SHIVSHAKTI PRIME

By SHIVSHAKTI BUILDCON

RG-MH-06836 · RERA P51700053379 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
17 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 85%
276 of 351Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

SHIVSHAKTI PRIME is a Others project by SHIVSHAKTI BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700053379 on 27 Oct 2023. Possession is promised by 30 Sep 2027. 75 of the 351 units on this registration are recorded sold or booked, and 17 of 44 construction stages are filed complete.

At a glance

Project

  • NameSHIVSHAKTI PRIME
  • TypeOthers
  • Location
    • Ambarnath Badlapur Road
    • Kulgaon
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053379
  • ReraGenie IDRG-MH-06836

Builder

  • NameSHIVSHAKTI BUILDCON
  • Entity typePartnership
  • PartnersMohan Harilal Pokar, Bharat Narayan Patel, Harilal Shamji Pokar, Jagdish Govind Vasani, Kunjesh Harilal Pokar, Nirav Dayanand Patel, Rajendra Pandharinath Ghorpade, Ramesh Naranbhai Patel, Suresh Narayan Patel, Tapaswi Govind Vasani, Govind Shivji Vasani
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2023PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed85 files

Current status

21%75 of 351 units booked
56.9%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA151411014124
Wing BNA15141100110
Wing CNA15141100110
Wing DNA32077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Wing A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Wing C44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D45%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed475

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots475
Closed/Covered108
Open Space367
BuildingClosed/CoveredOpen SpaceTotal
Wing A35116151
Wing B35116151
Wing C35116151
Wing D31922

