Home / Browse projects / Sindhudurg, Maharashtra / SHIVSRUSHTI
SHIVSRUSHTI
RG-MH-59713 · RERA P52900016070 · Last updated on MahaRERA portal: 17 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 85 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIVSRUSHTI is a Residential / Group Housing project by Shree Infra Realty in Sindhudurg, Maharashtra, registered with MahaRERA as P52900016070 on 16 Apr 2018. Possession is promised by 30 Apr 2029. The completion date has moved by 85 months from the original filing. 12 of the 21 units on this registration are recorded sold or booked, and 79 of 154 construction stages are filed complete.
At a glance
Project
- NameSHIVSRUSHTI
- TypeResidential / Group Housing
- Location
- Malvan Aachara Road
- Ozar Naka
- Shemadranewadi
- Malwan
- Sindhudurg
- 416606
- Pincode416606
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900016070
- ReraGenie IDRG-MH-59713
Builder
- NameShree Infra Realty
- Entity typePartnership
- PartnersYuvraj Shivaji Patil, Narsaiah Lingaiah Byndla
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Apr 2018
- Promised completion30 Apr 2029
- Revised completionRevised to 30 Apr 2029 (originally 30 Mar 2022)
- Buildings14 building records
- Documents filed100 files
Current status
Figures as on 17 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bunglow 1 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 2 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 3 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 4 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 5 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 6 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 7 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 8 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 9 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 10 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 11 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 12 | NA | 1 | 1 | 1 | 0 | 1 |
| Bunglow 13 | NA | 1 | 1 | 1 | 0 | 1 |
| Shivsrushti Apartment | NA | 3 | 3 | 8 | 0 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
79 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Internal walls, at 95%.
Bunglow 167%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Bunglow 273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 473%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 770%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Bunglow 870%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Bunglow 970%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Bunglow 1073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 1170%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Bunglow 1273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow 1373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Shivsrushti Apartment0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 35% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 45% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 20% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Bunglow 1 | 1 | 1 |
| Bunglow 2 | 1 | 1 |
| Bunglow 3 | 1 | 1 |
| Bunglow 4 | 1 | 1 |
| Bunglow 5 | 1 | 1 |
| Bunglow 6 | 1 | 1 |
| Bunglow 7 | 1 | 1 |
| Bunglow 8 | 1 | 1 |
| Bunglow 9 | 1 | 1 |
| Bunglow 10 | 1 | 1 |
| Bunglow 11 | 1 | 1 |
| Bunglow 12 | 1 | 1 |
| Bunglow 13 | 1 | 1 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shree Infra Realty | Mumbai City | Mumbai City |
| Narsaiah Lingaiah Byndia | Mumbai City | Mumbai City |
| Yuvraj Shivaji Patil | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shivsrushti Apartment | NA | Rs 1.36 cr | - |
| - | NA | Rs 85.00 lakh | Rs 63.75 lakh |
| Bunglow 1 | NA | Rs 22.99 lakh | Rs 18.11 lakh |
| Bunglow 2 | NA | Rs 22.99 lakh | Rs 18.11 lakh |
| Bunglow 3 | NA | Rs 22.99 lakh | Rs 22.99 lakh |
| Bunglow 4 | NA | Rs 22.99 lakh | Rs 21.73 lakh |
| Bunglow 5 | NA | Rs 22.99 lakh | Rs 21.73 lakh |
| Bunglow 6 | NA | Rs 22.99 lakh | Rs 22.99 lakh |
| Bunglow 7 | NA | Rs 22.99 lakh | Rs 21.73 lakh |
| Bunglow 8 | NA | Rs 22.99 lakh | Rs 19.31 lakh |
| Bunglow 9 | NA | Rs 22.99 lakh | Rs 19.31 lakh |
| Bunglow 11 | NA | Rs 22.99 lakh | Rs 21.73 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vinayak G Dhuri |
| Engineer | Digambar K Patil |
| Engineer | Ashish Ashok Mungekar |
| Chartered Accountant | Anita Amit Maurya |
| Chartered Accountant | Navin Prakash Mishra |
| Partner | Role in project |
|---|---|
| Shree Infra Realty | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2025
Reason as filed by the promoterThere are some work left to complete the project, we request RERA to provide extension to complete the project with Occupancy certificate.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2029
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 Jan-March26.pdf | 17 Sep 2026 |
| Withdrawal Update Form 1File: Form-1shreein june26.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form-2Jan-March26_compressed.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form2 Shreein jun26.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: FORM-3 Jan-March26.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 shreein june26.pdf | 17 Sep 2026 |
| Form 2A (FY 2022-2023)File: FY 2022-23.pdf | 16 Jul 2026 |
| Form 2A (FY 2023-2024)File: FY 2023-24.pdf | 16 Jul 2026 |
| Form 2A (FY 2024-2025)File: FY 2024-25.pdf | 16 Jul 2026 |
