SHIV OM PROJECT

By SHIV OM DEVELOPERS

RG-MH-26241 · RERA P51800009318 · Last updated on MahaRERA portal: 25 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
17 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 98%
5 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

SHIV OM PROJECT is a Others project by SHIV OM DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009318 on 22 Aug 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 66 months from the original filing. 13 of the 18 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHIV OM PROJECT
  • TypeOthers
  • Location
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009318
  • ReraGenie IDRG-MH-26241

Builder

  • NameSHIV OM DEVELOPERS
  • Entity typePartnership
  • PartnersKRISHNAKUMAR SARWANSINGH THAKUR, DEEPAK BHUPENDRA GAMBHIR
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

28 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed48 files

Current status

72%13 of 18 units booked

Figures as on 25 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV OM BUILDING 1NA121217118
SHIV OM BUILDING 2-A,B,C WINGNA2828000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 98%.

SHIV OM BUILDING 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
SHIV OM BUILDING 2-A,B,C WING73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes80%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered3
Open Space51
BuildingClosed/CoveredOpen SpaceTotal
SHIV OM BUILDING 111819
SHIV OM BUILDING 2-A,B,C WING23335

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,925 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Dec 2025

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI9475.79
Proposed, not sanctioned9,476 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB1, LGL-34,GALLERIA, HIRANANDANI, POWAI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKRANT JERYAL
EngineerDilip Gambhir
Chartered AccountantShripati Gandhi Choudhari & Co.
Chartered AccountantShah & Taparia
Chartered AccountantA S A P & Co.
PartnerRole in project
SHIV OM DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001106Dec 2018 → Dec 2019

Reason as filed by the promoterConstruction of Both the buildings i.e Bldg no 1 & Bldg no 2 A Wing was completed and accordingly application for OC was made to MCGM, however the same is not been granted due to the following reasons as mentioned in letter from MCGM attached hereinafter. 1) Unauthorised Partition wall constructed around bldg no 1 . 2) Wing A, Bldg no-2 is unauthorised occupied, Flats on 1st floor and 3 rd floor are amalgamated. Flower beds are enclosed in some flats as well as kitchen orientation changed in few flats. Partition made in bathroom at 1st floor flat no 102. 3) Stack Parking not erected at site. T

EXT51800011632Dec 2018 → Dec 2023

Reason as filed by the promoterI/We the Promoters of the Project Shiv Om Project registered under project registration number P51800009318 do hereby declare that the extended date of completion of our project was 31st December 2019. We would like to inform you that the project is 90% completed. Shiv Om Project consists of 2 Buildings. Building No. 1 is Residential and Commercial, The total number of flats is 17 and there is 1 commercial shop. Out of the 17 flats, 9 flats are sold and the details of sale consideration received and receivable have been provided as per Annexure “A” of this Certificate. Further out of total fla

Litigation declared2

CaseCourtStatus
14/174/2014CONSUMER DISPUTES REDRESSAL COMMISSION MAHARASHTRA STATEAppeal to National Commision New Delhi
1132 of 2017/2017National Commision New DelhiPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2018-2019)File: Form 5 - 2019.pdf25 Feb 2026
Form 5 (FY 2019-2020)File: Form 5 - 2020.pdf25 Feb 2026
Form 5 (FY 2020-2021)File: Form 5 - 2021.pdf25 Feb 2026
Form 1File: Form 1 - March 24.pdf30 Dec 2025
Form 2File: Form 2 - March 24.pdf30 Dec 2025
Form 3File: Form 3 new.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 24.pdf30 Dec 2025
Form 1File: Form 1 - June 24.pdf30 Dec 2025
Form 2File: Form 2 - June 24.pdf30 Dec 2025
Form 3File: Form 3 - June 24.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 24.pdf30 Dec 2025
Form 2A (FY 2021-2022)File: form 2A - March 22.pdf30 Dec 2025
Certificates of CA (Form 3)File: shivom form 3 updated new.pdf22 Apr 2022
Disclosure of sold/ booked inventoryFile: disclosure final final.pdf6 Apr 2022
Declaration about Commencement CertificateFile: declaration of CC.pdf28 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A final.pdf28 Mar 2022
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory.pdf28 Mar 2022
CERSAI detailsFile: CERSAI RPEORT SHIV OM PROJECT.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA 18-19 final.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA 19-20 final.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA 20-21 final.pdf28 Mar 2022
Certificates of CA (Form 5)File: RERA_CERTIFICATE_17-18.pdf28 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects_2017073012232800.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate)FO.pdf30 Jul 2017
Certificates of CA (Form 3)File: form 3.pdf30 Jul 2017
Proforma of Allotment letterFile: agreement.pdf30 Jul 2017
Proforma of Allotment letterFile: allotment letter.pdf30 Jul 2017
OtherFile: OC Wing B and C.pdf30 Jul 2017
OtherFile: Declaration of project.pdf30 Jul 2017
Layout approvalFile: LAY 2.pdf29 Jul 2017
Layout approvalFile: LAY 3.pdf29 Jul 2017
Layout approvalFile: LAY 1.pdf29 Jul 2017
Building plan approvalFile: cc and iod 4014.pdf29 Jul 2017
Building plan approvalFile: 4247 cc and iod .pdf29 Jul 2017
PAN CardFile: Amardeep Pan.pdf29 Jul 2017
PAN CardFile: Deepak Gambhir.pdf29 Jul 2017
PAN CardFile: Krishna Kumar.pdf29 Jul 2017
Copy of the legal title reportFile: Legal Title.pdf29 Jul 2017
Copy of the legal title reportFile: Legal Title 2.pdf29 Jul 2017
Details of encumbrancesFile: Encumbrance.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: LAY 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: LAY 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: LAY 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: 4247 cc and iod .pdf29 Jul 2017
Building Plan Approval (IOD)File: cc and iod 4014.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc and iod 4014.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 4247 cc and iod .pdf29 Jul 2017
Declaration in FORM BFile: Form B.pdf29 Jul 2017

How this compares with Mumbai Suburban

72%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV OM PROJECT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmSHIV OM PROJECTCompleted 57Lapsed / revoked 30Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: SHIV OM DEVELOPERS

SHIV OM DEVELOPERS has 2 registrations on MahaRERA, including SHIV OM PROJECT and shree hari complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SHIV OM PROJECT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHIV OM PROJECT is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV OM PROJECT?

The registered promoter entity is SHIV OM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV OM PROJECT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV OM PROJECT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV OM PROJECT?

The professionals named in the filing: Architect: VIKRANT JERYAL; Engineer: Dilip Gambhir; Chartered Accountant: Shripati Gandhi Choudhari & Co.; Chartered Accountant: Shah & Taparia; Chartered Accountant: A S A P & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV OM PROJECT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV OM PROJECT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV OM PROJECT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.