Home / Browse projects / Thane, Maharashtra / Shivsai Paradise
Shivsai Paradise
By Bharat Agri Fert & Realty Limited
RG-MH-10253 · RERA P51700001183 · Last updated on MahaRERA portal: 27 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shivsai Paradise is a Residential / Group Housing project by Bharat Agri Fert & Realty Limited in Thane, Maharashtra, registered with MahaRERA as P51700001183 on 27 Jul 2017. Possession is promised by 30 Dec 2028.
At a glance
Project
- NameShivsai Paradise
- TypeResidential / Group Housing
- Location
- Majiwada Village Road
- Thane West
- Thane (M Corp.)
- Thane
- 400601
- Pincode400601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700001183
- ReraGenie IDRG-MH-10253
Builder
- NameBharat Agri Fert & Realty Limited
- Entity typeCompany
- CINL24100MH1985PLC036547
- GSTIN27AAACB0681K1ZP
- Managing DirectorYogendra Dahyabhai Patel
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2017
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed178 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING G - WEMBLEY | NA | 33 | 33 | 0 | 0 | 0 |
| NOT SANCTIONED | NA | 0 | 0 | 0 | 0 | 0 |
| NOT SANCTIONED | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 6%.
BUILDING G - WEMBLEY37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 6% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NOT SANCTIONED0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NOT SANCTIONED0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed552
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAKASH NIVATE & ASSOCIATES |
| Engineer | MS NILESH R PHULE |
| Chartered Accountant | PUNIT B GUPTA & ASSOCIATES |
| Chartered Accountant | DESAI SAKSENA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| BHARAT AGRI FERT & REALTY REALTY LTD | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Misc Civil Appeal No 244/2016/2016 | The District Judge Thane | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed178
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 - 31-12-2025.pdf | 27 Feb 2026 |
| Form 2File: FORM 2 - 31-12-2025.pdf | 27 Feb 2026 |
| Form 3File: FORM 3 - 31-12-2025.pdf | 27 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD OR BOOKED INVENTORY - 31-12-2025.pdf | 27 Feb 2026 |
| Form 1File: FORM 1 - 30-09-2025.pdf | 28 Nov 2025 |
| Form 2File: FORM 2 - 30-09-2025.pdf | 28 Nov 2025 |
| Form 3File: FORM 3 - 30-09-2025.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT CERTIFICATE.pdf | 22 Jul 2025 |
| Form 2File: ENGINEER CERTIFICATE.pdf | 22 Jul 2025 |
| Form 3File: CA CERTIFICATE.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 22 Jul 2025 |
| Form 1File: ARCHITECT.pdf | 11 Jul 2025 |
| Form 2File: ENGINEER.pdf | 11 Jul 2025 |
| Form 3File: CA.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD UNSOLD.pdf | 11 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate March.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form -3 March 2025.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate March 2025.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of SOLD - BOOKED Inventory March 2025.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate - March 2025.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1.pdf | 12 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 12 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory Dec-2025.pdf | 12 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate Form 2A.pdf | 12 Mar 2025 |
| Certificates of CA (Form 3)File: CA Certificate 30-06-2024.pdf | 10 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificate 30-09-2024.pdf | 10 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificate 30-09-2024.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY 30-09-2024 -10-10-2024 ok f.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY 30-06-2024 -10-07-2024.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD- UNSOLD INVENTORY 30-09-2024 -10-10-2024.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1.pdf | 29 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 29 Nov 2024 |
| Layout approvalFile: scan0024 Size.pdf | 22 Oct 2024 |
| Building plan approvalFile: LOI Dtd 14-10-2024.pdf | 22 Oct 2024 |
| Building plan approvalFile: 1.pdf | 22 Oct 2024 |
| Building plan approvalFile: 2.pdf | 22 Oct 2024 |
| Building plan approvalFile: 3.pdf | 22 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: scan0024 Size.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: LOI Dtd 14-10-2024.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: 1.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: 2.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: 3.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 14 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: REVISE FORM 2.pdf | 5 Aug 2024 |
| Certificates of CA (Form 3)File: 15 july CA Certificate Revised (1).pdf | 15 Jul 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_2-2.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_3-3.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_4-4.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_5-5.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_6-6.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_7-7.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_8-8.pdf | 27 Jun 2024 |
| Building plan approvalFile: SHIVSAI PLAN (1)_9-end.pdf | 27 Jun 2024 |
| Layout approvalFile: SHIVSAI PLAN (1)_1-1.pdf | 27 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: SHIVSAI PLAN (1)_1-1.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_2-2.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_3-3.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_4-4.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_5-5.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_6-6.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_7-7.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_8-8.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: SHIVSAI PLAN (1)_9-end.pdf | 27 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31 MAR 24.pdf | 27 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31 MAR 24.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate - june 23.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate - dec 23.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate - march 24.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate - sept 23.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD JUNE.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD DEC.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD MARCH 24.pdf | 27 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 CA MAR 24 (1).pdf | 27 Jun 2024 |
| Proforma of Agreement for saleFile: Bharat Fertilizer Agreement (1).pdf | 27 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New Bank .pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf | 17 Apr 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shivsai Paradise F | Opposite URCT Majiwada Thane West 400601 | 54 | Completed | Dec 2016 | Late, Feb 2017 |
| Shivsai Paradise D And E | Opposite URCT Majiwada Thane West 400601 | 150 | Completed | Mar 2012 | Mar 2012 |
| Shivsai Paradise C | Opposite URCT Majiwada Thane west 400601 | 47 | Completed | Dec 2010 | Late, Mar 2011 |
| Shivsai Paradise A And B | Opposite URCT Majiwada Thane West 400601 | 132 | Completed | Dec 2009 | Late, Feb 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 178 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shivsai Paradise on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane West7,600+ in Thane
Filed coordinates, straight-line distance. 364 registered projects within 2 km.
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
Bliss
Kapstone Constructions Private Limited
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
See every Thane project, with the district possession charts
Builder: Bharat Agri Fert & Realty Limited
Bharat Agri Fert & Realty Limited has 1 registration on MahaRERA, including Shivsai Paradise. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Shivsai Paradise is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shivsai Paradise?
The registered promoter entity is Bharat Agri Fert & Realty Limited, a company as per the filing. Its CIN L24100MH1985PLC036547 and GSTIN 27AAACB0681K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shivsai Paradise?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shivsai Paradise?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shivsai Paradise?
The professionals named in the filing: Architect: PRAKASH NIVATE & ASSOCIATES; Engineer: MS NILESH R PHULE; Chartered Accountant: PUNIT B GUPTA & ASSOCIATES; Chartered Accountant: DESAI SAKSENA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shivsai Paradise?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback