RG-MH-17032 · RERA P52700027557 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
86 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SHIVGAD RESIDENCY is a Residential / Group Housing project by ADITI BUILDERS in Satara, Maharashtra, registered with MahaRERA as P52700027557 on 16 Dec 2020. Possession is promised by 30 Jun 2028. 6 of the 92 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete.

At a glance

Project

  • NameSHIVGAD RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SATARA KOREGAON ROAD
    • VIKASNAGAR
    • Khed (CT)
    • Satara
    • 415003
  • Pincode415003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700027557
  • ReraGenie IDRG-MH-17032

Builder

  • NameADITI BUILDERS
  • Entity typePartnership
  • PartnersMAHESH KISAN MANE, SAGAR NARAYAN GHORPADE, KIRAN PRAKASH PATIL, GAYATRI ABHIJIT SURYAWANSHI, SAGAR CHANDRAKANT SHINDE, VAIBHAV PANDURANG SHINDE, ABHIJIT DASHRATH TAMBOLI, HEMANT SHANKAR KADAM
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredDec 2020PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Dec 2020
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed95 files

Current status

7%6 of 92 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA5536036
BNA5524024
CNA5532032
DNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANITA SATISH YADAVVanvaswadiSatara

Approvals and building plan

Sanctioning authoritySATARA COLLECTOR OFFICE
Permissible FSI5987.0
Proposed, not sanctioned5,987 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDESAI HEIGHTS VISAVA PARK AREA SATARA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT SHIVAJI BAGAD E
EngineerNITIN SUBHASHRAO JADHAV
Chartered AccountantSAMEER CHANDRAKANT SHINDE
PartnerRole in project
ADITI BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1.PDF20 Apr 2026
Form 2File: FORM 2 DEC 25.PDF20 Apr 2026
Form 3File: FORM 3.PDF20 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD.PDF20 Apr 2026
Form 1File: FORM 1.PDF20 Jan 2026
Form 2File: FORM 2 DEC 25.PDF20 Jan 2026
Form 3File: FORM 3.PDF20 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD.PDF20 Jan 2026
Form 1File: from no1 june 2025.PDF19 Oct 2025
Form 2File: form no 2.PDF19 Oct 2025
Form 3File: from no 3 june 2025.PDF19 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold.PDF19 Oct 2025
Form 1File: from no1 june 2025.PDF20 Jul 2025
Form 2File: form no 2.PDF20 Jul 2025
Form 3File: from no 3 june 2025.PDF20 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold.PDF20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH sept 2024.PDF20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no1 dec 24.PDF20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1 march 25.PDF20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca sept 2024.PDF20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form no3 dec 24.PDF20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 MARCH 25.PDF20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg sept 2024.PDF20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no2 dec 24.PDF20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2 march 25.PDF20 Apr 2025
Disclosure of sold/ booked inventoryFile: sold.PDF20 Apr 2025
Disclosure of sold/ booked inventoryFile: sold 31-12.PDF20 Apr 2025
Disclosure of sold/ booked inventoryFile: sold 31-3.PDF20 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.PDF20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JUNE 2024.PDF23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG JUNE 2024.PDF23 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD.PDF23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA JUNE 2024.PDF23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.PDF20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.PDF20 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.PDF20 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-2021.PDF4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.PDF4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-2023.PDF4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH MARCH 2024.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JUNE 2024.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH SEPT 2024.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JAN 2024.PDF20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DEC 2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD MARCH 2023.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD JUNE 2023.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD JUNE 2023.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD SEPT 2023.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD DEC 2023.PDF20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA MARCH 2024.PDF20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAJUNE 2024.PDF20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SEPT 2024.PDF20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA JAN 2024.PDF20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 AUDIT REPORT 20-21.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 AUDIT REPORT 21-22.pdf15 Apr 2023
Building plan approvalFile: REVISED PLAN 1.pdf13 Mar 2023
Building plan approvalFile: REVISED PLAN 2.pdf13 Mar 2023
Building plan approvalFile: REVISED PLAN 3.pdf13 Mar 2023
Building plan approvalFile: REVISED PLAN 4.pdf13 Mar 2023
Building plan approvalFile: REVISED PLAN 5.pdf13 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN 1.pdf13 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN 2.pdf13 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN 3.pdf13 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN 4.pdf13 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN 5.pdf13 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED N A ORDER.pdf13 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ENGG CERT Q DEC 2019.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ENGG CERT Q MAR 2021.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: BOOKED SOLD FLAT INVENTORY.pdf12 Aug 2021
Declaration in FORM BFile: Form B Hemant.pdf14 Dec 2020
Layout approvalFile: PLAN 1.pdf12 Dec 2020
Building plan approvalFile: PLAN 2.pdf12 Dec 2020
Building plan approvalFile: PLAN 3.pdf12 Dec 2020
Building plan approvalFile: PLAN 4.pdf12 Dec 2020
Building plan approvalFile: PLAN 5.pdf12 Dec 2020

How this compares with Satara

7%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SHIVGAD RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKASNAGAR1,100+ in Satara

Builder: ADITI BUILDERS

ADITI BUILDERS has 2 registrations on MahaRERA, including SHIVGAD RESIDENCY and HIRA SADAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if SHIVGAD RESIDENCY is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVGAD RESIDENCY?

The registered promoter entity is ADITI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVGAD RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVGAD RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVGAD RESIDENCY?

The professionals named in the filing: Architect: SUMIT SHIVAJI BAGAD E; Engineer: NITIN SUBHASHRAO JADHAV; Chartered Accountant: SAMEER CHANDRAKANT SHINDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVGAD RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVGAD RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVGAD RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.