Home / Browse projects / Thane, Maharashtra / Shivshakti Manokamana

Registered No litigation declared Others project

Shivshakti Manokamana

By SHUBH VASTU CONSTRUCTION

RG-MH-51382 · RERA P51700050309 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 36 months from the original
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 70%
140 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Shivshakti Manokamana is a Others project by SHUBH VASTU CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700050309 on 1 Apr 2023. Possession is promised by 31 Dec 2029. The completion date has moved by 36 months from the original filing. 2 of the 142 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameShivshakti Manokamana
  • TypeOthers
  • Location
    • WADEGHAR PADA
    • WADEGHAR
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050309
  • ReraGenie IDRG-MH-51382

Builder

  • NameSHUBH VASTU CONSTRUCTION
  • Entity typePartnership
  • PartnersKISHOR NARAYAN SASE, MANOHAR BALIRAM WYAPARI
  • PartnersNIRAV DAYANAND PATEL, HEET VIRSEN WADIA, KALPESH NARSHIBHAI PATEL, PURAV HARISH GANDHI

Key dates

this monthRegisteredApr 2023First promiseDec 2026Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Apr 2023
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed79 files

Current status

1%2 of 142 units booked
48.2%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANOKAMANANA16161339142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

MANOKAMANA: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered71
Open Space55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI8856.25
Proposed, not sanctioned8,856 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 10-14, White Field Building, Gr Flr E wing, Flower Valley Complex, Khadakpada, Kalyan West - 421301
Estimated costRs 28.00 cr
Cost incurredRs 13.50 cr
Work done48.21%
BuildingWingEstimatedIncurred
MANOKAMANANARs 25.00 crRs 13.50 cr
-NARs 3.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDE CON CONSULTANTS
EngineerVIJAY CONSULTANTS
Chartered AccountantR P A V & CO
Chartered AccountantROHAN DEDHIA & ASSOCIATES
Chartered AccountantL K DEDHIA & Co
PartnerRole in project
SHUBH VASTU CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04032620092Dec 2026 → Dec 2029

Reason as filed by the promoterThat due to unavoidable circumstances, including but not limited to delays in construction activities, approvals, market conditions, and other factors beyond our reasonable control, the project could not be completed within the originally approved timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: REVISED PLAN COPY.pdf23 May 2026
Building plan approvalFile: REVISED PLAN COPY.pdf23 May 2026
Commencement certificateFile: NEW CC.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 MAR 26.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf23 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf23 May 2026
Form 1File: Form 1 JUNE 2025.pdf31 Jan 2026
Form 2File: Form 2 JUNE 2025.pdf31 Jan 2026
Form 3File: Form 3 JUNE 2025.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD-UNSOLD JUNE 25.pdf31 Jan 2026
Form 1File: Form 1 SEPT 2025.pdf31 Jan 2026
Form 2File: Form 2 SEPT 2025.pdf31 Jan 2026
Form 3File: Form 3 SEPT 2025.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD-UNSOLD SEP 25.pdf31 Jan 2026
Form 1File: Form 1 DEC 2025.pdf31 Jan 2026
Form 2File: Form 2 DEC 2025.pdf31 Jan 2026
Form 3File: Form 3 DEC 2025.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD-UNSOLD DEC 25.pdf31 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Jul 2025
Deviation Report with respect to Allotment letterFile: Declaration Bank Account.pdf5 Jul 2025
Other - TechnicalFile: Affidavit.pdf5 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 25.pdf1 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June23 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep23 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec23 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar24 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June24 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep24 form3.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec24 form3.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 mar25.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sep 23 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Dec23 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Mar24 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: June24 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sep24 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Dec24 sold unsold.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Mar25 sold unsold.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE SEP 2023.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE DEC 2023.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE MAR 2024.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE JUNE 2024.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE SEP 2024.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE DEC 2024.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE MAR 25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE JUNE 2023.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE SEP 2023.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE DEC 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE SEP 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE JUNE 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE MAR 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE DEC 2023.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE JUNE 2023.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD-UNSOLD JUNE 23.pdf28 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST OF PARTNERS PURAV GANDHI.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurancce Certificate MAR2024.pdf28 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: kalpesh.pdf23 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: heet.pdf23 Apr 2025
Other - TechnicalFile: PLAN COPY.pdf24 Mar 2023
Layout approvalFile: PLAN COPY.pdf15 Mar 2023
Building plan approvalFile: PLAN COPY.pdf15 Mar 2023
Copy of Layout Approval (in case of layout)File: PLAN COPY.pdf15 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY.pdf15 Mar 2023
Declaration in FORM BFile: FORM B.pdf15 Mar 2023
CERSAI detailsFile: CERSAI.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf15 Mar 2023
Proforma of Agreement for saleFile: Agreement.pdf15 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf15 Mar 2023
PAN CardFile: pan card.pdf27 Feb 2023
Details of encumbrances concerned to FinanceFile: LEGAL NO ENCUMBRANCES.pdf27 Feb 2023
Details of encumbrances concerned to LegalFile: LEGAL NO ENCUMBRANCES.pdf27 Feb 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf27 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Feb 2023
Deviation Report with respect to Allotment letterFile: NO DEV ALLOT.pdf27 Feb 2023
Deviation Report with respect to model copy of AgreementFile: NO DEV AGREE.pdf27 Feb 2023
Copy of the legal title reportFile: FORMAT A.pdf24 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2 ENGINEERS CERT.pdf24 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERT.pdf24 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf24 Feb 2023

How this compares with Thane

1%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shivshakti Manokamana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADEGHAR7,600+ in Thane

2 kmShivshakti ManokamanaCompleted 31Lapsed / revoked 11Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: SHUBH VASTU CONSTRUCTION

SHUBH VASTU CONSTRUCTION has 1 registration on MahaRERA, including Shivshakti Manokamana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Shivshakti Manokamana is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shivshakti Manokamana?

The registered promoter entity is SHUBH VASTU CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shivshakti Manokamana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shivshakti Manokamana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shivshakti Manokamana?

The professionals named in the filing: Architect: DE CON CONSULTANTS; Engineer: VIJAY CONSULTANTS; Chartered Accountant: R P A V & CO; Chartered Accountant: ROHAN DEDHIA & ASSOCIATES; Chartered Accountant: L K DEDHIA & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shivshakti Manokamana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shivshakti Manokamana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shivshakti Manokamana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.