1File: Form 30062025.PDF6 Aug 2025
Form 2File: Form 2 Shivtoran 30062025.PDF6 Aug 2025
Form 3File: Form 3 30062025.PDF6 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 30062025.PDF6 Aug 2025
Form 1File: Form 1 31032025.PDF6 Aug 2025
Form 2File: Shivatoran Frm 2.PDF6 Aug 2025
Form 3File: Form 3 31032025.PDF6 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 31032025.PDF6 Aug 2025
Deviation Report with respect to Allotment letterFile: Devaition (1).PDF29 Jan 2025
Proforma of Allotment letterFile: Shivtoran Allotment Letter.pdf28 Jan 2025
CERSAI detailsFile: Cersai Declaration SHIVTORAN.pdf28 Jan 2025
Other - FinanceFile: Cersai Declaration SHIVTORAN.pdf28 Jan 2025
Declaration in FORM BFile: SHIVTORAN Builder Affidivat Form B.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Cedrtificate.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shivneri Torna CHS.pdf17 Jan 2025
CERSAI detailsFile: Shivtorna Cersai.pdf17 Jan 2025
Proforma of Agreement for saleFile: Shiv Torna Agreement.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Abhishek Deshpande Unit 4.PDF17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Prasad Deshpande.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vinayakumar Deshpande.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Karan TambeUnit 4.PDF17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A SHILPA BHARADE.PDF17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Unit 4.PDF17 Jan 2025
Layout approvalFile: Plan 1 - 5.pdf16 Jan 2025
Building plan approvalFile: Plan 1 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 2 - 5.pdf16 Jan 2025
Building plan approvalFile: Plan 2 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 3 - 5.pdf16 Jan 2025
Building plan approvalFile: Plan 3 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 4 - 5.pdf16 Jan 2025
Building plan approvalFile: Plan 4 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 5 - 5.pdf16 Jan 2025
Building plan approvalFile: Plan 5 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 6 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 7 - 8.pdf16 Jan 2025
Building plan approvalFile: Plan 8 - 8.pdf16 Jan 2025
PAN CardFile: Unit 4 Pan Card.pdf16 Jan 2025
Copy of the legal title reportFile: Legal Title Report - SHIVTORAN.pdf16 Jan 2025
Details of encumbrances concerned to FinanceFile: SELF DECLARATION REGARDING ENCUMBRANCES Unit 4.PDF16 Jan 2025
Copy of Layout Approval (in case of layout)File: Plan 1 - 5.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shivtoran Engg Certificate New.pdf16 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 8 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 7 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 6 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5 - 5.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 - 5.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 - 8.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 - 5.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 - 5.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 1 - 8.pdf16 Jan 2025
Other - LegalFile: ANNEXURE A Declaration Undertaking Unit 4.PDF16 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY SHIVTORNA.pdf16 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTI FICATE Unit 4.PDF16 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Account For Builder.PDF16 Jan 2025
Details of encumbrances concerned to LegalFile: SELF DECLARATION REGARDING ENCUMBRANCES Unit 4.PDF16 Jan 2025
Other - FinanceFile: Declaration cum undertaking Unit 4.PDF16 Jan 2025
Other - TechnicalFile: CC Verification.pdf16 Jan 2025
Other - TechnicalFile: ANNEXURE A Declaration Undertaking Unit 4.PDF16 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Model copy of Agreement Unit 4.PDF16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Unit 4.PDF16 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Account.PDF16 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured Unsecured Fin Unit 4.PDF16 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GANESHBAUG AND SUCHITRA CHSSurvey No 86 1b 2a 1 2 3 Survey No 86 1b 2a 1 2 3 Kothrud Pune 41103847OngoingDec 2027Dec 2027

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmSHIVTORAN CO-OPERATIVE HCompleted 7Lapsed / revoked 5Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: D&T PROPERTIES UNIT-4

D&T PROPERTIES UNIT-4 has 1 registration on MahaRERA, including SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD?

The registered promoter entity is D&T PROPERTIES UNIT-4, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD?

The professionals named in the filing: Architect: Rupesh Jamkhindkar Arckitude Studio; Engineer: Ajay Bhilare Structual Engg; Chartered Accountant: J A Patel & C. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVTORAN CO-OPERATIVE HOUSING SOCIETY LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.