Home / Browse projects / Thane, Maharashtra / SHIVA AMRUT ESTATE D WING

Registered No litigation declared Residential / Group Housing project

SHIVA AMRUT ESTATE D WING

By SHIVA AMRUT ENTERPERISES

RG-MH-49768 · RERA P51700049115 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Excavation, 90%
11 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SHIVA AMRUT ESTATE D WING is a Residential / Group Housing project by SHIVA AMRUT ENTERPERISES in Thane, Maharashtra, registered with MahaRERA as P51700049115 on 30 Jan 2023. Possession is promised by 31 Dec 2026. 16 of the 27 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVA AMRUT ESTATE D WING
  • TypeResidential / Group Housing
  • Location
    • DIVA SHIL ROAD
    • SABA DIVA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • RERA no.P51700049115
  • ReraGenie IDRG-MH-49768

Builder

  • NameSHIVA AMRUT ENTERPERISES
  • Entity typePartnership
  • PartnersNISHIT VIJAY BHOIR, AMIT ASHOK KOTHARI, SURESH LAXMAN KARADE, VILAS NARAYAN KINE, PRAMOD KRISHNA KARAMPURE, NANDKUMAR NARAYAN KINE
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

59%16 of 27 units booked
61.9%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WINGNA9720727

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

D WING: 26% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered1
Open Space2

