Home / Browse projects / Raigarh, Maharashtra / SHIVORNATE

Registered No litigation declared Others project

SHIVORNATE

By SHANKAR SHIMGYA PATIL

RG-MH-17574 · RERA P52000055082 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
31 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SHIVORNATE is a Others project by SHANKAR SHIMGYA PATIL in Raigarh, Maharashtra, registered with MahaRERA as P52000055082 on 29 Feb 2024. Possession is promised by 31 Mar 2027. 20 of the 51 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVORNATE
  • TypeOthers
  • Location
    • SECTOR 24
    • BOKADVIRA DRONAGIRI
    • Bokadvira
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000055082
  • ReraGenie IDRG-MH-17574

Builder

  • NameSHANKAR SHIMGYA PATIL
  • Entity typeOthers
  • Named personSHIVDATTAHOMEMAKERS
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Feb 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

39%20 of 51 units booked
84.0%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVORNATENA7746551

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SHIVORNATE: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area750 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI2777.44
Proposed, not sanctioned2,777 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI CHAMBERS SHOP NO 8 9 10 AND 72 PLOT NO 44 SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614
Estimated costRs 6.70 cr
Cost incurredRs 5.63 cr
Work done84.02%
BuildingWingEstimatedIncurred
SHIVORNATENARs 6.10 crRs 5.26 cr
-NARs 60.28 lakhRs 37.37 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTriarch Design Studio & Interior Designers
EngineerAGHARKAR CONSULTANTS
Chartered AccountantSushant Narayanrao Alme
Chartered AccountantManish Kumar
Chartered AccountantPooja Prasad Sawant & Co.
Chartered AccountantS D Waghmare & Co
PartnerRole in project
SHANKAR SHIMGYA PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Shivornate 31-12-2025.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 31-03-2026.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 31-03-2026.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 Shivornate 31-12-2025.pdf14 May 2026
Withdrawal Update Form 2File: From 2 31-03-2026.pdf14 May 2026
Withdrawal Update Form 2File: From 2 31-03-2026.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 shivornate 31-12-2025.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 31-03-2026 sign.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 31-03-2026 sign.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 30-09-25.pdf13 Dec 2025
Withdrawal Update Form 2File: Form 2 30-09-25.pdf13 Dec 2025
Withdrawal Update Form 3File: Form 3 30-09-25.pdf13 Dec 2025
Withdrawal Update Form 1File: form 1 Shivornate q1.pdf30 Sep 2025
Withdrawal Update Form 2File: form 2 Shivornate q1.pdf30 Sep 2025
Withdrawal Update Form 3File: form 3 Shivornate q1 new.pdf30 Sep 2025
Form 1File: form 1 Shivornate q1.pdf26 Jul 2025
Form 2File: form 2 Shivornate q1.pdf26 Jul 2025
Form 3File: form 3 Shivornate q1 new.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Shivornate.pdf26 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 23-24 manish.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 .pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 .pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 1.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 2.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 .pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate S O.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE S O.pdf25 May 2024
Proforma of Agreement for saleFile: agreement for sale.pdf16 Apr 2024
Deviation Report with respect to Allotment letterFile: deviation report for alotment .pdf16 Apr 2024
Deviation Report with respect to model copy of AgreementFile: deviation report for agreement for sale.pdf16 Apr 2024
Other - TechnicalFile: 1 Other - Technical (1) (1).pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (2) (1).pdf6 Feb 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (2) (1).pdf6 Feb 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf6 Feb 2024
Proforma of Agreement for saleFile: AFS.pdf6 Feb 2024
Proforma of Allotment letterFile: Allotment letter.pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow6 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf6 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation sale Agreement.pdf6 Feb 2024
Copy of the legal title reportFile: title report.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Feb 2024
Other - LegalFile: Agreement to Lease 1.pdf3 Feb 2024
Other - LegalFile: Agreement to Lease 2.pdf3 Feb 2024
Other - LegalFile: TRIPARTITE AGREEMENT.pdf3 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf26 Jan 2024
Building plan approvalFile: PLAN.pdf23 Jan 2024
Layout approvalFile: PLAN.pdf23 Jan 2024
PAN CardFile: 1 PAN Card (1).pdf23 Jan 2024
Copy of Layout Approval (in case of layout)File: PLAN.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Date 28 -08- 2023.pdf23 Jan 2024
Declaration in FORM BFile: FORM B(1).pdf23 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CRYSTAL PLAZAPLOT NO 14 SECTOR-2 ULWE31CompletedJul 2016Jul 2016

How this compares with Raigarh

39%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVORNATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOKADVIRA DRONAGIRI5,900+ in Raigarh

2 kmSHIVORNATECompleted 64Lapsed / revoked 22Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: SHANKAR SHIMGYA PATIL

SHANKAR SHIMGYA PATIL has 4 registrations on MahaRERA, including ANIRUDHA SAI and CRYSTAL PRIDE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHIVORNATE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVORNATE?

The registered promoter entity is SHANKAR SHIMGYA PATIL, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVORNATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVORNATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVORNATE?

The professionals named in the filing: Architect: Triarch Design Studio & Interior Designers; Engineer: AGHARKAR CONSULTANTS; Chartered Accountant: Sushant Narayanrao Alme; Chartered Accountant: Manish Kumar; Chartered Accountant: Pooja Prasad Sawant & Co.; Chartered Accountant: S D Waghmare & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVORNATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVORNATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVORNATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.