ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHIV SAI KRUPA CHS LTD

Completed No litigation declared Residential / Group Housing project

SHIV SAI KRUPA CHS LTD

By P G BUILDERS & DEVELOPERS

RG-MH-29741 · RERA P51700029095 · Last updated on MahaRERA portal: 28 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SHIV SAI KRUPA CHS LTD is a Residential / Group Housing project by P G BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700029095 on 26 Apr 2021. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameSHIV SAI KRUPA CHS LTD
  • TypeResidential / Group Housing
  • Location
    • VADAVALI
    • AMBERNATH
    • Chavindra
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700029095
  • ReraGenie IDRG-MH-29741

Builder

  • NameP G BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersPRAMODKUMAR RAMPATI CHAUBEY, GYANDHAR PREM SHANKER MISHRA
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects10 →

Key dates

this monthRegisteredApr 2021PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Apr 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV SAI KRUPA CHS LTDNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

SHIV SAI KRUPA CHS LTD: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered3
Open Space114

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area528 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SMT GANGABAI D JAVERIAmbarnath (R)Thane
SHIV SAI KRUPA CHS LTDAmbarnath (R)Thane

Approvals and building plan

Permissible FSI920.31
Proposed, not sanctioned920 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANVELKAR PLAZA, STATION ROAD, AMBAERNATH - EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH JAGTAP AND ASSOCIATES
EngineerKSK CONSORTIUM
Chartered AccountantD S JAIN AND CO
PartnerRole in project
P G BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jul 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shiv Sai Krupa.pdf28 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Shiv sai Krupa soc reg certificate.pdf28 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_Shiv Sai Krupa.pdf29 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: From 4 - Shiv Sai krupa 30 3 2023.pdf29 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SHIV SAI KRUPA.pdf3 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Shiv Sai Krupa.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: SHIV SAI KRUPA CHS LTD.pdf3 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIV SAI KRUPA CHS LTD.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIV SAI KRUPA FORM 1.pdf30 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shiv Sai Krupa_form 2 (2).pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: pg shiv sai krupa disclosure.pdf30 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From - 5 Shiv Sai Krupa.pdf26 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSK FORM 1.pdf20 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSK FORM 2.pdf20 Sep 2022
Disclosure of sold/ booked inventoryFile: SSK disclosure.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSK FORM 3.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Sai Krupa form3 MAR 22.pdf7 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From -1 SHIV SAI KRUPA.pdf11 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shiv Sai Krupa.pdf11 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A SHIV SAI KRUPA.pdf11 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure - Shiv Sai Kruap.pdf11 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shiv sai krupa_form 1.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHIV_SAI_RERA.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A shiv sai krupa.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: ssk.pdf22 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIV SAI KRUPA FORM 3.pdf22 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSK form 1.pdf21 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSK Form 2.pdf21 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SSK FORM 2A.pdf21 Oct 2021
Declaration about Commencement CertificateFile: Form D_SSK.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Shiv Sai Krupa.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Shiv sai Krupa.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_Shiv Sai Krupa.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure- Shiv Sai Krupa.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Shiv Sai Krupa.pdf13 Aug 2021
Building plan approvalFile: Revised Plan Page 2.pdf30 Jul 2021
Building plan approvalFile: Revised Plan Page 3.pdf30 Jul 2021
Building plan approvalFile: Revised Plan Page 4.pdf30 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Page 2.pdf30 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Page 3.pdf30 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Page 4.pdf30 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate_Shiv Sai Krupa.pdf30 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SHIV SAI.pdf15 Jul 2021
Building plan approvalFile: Revised Plan Page 1.pdf8 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Page 1.pdf8 Jul 2021
Copy of the legal title reportFile: shiv sai krupa rera format title_final.pdf21 Apr 2021
Declaration in FORM BFile: Form B in the name of land owner_compressed.pdf21 Apr 2021
Declaration in FORM BFile: form B_Society1.pdf7 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (3)_compressed.pdf6 Apr 2021
OtherFile: 1-5.pdf6 Apr 2021
OtherFile: 6-10.pdf6 Apr 2021
OtherFile: 11-20-1-5.pdf6 Apr 2021
OtherFile: 11-20-6-10.pdf6 Apr 2021
OtherFile: 21-31-1-5.pdf6 Apr 2021
OtherFile: 21-31-6-11.pdf6 Apr 2021
Layout approvalFile: Plan Page 1.pdf5 Apr 2021
Layout approvalFile: Plan Page 2.pdf5 Apr 2021
Layout approvalFile: Plan Page 1.pdf5 Apr 2021
Building plan approvalFile: Plan Page 1.pdf5 Apr 2021
Building plan approvalFile: Plan Page 2.pdf5 Apr 2021
Building plan approvalFile: Plan Page 3.pdf5 Apr 2021
PAN CardFile: PAN CARD.pdf5 Apr 2021
Copy of the legal title reportFile: TITTLE DEED 1.pdf5 Apr 2021
Details of encumbrancesFile: ENCUMBRANCE.pdf5 Apr 2021
Copy of Layout Approval (in case of layout)File: Plan Page 1.pdf5 Apr 2021
Copy of Layout Approval (in case of layout)File: Plan Page 2.pdf5 Apr 2021
Copy of Layout Approval (in case of layout)File: Plan Page 1.pdf5 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan Page 1.pdf5 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan Page 2.pdf5 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan Page 3.pdf5 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement of Shiv Sai.pdf5 Apr 2021
Declaration in FORM BFile: FORM B.pdf5 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf5 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Apr 2021
Proforma of Allotment letterFile: DRAFT ALLOTMENT AND SALE AGREEMENT.pdf5 Apr 2021