| Form 2A (FY 2025-2026)File: Fy 2025-26.pdf | 16 Jul 2026 |
| Form 5 (FY 2022-2023)File: FORM-5_2022-23.pdf | 16 Jul 2026 |
| Form 5 (FY 2023-2024)File: FORM-5_2023-24.pdf | 16 Jul 2026 |
| Form 5 (FY 2024-2025)File: FORM-5_2024-25.pdf | 16 Jul 2026 |
| Form 5 (FY 2025-2026)File: FORM-5_2025-26.pdf | 16 Jul 2026 |
| Form 1File: Form-1 April-June25.pdf | 7 Jul 2026 |
| Form 2File: Form-2 April-June25_compressed.pdf | 7 Jul 2026 |
| Form 3File: FORM-3 April-June25.pdf | 7 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory April-June25.pdf | 7 Jul 2026 |
| Form 1File: Form- July-sep25.pdf | 7 Jul 2026 |
| Form 2File: Form-2 July-Sep25_compressed.pdf | 7 Jul 2026 |
| Form 3File: FORM-3 July-Sep25.pdf | 7 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-Sep25.pdf | 7 Jul 2026 |
| Form 1File: Form-1 Oct-dec25.pdf | 7 Jul 2026 |
| Form 2File: Form-2 Oct-Dec25_compressed.pdf | 7 Jul 2026 |
| Form 3File: FORM-3 Oct-Dec25.pdf | 7 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Form-2 Oct-Dec25_compressed.pdf | 7 Jul 2026 |
| Form 1File: Form-1 April-June22.pdf | 6 Jul 2026 |
| Form 2File: Form-2 April-June22_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 April-June22.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory april-june22.pdf | 6 Jul 2026 |
| Form 1File: Form-1 July-Sep22.pdf | 6 Jul 2026 |
| Form 2File: Form-2 July-sep22_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 July-Sep22.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-Sep22.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Oct-Dec22.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Oct-Dec22_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 Oct-Dec22.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Oct-Dec22.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Jan-March23.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Jan-March23_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 Jan-March23.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March23.pdf | 6 Jul 2026 |
| Form 1File: Form-1 April-June23.pdf | 6 Jul 2026 |
| Form 2File: Form-2 April-June23_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3April-June23.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory April-June23.pdf | 6 Jul 2026 |
| Form 1File: Form-1 July-Sep23.pdf | 6 Jul 2026 |
| Form 2File: Form-2 July-Sep23_compressed.pdf | 6 Jul 2026 |
| Form 3File: Form-3 July-Sep23.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-Sep23.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Oct-Dec23.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Oct-Dec23_compressed.pdf | 6 Jul 2026 |
| Form 3File: Form-3 Oct-Dec23.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Oct-Dec23.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Jan-March24.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Jan-March24_compressed.pdf | 6 Jul 2026 |
| Form 3File: Form-3 Jan-March24.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March24.pdf | 6 Jul 2026 |
| Form 1File: Form-1 April-June24.pdf | 6 Jul 2026 |
| Form 2File: Form-2 April-June24_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 April-June24.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory April-June24.pdf | 6 Jul 2026 |
| Form 1File: Form-1 July-sep24.pdf | 6 Jul 2026 |
| Form 2File: Form-2 July-sep24_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 July-Sep24.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-Sep24.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Oct-Dec24.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Oct-dec24_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 Oct-Dec24.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Oct-Dec24.pdf | 6 Jul 2026 |
| Form 1File: Form-1 Jan-March25.pdf | 6 Jul 2026 |
| Form 2File: Form-2 Jan-March25_compressed.pdf | 6 Jul 2026 |
| Form 3File: FORM-3 Jan-March25.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March25.pdf | 6 Jul 2026 |
| Declaration in FORM BFile: Form B.pdf | 13 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 10 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 10 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 2020.pdf | 8 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIVSRUSHTI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ozar Naka530+ in Sindhudurg
ATHANG SAI HOMES on S No 32/8/2 and 34/1B of V
Chandrashekhar Suryakant Morvekar
Siddhivinayak Residency
Vastu Builder & Land Developer
SEA MERIDIAN
SKY INFRASTRUCTURE
ATHANG LAXMI
Chandrashekhar Suryakant Morvekar
SEA PEARL
HIRAYA CONSTRUCTIONS LLP
AYAANS AMBARY
Suman Developers
See every Sindhudurg project, with the district possession charts
Builder: Shree Infra Realty
Shree Infra Realty has 1 registration on MahaRERA, including SHIVSRUSHTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if SHIVSRUSHTI is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIVSRUSHTI?
The registered promoter entity is Shree Infra Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIVSRUSHTI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIVSRUSHTI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIVSRUSHTI?
The professionals named in the filing: Architect: Vinayak G Dhuri; Engineer: Digambar K Patil; Engineer: Ashish Ashok Mungekar; Chartered Accountant: Anita Amit Maurya; Chartered Accountant: Navin Prakash Mishra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVSRUSHTI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.