Land and ownership22

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,040 sq m
Land owned byThe promoter, with other names on the file
Named landowners22
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Nov 2025
LandownerVillageDistrict
RATAN DIVDYA FAUJDARThane (M Corp.)Thane
EKNATH JANA FOUJDARThane (M Corp.)Thane
KASHINATH JANA FOUJDARThane (M Corp.)Thane
RAVINDRA JANA FOUJDARThane (M Corp.)Thane
MANGESH HALYA MHATREThane (M Corp.)Thane
SUMAN HALYA MHATREThane (M Corp.)Thane
MADHUKAR JANA FAUJDARThane (M Corp.)Thane
INDUBAI RAMDAS MHATREThane (M Corp.)Thane
BALARAM BAMA FAUJDARThane (M Corp.)Thane
NAVNATH ANKUSH FAUJDARThane (M Corp.)Thane
VASANT BAMA FAUJDARThane (M Corp.)Thane
RAMDAS BAMA FAUJDARThane (M Corp.)Thane
LAHU BAMA FAUJDARThane (M Corp.)Thane
ANANDIBAI KRUSHNA FAUJDARThane (M Corp.)Thane
GANESH KRUSHNA FAUJDARThane (M Corp.)Thane
SANJAY KRISHNA FAUJDARThane (M Corp.)Thane
KESHAV KRISHNA FAUJDARThane (M Corp.)Thane
RAMCHANDRA DIVDYA FAUJDARThane (M Corp.)Thane
PARVATIBAI GOTIRAM DALITKARThane (M Corp.)Thane
BANUBAI BHAGWAN PATILThane (M Corp.)Thane
BARKUBAI BEDKYA MHATREThane (M Corp.)Thane
SARIKA GURUNATH PATILThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI941.99
Proposed, not sanctioned942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANRAJ SHOPPING CENTRE, GROUND FLOOR SABA (DIVA) THANE 400612
Estimated costRs 3.42 cr
Cost incurredRs 2.12 cr
Work done61.89%
BuildingWingEstimatedIncurred
D WINGNARs 3.32 crRs 2.12 cr
-NARs 10.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAY PATIL AND ASSOCIATES R PATIL
EngineerGLOBAL STRUCTCON SAMEER JESTE
Chartered AccountantPRAVIN KOTHARI NEMICHAND KOTHARI
PartnerRole in project
SHIVA AMRUT ENTERPERISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 1 June 24.pdf15 Jun 2026
Form 2File: 2 June 24.pdf15 Jun 2026
Form 3File: From 3 June 24.pdf15 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf15 Jun 2026
Form 1File: 1 Sept 24.pdf15 Jun 2026
Form 2File: 2 Sept 24.pdf15 Jun 2026
Form 3File: From 3.pdf15 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf15 Jun 2026
Form 1File: Form 1.pdf25 May 2026
Form 2File: Form-2.pdf25 May 2026
Form 3File: Form 3.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf25 May 2026
Form 1File: 1 Seot 23.pdf20 May 2026
Form 2File: 2 Sept 23.pdf20 May 2026
Form 3File: 3 Sept 23.pdf20 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf20 May 2026
Form 1File: Form 1.pdf20 May 2026
Form 2File: Form-2.pdf20 May 2026
Form 3File: 3 Dec 23.pdf20 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf20 May 2026
Form 1File: 1 June 23.pdf16 May 2026
Form 2File: 2 June 23.pdf16 May 2026
Form 3File: Form 3.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf16 May 2026
Form 1File: Form 1 Arc.pdf8 May 2026
Form 2File: Form 2 rcc.pdf8 May 2026
Form 3File: Form 3.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf8 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 Q3.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 Q4.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RCC.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5-compressed.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 Q4.pdf20 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qtly form 5 311223.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual form 5 2223.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 rcc.pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Aug 2023
Other - FinanceFile: Form 3_13012023.pdf13 Jan 2023
CERSAI detailsFile: 1 CERSAI details 13012023.pdf12 Jan 2023
Copy of the legal title reportFile: Title 03012023.pdf3 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39.pdf3 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance letter-legal .pdf3 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Finance.pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance letter-legal .pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter-Finance.pdf3 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Dec 2022
Proforma of Allotment letterFile: AL_Shiva Amrut_03122022.pdf3 Dec 2022
Proforma of Agreement for saleFile: AFS_Shiva Amrut_03122022.pdf3 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account_13012023.pdf3 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf3 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for sale.pdf3 Dec 2022
OtherFile: Sale Agreement Allotment Letter.pdf14 Oct 2022
Details of encumbrances concerned to LegalFile: No encumbrances.pdf7 Sep 2022
OtherFile: Legal Title.pdf23 May 2022
Declaration in FORM BFile: Affidavit Dwing.pdf31 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 wing D.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: Allotment letter ( Eknath foujdar).pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: Allotment letter (Ratan Foujdar).pdf31 Mar 2022
Layout approvalFile: Location plan D.PDF24 Mar 2022
Building plan approvalFile: Plan D wing.PDF24 Mar 2022
PAN CardFile: PAN.pdf24 Mar 2022
Details of encumbrancesFile: No encumbrances.pdf24 Mar 2022
Copy of Layout Approval (in case of layout)File: Location plan D.PDF24 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan D wing.PDF24 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: D wing CC.pdf24 Mar 2022
Declaration about Commencement CertificateFile: Plinth certi D.pdf24 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Wing D.pdf24 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHIV AMRUTVILLAGE DAWALE DIST THANE82CompletedDec 2021Late, Mar 2022

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVA AMRUT ESTATE D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SABA DIVA7,600+ in Thane

Builder: SHIVA AMRUT ENTERPERISES

SHIVA AMRUT ENTERPERISES has 1 registration on MahaRERA, including SHIVA AMRUT ESTATE D WING. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHIVA AMRUT ESTATE D WING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVA AMRUT ESTATE D WING?

The registered promoter entity is SHIVA AMRUT ENTERPERISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVA AMRUT ESTATE D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVA AMRUT ESTATE D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVA AMRUT ESTATE D WING?

The professionals named in the filing: Architect: VINAY PATIL AND ASSOCIATES R PATIL; Engineer: GLOBAL STRUCTCON SAMEER JESTE; Chartered Accountant: PRAVIN KOTHARI NEMICHAND KOTHARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVA AMRUT ESTATE D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVA AMRUT ESTATE D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVA AMRUT ESTATE D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.