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,760 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 May 2025
LandownerVillageDistrict
Pandharinath Rodu GhorpadeBadlapur (M Cl)Thane
Pundlik Rodu GhorpadeBadlapur (M Cl)Thane
Bhaskar Rodu GhorpadeBadlapur (M Cl)Thane
Trimbak Rodu GhorpadeBadlapur (M Cl)Thane
Pritesh Bhagwan GhorpadeBadlapur (M Cl)Thane
Rasika Bhagwan GhorpadeBadlapur (M Cl)Thane
Priyanka Virendra PatilBadlapur (M Cl)Thane
Laxmi Narayan GhorpadeBadlapur (M Cl)Thane
Surekha Madhukar RautBadlapur (M Cl)Thane
Ravindra Narayan GhorpadeBadlapur (M Cl)Thane
Ashok Narayan GhorpadeBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL CORPORATION
Permissible FSI21797.72
Proposed, not sanctioned18,606 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Om shivaly CHS, MIDC Road, Ghorpade Chowk, Katrap, Badlapur East-421503
Estimated costRs 199.67 cr
Cost incurredRs 113.65 cr
Work done56.92%
BuildingWingEstimatedIncurred
Wing ANARs 65.32 crRs 37.88 cr
Wing BNARs 65.32 crRs 37.88 cr
Wing CNARs 65.32 crRs 37.88 cr
-NARs 3.72 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaj Associates
EngineerS V Patel and Associates
EngineerTAPASWI GOVIND VASANI
Chartered AccountantMAMTA SHETH AND ASSOCIATES
Chartered AccountantROHAN NAVIN DEDHIA
Chartered AccountantNARESH PARSOTTAMBHAI PATEL
PartnerRole in project
SHIVSHAKTI BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q4 2526.pdf9 May 2026
Withdrawal Update Form 2File: FORM 2 Q4 2526.pdf9 May 2026
Withdrawal Update Form 3File: Form 3 Q4 2526.pdf9 May 2026
Form 5 (FY 2024-2025)File: F Form 5 25-26.pdf28 Mar 2026
Form 1File: FORM 1_Q3 2526.pdf19 Jan 2026
Form 2File: FORM 2_Q3 2526.pdf19 Jan 2026
Form 3File: FORM 3_Q3 2526.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY DISCLOSURE.pdf19 Jan 2026
Form 1File: FORM 1.pdf4 Nov 2025
Form 2File: FORM 2.pdf4 Nov 2025
Form 3File: FORM 3 F.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: DISC OF SOLD UNSOLD.pdf4 Nov 2025
Form 1File: Form 1 Q2 25-26.pdf4 Nov 2025
Form 2File: Form 2 Q2 25-26.pdf4 Nov 2025
Form 3File: Form 3 Q2 25-26 F.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 F.pdf4 Nov 2025
Form 2A (FY 2023-2024)File: FORM 2A 31.03.2024.pdf29 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A 2025.pdf29 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf28 Jul 2025
Form 1File: Q3-23-24.pdf2 Jun 2025
Form 2File: Q4-23-24.pdf2 Jun 2025
Form 3File: Q4 23-24 Ason 31-March-2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q3-23-24.pdf2 Jun 2025
Form 1File: Q4-23-24.pdf2 Jun 2025
Form 2File: Q4-23-24.pdf2 Jun 2025
Form 3File: Q4 23-24 Ason 31-March-2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q4-23-24.pdf2 Jun 2025
Form 1File: Q1-24-25.pdf2 Jun 2025
Form 2File: Q4-23-24.pdf2 Jun 2025
Form 3File: FORM 3 Q1.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q1 -2024-25.pdf2 Jun 2025
Form 1File: Q1-24-25.pdf2 Jun 2025
Form 2File: Q4-23-24.pdf2 Jun 2025
Form 3File: FROM 3 As on 30-Sept-2024 New.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q2 -2024-25.pdf2 Jun 2025
Form 1File: Q1-24-25.pdf2 Jun 2025
Form 2File: Q4-23-24.pdf2 Jun 2025
Form 3File: FROM 3 Ason 31-Dec-2024 1.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q3 -2024-25.pdf2 Jun 2025
Form 1File: Q4 24-25.pdf2 Jun 2025
Form 2File: Q4 24-25.pdf2 Jun 2025
Form 3File: FROM 3 Ason 31-March-2025.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q4 -2024-25.pdf2 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RAJ ASSOCIATES.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1623- RERA CERTIFICATE.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_compressed.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Final.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REVISED.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Letter.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SHIVSHAKTI BUILDCON.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_compressed.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Discloser of SOLDBOOKED Inventory_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SHIVSHAKTI BUILDCON.pdf20 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 SHIVSHAKTI BUILDCON.pdf20 Apr 2024
Other - TechnicalFile: FORM 2A_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cirtificate-31-12-2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY 111.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Shivshakti Prime.pdf12 Oct 2023
Other - TechnicalFile: CC Verification- Shivshakti Prime.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 SHIVSHAKTI BUILDCON FINAL (2)_11zon.pdf10 Oct 2023
Declaration in FORM BFile: Form B Promoter.pdf6 Oct 2023
Proforma of Allotment letterFile: Final Allotment Letter- Shivshakti Prime.pdf6 Oct 2023
Proforma of Agreement for saleFile: AFS Final.pdf6 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment-Shivshakti.pdf6 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS- Shivshakti.pdf6 Oct 2023
Layout approvalFile: CC-Dholu.pdf5 Oct 2023
Building plan approvalFile: CC-Dholu.pdf5 Oct 2023
Building plan approvalFile: Plan 2 Shivshakti.pdf5 Oct 2023
Building plan approvalFile: Plan 3 Shivshakti.pdf5 Oct 2023
PAN CardFile: SHIVSHAKTI BUILDCON PAN PDF_11zon.pdf5 Oct 2023
Copy of the legal title reportFile: Final Legal Title Report.pdf5 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumberance Lettre - Finance.pdf5 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Legal.pdf5 Oct 2023
Details of encumbrances concerned to LegalFile: Encumberance Lettre - Finance.pdf5 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter-Legal.pdf5 Oct 2023
Copy of Layout Approval (in case of layout)File: CC-Dholu.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: CC-Dholu.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 Shivshakti.pdf5 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 Shivshakti.pdf5 Oct 2023

How this compares with Thane

21%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVSHAKTI PRIME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kulgaon7,600+ in Thane

2 kmSHIVSHAKTI PRIMECompleted 195Lapsed / revoked 76Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: SHIVSHAKTI BUILDCON

Shivshakti Buildcon has 5 registrations on MahaRERA, including Laxmi Residency and Laxmi Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHIVSHAKTI PRIME is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVSHAKTI PRIME?

The registered promoter entity is SHIVSHAKTI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVSHAKTI PRIME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVSHAKTI PRIME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVSHAKTI PRIME?

The professionals named in the filing: Architect: Raj Associates; Engineer: S V Patel and Associates; Engineer: TAPASWI GOVIND VASANI; Chartered Accountant: MAMTA SHETH AND ASSOCIATES; Chartered Accountant: ROHAN NAVIN DEDHIA; Chartered Accountant: NARESH PARSOTTAMBHAI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVSHAKTI PRIME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVSHAKTI PRIME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVSHAKTI PRIME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.