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHREE SAI PANACHESURVEY NO 142 HISSA NO 5 CHIKHLOLI K B ROAD AMBERNATH WEST THANE DIST29CompletedJun 2020May 2019
ANITA C H S LTDPLOT NO 7 C T S NO 9000 NELYOG NAGAR B CABIN ROAD AMBERNATH EAST THANE DIST MAHARASHTRA37CompletedMay 2020May 2019
HERAMB KRUPA C H S LTDC T S NO 4397 BHIDEWADI KANSAI SECTION VILLAGE AMBERNATH THANE DIST MAHARASHTRA34CompletedFeb 2020May 2019
NILOY C H SC T S NO 4378 SURVEY NO 82 PART VILLAGE KANSI AMBERNATH EAST THANE DIST MAHARASHTRA 421 50178CompletedDec 2019Sep 2018
BRITTO HOUSEPLOT NO 5 SURVEY NO 166 CTS NO 2269-2274 KHOJ KHUNTAVLI KHOJGAON AMBERNATH WEST THANE DIST MAHARASHTRA26CompletedDec 2018Jan 2018
SHREE SAI LEELASURVEY NO 86 HISSA NO 3 BARKUPADA AMBERNATH EAST THANE DIST12CompletedJun 2018Jan 2018
KANAK C H S LTDNEELYOG NAGAR B CABIN ROAD VADAVLI AMBERNATH EAST THANE DIST24CompletedJun 2016Late, Jul 2016
SAI KRUPA APARTMENTKHOJ KUNTAVLI AMBERNATH WEST THANE DIST31CompletedJun 2015Apr 2015
BUSARE APARTMENTKHOJ KUNTAVLI AMBARNATH WEST THANE DIST26CompletedMar 2015Late, Apr 2015

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV SAI KRUPA CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH7,600+ in Thane

Builder: P G BUILDERS & DEVELOPERS

P G BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including ASHIRWAD RESIDENCY CHS LTD and SHIV SAI KRUPA CHS LTD. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHIV SAI KRUPA CHS LTD is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV SAI KRUPA CHS LTD?

The registered promoter entity is P G BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV SAI KRUPA CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV SAI KRUPA CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV SAI KRUPA CHS LTD?

The professionals named in the filing: Architect: MAHESH JAGTAP AND ASSOCIATES; Engineer: KSK CONSORTIUM; Chartered Accountant: D S JAIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV SAI KRUPA CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV SAI KRUPA CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV SAI KRUPA CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.