Red flags

  • Rs 10.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 80%
71 of 121Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SHIVSHAKTI OASIS is a Others project by SHIVSHAKTI GENESIS in Thane, Maharashtra, registered with MahaRERA as P51700046768 on 5 Sep 2022. Possession is promised by 31 Dec 2026. 50 of the 121 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVSHAKTI OASIS
  • TypeOthers
  • Location
    • SHIRGAON
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046768
  • ReraGenie IDRG-MH-72904

Builder

  • NameSHIVSHAKTI GENESIS
  • Entity typePartnership
  • PartnersGOVIND SHIVJI VASANI, HARILAL SHAMJI POKAR, JAGDISH GOVIND VASANI, KUNJESH HARILAL POKAR, MOHAN HARILAL POKAR, RAMESH NARANBHAI PATEL

Key dates

this monthRegisteredSep 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

41%50 of 121 units booked
52.5%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA13121192121

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.

WING A: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered52

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,790 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
MANOHAR LAXMAN DHAMDHAREBadlapur (M Cl)Thane
KRUSHNA LAXMAN DHAMDHAREBadlapur (M Cl)Thane
HARI LAXMAN DHAMDHAREBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL CORPORATION
Permissible FSI8037.0
Proposed, not sanctioned8,037 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOM SHIVALAY CHS,MIDC ROAD,BADLAPUR - 421503
Estimated costRs 27.57 cr
Cost incurredRs 14.48 cr
Work done52.51%
BuildingWingEstimatedIncurred
WING ANARs 26.32 crRs 14.48 cr
-NARs 1.25 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMARTHYA ENGINEERS
EngineerAARNA STRUCTURAL CONSULTANTS
EngineerTapaswi Vasani
Chartered AccountantMAMTA SHETH AND ASSOCIATES
Chartered AccountantK R DHOLU AND ASSOCIATES
PartnerRole in project
SHIVSHAKTI GENESIS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM - 2A.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 Genesis.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 Genesis.pdf14 Feb 2026
Withdrawal Update Form 3File: Form 3 Genesis.pdf14 Feb 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30092025 111025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate 30092025 111025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 30092025 18102025.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Shivshakti Genesis (Annual Report) SIGN.pdf18 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 architects certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: INVENTORY Q 24-25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate(3).pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: INVENTORY Q3 2024 25.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate OK.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY Q 2 OK.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory 30 06 2024.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: INVENTARY 30 06 2024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Engineer certificate for quality.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineer certificate for quality.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHIVSHAKTI GENESIS UPLOAD.pdf20 Apr 2024
Other - TechnicalFile: FORM 2A Engineer certificate for quality.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: Dismissed Letter CS No 174.pdf21 Feb 2024
Details of encumbrances concerned to LegalFile: Dismissed Letter CS No 174.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate OK.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory List 16-01-2024 OK.pdf20 Jan 2024
Proforma of Agreement for saleFile: FLAT AGREEMENT.pdf10 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory status_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 SHIVSHAKTI GENESIS_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 31032023.pdf22 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivshakti Genesis Form 3 FINAL.pdf22 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FROM 5 FINAL.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: inventory_compressed.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch GENESIS FINAL.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG GENESIS FINAL.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31032023.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: INVENTORY GENESIS FINAL.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivshakti Genesis Form 3 FINAL.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DEATILS 10 JAN 2023.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificates plinth 10 jan 2023_compressed.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Inventry Details.pdf18 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINALL FINAL 23822compressed.pdf23 Aug 2022
Proforma of Allotment letterFile: FLAT PURCHASE AGREEMENT FINAL.pdf23 Aug 2022
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION FROM SALE AGREEMENT.pdf23 Aug 2022
Details of encumbrances concerned to FinanceFile: declaration finance FINAL.pdf17 Aug 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC FINAL.pdf17 Aug 2022
Layout approvalFile: LAYOUT.PDF4 Aug 2022
Building plan approvalFile: Senction Plan-1.PDF4 Aug 2022
Building plan approvalFile: Senction Plan-2.PDF4 Aug 2022
PAN CardFile: PANO CARD SSG.pdf4 Aug 2022
Copy of the legal title reportFile: TITLE CERTIFICATE FINAL.pdf4 Aug 2022
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCE LEGAL.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.PDF4 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Senction Plan-1.PDF4 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Senction Plan-2.PDF4 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT Cirtificate.pdf4 Aug 2022
Declaration in FORM BFile: FORM B BUILDER FINAL.pdf4 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_200243992549_For_Asset_Based_Search_04_08_2022_16_06_39_633.pdf4 Aug 2022
Proforma of Allotment letterFile: allotment letter FINAL.pdf4 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE designated bank account for rera.pdf4 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation from Allotment Letter.pdf4 Aug 2022

How this compares with Thane

41%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVSHAKTI OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRGAON7,600+ in Thane

2 kmSHIVSHAKTI OASISCompleted 82Lapsed / revoked 32Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 189 registered projects within 2 km.

Builder: SHIVSHAKTI GENESIS

SHIVSHAKTI GENESIS has 1 registration on MahaRERA, including SHIVSHAKTI OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHIVSHAKTI OASIS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVSHAKTI OASIS?

The registered promoter entity is SHIVSHAKTI GENESIS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVSHAKTI OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVSHAKTI OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVSHAKTI OASIS?

The professionals named in the filing: Architect: SAMARTHYA ENGINEERS; Engineer: AARNA STRUCTURAL CONSULTANTS; Engineer: Tapaswi Vasani; Chartered Accountant: MAMTA SHETH AND ASSOCIATES; Chartered Accountant: K R DHOLU AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVSHAKTI OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVSHAKTI OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVSHAKTI OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.