ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SHILPA - II

Registered No litigation declared Residential / Group Housing project

SHILPA - II

By SWOJAS ICON PROPERTIES LLP

RG-MH-85108 · RERA P52100053236 · Last updated on MahaRERA portal: 26 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
7 of 11Construction stages donefurthest along: Installation of Lifts, 50%
17 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

SHILPA - II is a Residential / Group Housing project by SWOJAS ICON PROPERTIES LLP in Pune, Maharashtra, registered with MahaRERA as P52100053236 on 23 Oct 2023. Possession is promised by 30 Oct 2026. The completion date has moved by 10 months from the original filing. 5 of the 22 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHILPA - II
  • TypeResidential / Group Housing
  • Location
    • KARVE ROAD NEAR NAL STOP
    • ERANDWANE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • RERA no.P52100053236
  • ReraGenie IDRG-MH-85108

Builder

  • NameSWOJAS ICON PROPERTIES LLP
  • Entity typePartnership
  • PartnersPARAG RAMESH TEPAN, PARAG VISHWAS SANE, ASHISH RASIKLAL SHAH, ASHUTOSH RASIKLAL SHAH, RAGHUNANDAN ASHOK BEHARAY

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion30 Oct 2026
  • Revised completionRevised to 30 Oct 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

23%5 of 22 units booked
76.6%Work done, per cost certificate

Figures as on 26 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHILPA - IINA7722022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

SHILPA - II: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area747 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Oct 2025
LandownerVillageDistrict
SWOJAS ICON PROPERTIES LLPPune (M Corp.)Pune
SHIPA - II CO OP HSG SOC LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2845.13
Proposed, not sanctioned2,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAGRAS ROAD AUNDH PUNE
Estimated costRs 10.62 cr
Cost incurredRs 8.13 cr
Work done76.59%
BuildingWingEstimatedIncurred
SHILPA - IINARs 10.24 crRs 8.06 cr
-NARs 37.50 lakhRs 7.40 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIRANJAN JOG
EngineerPARAG CHOPADA
EngineerNIRANJAN JOG
Chartered AccountantSIDDHARTH S SMART
PartnerRole in project
SWOJAS ICON PROPERTIES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028299Dec 2025 → Oct 2026

Reason as filed by the promoterThe Original date of Project completion was 31.12.2025, which was supposed to be 36 months as per the development agreement, but it was mistakenly considered as 24 months. The detailed letter of self-declaration has been attached to this application. kindly allow us the extended period.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q4 FY 25-26 SJHIPLA II.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q4 FY 25-26 SJHIPLA II.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4 FY 25-26 SJHIPLA II.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4 FY 25-26 SJHIPLA II.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q3 SHILPA FY 2526 FINAL SIGN.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 FY 25-26 SJHIPLA II.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q3 2526 SHILPA II.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 Q3 FY 2526 SHILPA II.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q3 SHILPA FY 2526 FINAL SIGN.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 Q1 2526 SHILPA.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1 Q2 FY2526 SHILPA II.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 Q1 SHILPA 2526.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 Q2 FY2526 SHILPA II.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 SHILPA Q1 2526.pdf20 Oct 2025
Withdrawal Update Form 3File: SHILPA II FORM 3 Q2 2526.pdf20 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHILPA Q1 2526.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 2526 SHILPA II_compressed.pdf19 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHILPA Q1 2526.pdf19 Jul 2025
Disclosure of sold/ booked inventoryFile: Shipla II Sold Unsold Inventory 30062025.pdf19 Jul 2025
Declaration in FORM BFile: 20250428164934.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Shipla II Sold Unsold Inventory 31032025.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHILPA 31032025.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHILPA II Q4 2425.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 FY 2425 - SHILPA II.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2425 SHILPA II_compressed.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 2425 SHILPA.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 2425 SHILPA.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold SHILPA Q3 2425.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 FY 2425 SHILPA II.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 FY 2425 SHILPA II.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 2425 SHILPA II.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 2425 SHILPA II.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1 FY 2425 SHILPA II.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 FY 2425 SHILPA II.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Shipla II Sold Unsold Inventory 30062024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Shipla II Sold Unsold Inventory 30092024.pdf23 Oct 2024
Layout approvalFile: 1 of 2.pdf25 Jun 2024
Building plan approvalFile: 2 of 2.pdf25 Jun 2024
Copy of Layout Approval (in case of layout)File: 1 of 2.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 of 2.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: cc 13062024.pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SWOJAS ICON PROPERTIES LLP MARCH 2024.pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: Shipla II Sold Unsold Inventory.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 FY 2324 SHILPA.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 FY 2324 - SHILPA II.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 FY 2324 - SHILPA II.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2324 SHILPA.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Q3 2324 SHILPA II SOLD UNSOLD.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 FY 2324 - SHILPA II.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 FY 2324 - SHILPA II.pdf5 Jan 2024
Building plan approvalFile: plan 22102023.pdf4 Jan 2024
Building plan approvalFile: 22102023.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 22102023.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 22102023.pdf4 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 22102023.pdf4 Jan 2024
Copy of the legal title reportFile: Format A.pdf11 Oct 2023
Details of encumbrances concerned to FinanceFile: Adobe Scan Sep 27, 2023 (1).pdf27 Sep 2023
Details of encumbrances concerned to LegalFile: Adobe Scan Sep 27, 2023 (1).pdf27 Sep 2023
CERSAI detailsFile: Adobe Scan Sep 27, 2023.pdf27 Sep 2023
Other - LegalFile: ASHUTOSH RASIKLAL SHAH.pdf26 Sep 2023
Building plan approvalFile: SANCTION 2.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION 2.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Project Registration.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - for Registration.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FOR Registration.pdf4 Sep 2023
Layout approvalFile: SANCTION 1.pdf29 Aug 2023
PAN CardFile: PAN_SWOJAS ICON LLP.pdf29 Aug 2023
Copy of Layout Approval (in case of layout)File: SANCTION 1.pdf29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf29 Aug 2023
Declaration about Commencement CertificateFile: Declaration Commnt Certificate.pdf29 Aug 2023
Declaration in FORM BFile: Form B Icon Properties.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AVT.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PRT.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PVS.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AARS.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RDB.pdf29 Aug 2023
Proforma of Agreement for saleFile: FLAT AGR RERA SHILPA 2.pdf29 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A Seperate bank Account.pdf29 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf29 Aug 2023

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 10 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHILPA - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE13,700+ in Pune

Builder: SWOJAS ICON PROPERTIES LLP

SWOJAS ICON PROPERTIES LLP has 1 registration on MahaRERA, including SHILPA - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHILPA - II is delayed beyond 30 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHILPA - II?

The registered promoter entity is SWOJAS ICON PROPERTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHILPA - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHILPA - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHILPA - II?

The professionals named in the filing: Architect: NIRANJAN JOG; Engineer: PARAG CHOPADA; Engineer: NIRANJAN JOG; Chartered Accountant: SIDDHARTH S SMART. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHILPA - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHILPA - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHILPA - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.