Home / Browse projects / Nashik, Maharashtra / Shilpa Millennium
Shilpa Millennium
RG-MH-48947 · RERA P51600052884 · Last updated on MahaRERA portal: 19 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shilpa Millennium is a Commercial project by Shilpa Estate in Nashik, Maharashtra, registered with MahaRERA as P51600052884 on 5 Oct 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 0 of the 32 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameShilpa Millennium
- TypeCommercial
- Location
- Sharanpur Link Road
- Canada Corner
- Nashik
- Nashik (M Corp.)
- Nashik
- 422007
- Pincode422007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052884
- ReraGenie IDRG-MH-48947
Builder
- NameShilpa Estate
- Entity typePartnership
- GSTIN27AAJFS0255N1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersBhavik Jayesh Thakker, Jayesh Vallabhdas Thakker
- Other registrations4 more →
- Completed2 of 5
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 19 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shilpa Millennium | NA | 7 | 6 | 0 | 32 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.
Shilpa Millennium: 17% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed80
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shilpa Millennium | NA | Rs 11.00 cr | Rs 1.04 cr |
| - | NA | Rs 82.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pankaj Jadhav |
| Engineer | Mahindra Ukha Patil Ukha Patil |
| Chartered Accountant | CA PRASAD YEOLA PRASAD YEOLA |
| Chartered Accountant | BHALGAT BOTHRA & ASSOCIATES CA TUSHAR LOKHANDE |
| Partner | Role in project |
|---|---|
| Shilpa Estate | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: FORM 5.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: FORM 3 MARCH 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 Millennium.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Millennium.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Form 1 Millennium Sep 25.pdf | 18 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 SEPT 2025.pdf | 18 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 SEPT 2025_removed.pdf | 18 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Millennium june 25.pdf | 5 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf | 5 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 JUNE 2025.pdf | 5 Oct 2025 |
| Form 5 (FY 2024-2025)File: Shilpa Millenium annual Report- FY 2024-25.pdf | 30 Jul 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 MARCH 2024.pdf | 30 Jul 2025 |
| Form 1File: Form 1 Millennium March 25.pdf | 10 Jul 2025 |
| Form 2File: FORM 2 MARCH 2025.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 MARCH 2025 MILLENIUM_compressed.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 10 Jul 2025 |
| Form 1File: Form 1 Millennium JUNE 2024.pdf | 10 Jul 2025 |
| Form 2File: FORM 2 JUNE 2024.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 JUNE 2024 SHILPA Millinium.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 10 Jul 2025 |
| Form 1File: Form 1 Millennium SEPT 2024.pdf | 10 Jul 2025 |
| Form 2File: FORM 2 SEPT 2024.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 SEPT 2024 SHILPA Millinium.pdf | 10 Jul 2025 |
| Form 1File: Form 1 Millennium DEC 2024.pdf | 10 Jul 2025 |
| Form 2File: FORM 2 DEC 2024 MILLENNIUM.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 DEC 2024.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Millennium March 2024.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 MARCH 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: FORM 3 MARCH 2025 MILLENIUM_compressed.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Millennium March 2024.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Millennium JUNE 2024.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Millennium SEPT 2024.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Millennium DEC 2024.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2024.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Millennium DEC 2023.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers MARCH 2024.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2024.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2024 SHILPA Millinium.pdf | 1 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept 2024 SHILPA Millinium.pdf | 1 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2023.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2024.pdf | 16 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MARCH 2024.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Other - Finance.pdf | 21 Sep 2023 |
| Other - TechnicalFile: CA Certificate Form-3.pdf | 21 Sep 2023 |
| Proforma of Agreement for saleFile: Revise Agreement 2.pdf | 5 Sep 2023 |
| Other - TechnicalFile: CC Confirmation.pdf | 5 Sep 2023 |
| Copy of the legal title reportFile: Title Report.pdf | 24 Aug 2023 |
| Copy of the legal title reportFile: Title Report Shilpa Millenium_rotated_11zon (1).pdf | 24 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrance to Legal.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbranes to Finance.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrance to Legal.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Details of Encumbranes to Finance.pdf | 24 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 24 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Shilpa Millennium.pdf | 24 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviations of Allotment Letter.pdf | 24 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviations of AFS.pdf | 24 Aug 2023 |
| Layout approvalFile: PLAN-1_rotated (2 files merged).pdf | 23 Aug 2023 |
| Building plan approvalFile: PLAN-1_rotated (2 files merged).pdf | 23 Aug 2023 |
| PAN CardFile: Firm Pan Card.pdf | 23 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN-1_rotated (2 files merged).pdf | 23 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN-1_rotated (2 files merged).pdf | 23 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_Final.pdf | 23 Aug 2023 |
| Declaration about Commencement CertificateFile: Format D.PDF | 23 Aug 2023 |
| Declaration in FORM BFile: Form B_rotated.pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations 1.PDF | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations 2.pdf | 23 Aug 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 23 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Empire Marvel | Shilpa Estates Sumangal Builders House Sadhu Waswani Road Opp Holaram Colony Near MICO Circle Nashik 422002 | 120 | Completed | Aug 2022 | Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shilpa Millennium on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Canada Corner, Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
SHREE GANESH SRUSHTI
JYK NIRMITI INFRA LLP
BOLKAR MAJESTIC
GANESH TUKARAM BOLKAR
PALM TOWN
VAKRATUNDA PROPERTIES
Swaraj 1 and 2 BHK Homes
Kothawale Patil Builders And Developers Pv
HAPPY LIFE AT APNA GHAR PHASE V
M/S Shweta Infrastructure & Housing (I) Pv
Balaji Heights
Geeta Developers
See every Nashik project, with the district possession charts
Builder: Shilpa Estate
Shilpa Estate has 5 registrations on MahaRERA, including Empire Marvel and SHILPA ANANDVAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Shilpa Millennium is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shilpa Millennium?
The registered promoter entity is Shilpa Estate, a partnership as per the filing. Its GSTIN 27AAJFS0255N1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shilpa Millennium?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shilpa Millennium?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shilpa Millennium?
The professionals named in the filing: Architect: Pankaj Jadhav; Engineer: Mahindra Ukha Patil Ukha Patil; Chartered Accountant: CA PRASAD YEOLA PRASAD YEOLA; Chartered Accountant: BHALGAT BOTHRA & ASSOCIATES CA TUSHAR LOKHANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shilpa Millennium?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback