SHIV MALHAR

By SHIV DEVELOPERS

RG-MH-85717 · RERA P52100052401 · Last updated on MahaRERA portal: 24 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
107 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

SHIV MALHAR is a Others project by SHIV DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052401 on 21 Aug 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 15 of the 122 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHIV MALHAR
  • TypeOthers
  • Location
    • Opp. Choudhary Park
    • Wakad Road
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100052401
  • ReraGenie IDRG-MH-85717

Builder

  • NameSHIV DEVELOPERS
  • Entity typePartnership
  • PartnerRAJENDRA GANPAT ZUNJARRAO
  • PartnerUDDHAV MURAR PATEL
  • Other registrations13 more →
  • Completed6 of 14
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2023First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Aug 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed108 files

Current status

12%15 of 122 units booked
43.4%Work done, per cost certificate

Figures as on 24 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A COMMERCIALNA7502020
WING B RESIDENTIALNA21171020102

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

WING A COMMERCIAL82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B RESIDENTIAL73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed327

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots327
Closed/Covered327
BuildingClosed/CoveredTotal
WING A COMMERCIAL120120
WING B RESIDENTIAL207207

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Nov 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNCIPAL CORPORATION
Permissible FSI15325.6
Proposed, not sanctioned15,326 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar, Pune
Estimated costRs 75.60 cr
Cost incurredRs 32.78 cr
Work done43.36%
BuildingWingEstimatedIncurred
WING A COMMERCIALNARs 75.60 crRs 32.78 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectProjection Studio
ArchitectSangram Salunke
EngineerMr Vinod Vasant Jagtap
Chartered AccountantPhule Wagh & Associates LLP wagh
Chartered AccountantPrasad Sadvilkar & Associates
Chartered AccountantS.U.RADHAKRISHNANI AND CO.
PartnerRole in project
SHIV DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18082622197Dec 2026 → Dec 2027

Reason as filed by the promoterWe, the Promoter M/s SHIV DEVELOPERS (through its partner and authorized signatory Mr. Rajendra Gannpat Zunjarroa) have hereby applied for extension for our registered project 'SHIV MALHAR' bearing MahaRERA Reg. No. P52100052401 till 31st December 2027. The significant reasons for the delay and their technical impact are as follows: 1. Delay in Sanctioning of TDR by Pimpri Chinchwad Municipal Corporation (PCMC): -The sanctioning/approval of the Transferable Development Rights (TDR) by PCMC was delayed due to administrative and procedural reasons. The TDR approval was an important prerequisite

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: From 5 25-26.pdf24 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf24 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf24 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf18 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf18 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Q1 FY 2026-27.pdf11 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1 FY 2026-27.pdf11 Jul 2026
Withdrawal Update Form 3File: Form 3 Shiv Malhar Chartered Accountant Certifiate Q1 FY 2026-27.PDF11 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Q4 FY 2025-26 Shiv Malhar FORM 3 Chartered Accountant Certificate 31032026.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 31122025.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31122025 Comp.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 Chartered Accountant Certificate 31122025 Comp.pdf9 Feb 2026
Layout approvalFile: Layout.pdf18 Nov 2025
Building plan approvalFile: Plan 1.pdf18 Nov 2025
Building plan approvalFile: Plan 2.pdf18 Nov 2025
Building plan approvalFile: Plan 3.pdf18 Nov 2025
Building plan approvalFile: Plan 4.pdf18 Nov 2025
Building plan approvalFile: Plan 5.pdf18 Nov 2025
Building plan approvalFile: Plan 6.pdf18 Nov 2025
Layout approvalFile: Layout.pdf13 Nov 2025
Building plan approvalFile: Plan 1.pdf13 Nov 2025
Building plan approvalFile: Plan 2.pdf13 Nov 2025
Building plan approvalFile: Plan 3.pdf13 Nov 2025
Building plan approvalFile: Plan 4.pdf13 Nov 2025
Building plan approvalFile: Plan 5.pdf13 Nov 2025
Building plan approvalFile: Plan 6.pdf13 Nov 2025
Form 1File: Form 1 Architect Certificate 30092025.pdf13 Nov 2025
Form 2File: Form 2 Engineer Certificate Q2.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold.pdf13 Nov 2025
Form 3File: Q2 FY 2025-26 Shiv Malhar FORM 3 Chartered Accountant Certificate 30092025 NEW.pdf13 Nov 2025
Form 1File: Architect Certificate Q1 FY 2025-26.pdf24 Jul 2025
Form 2File: Form 2 Engineer Certificate.pdf24 Jul 2025
Form 3File: Form 3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 2024-25 Shiv Malhar FORM 3 Chartered Accountant Certificate 31032025.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf18 Apr 2025
Declaration about Commencement CertificateFile: Scan22032025.pdf22 Mar 2025
Layout approvalFile: scan01.pdf21 Mar 2025
Building plan approvalFile: scan02.pdf21 Mar 2025
Building plan approvalFile: scan03.pdf21 Mar 2025
Building plan approvalFile: scan04.pdf21 Mar 2025
Building plan approvalFile: scan05.pdf21 Mar 2025
Building plan approvalFile: scan06.pdf21 Mar 2025
Building plan approvalFile: scan07.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: scan01.pdf21 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: SKM_36725031812160.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan02.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan03.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan04.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan05.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan06.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan07.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 2023-24.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration Sold Unsold.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration Sold Unsold.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE Q1 2024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Malhar FORM 3 Chartered Accountant Certificate 31032024.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Malhar FORM 3 Chartered Accountant Certificate 12022024.pdf15 Feb 2024
Proforma of Agreement for saleFile: AFS Draft.pdf3 Aug 2023
Deviation Report with respect to model copy of AgreementFile: SHIV DEVELOPERS.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form 3 upload.pdf1 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf1 Aug 2023
Copy of the legal title reportFile: Format A Search Upload Final 31072023.pdf31 Jul 2023

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV MALHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad Road13,700+ in Pune

Builder: SHIV DEVELOPERS

Shiv Developers has 14 registrations on MahaRERA, including SHREYASH SANKUL and SHIV SAMRUDHI - A WING. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHIV MALHAR is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV MALHAR?

The registered promoter entity is SHIV DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV MALHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV MALHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV MALHAR?

The professionals named in the filing: Architect: Projection Studio; Architect: Sangram Salunke; Engineer: Mr Vinod Vasant Jagtap; Chartered Accountant: Phule Wagh & Associates LLP wagh; Chartered Accountant: Prasad Sadvilkar & Associates; Chartered Accountant: S.U.RADHAKRISHNANI AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV MALHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV MALHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV MALHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.